ML20031C471
| ML20031C471 | |
| Person / Time | |
|---|---|
| Site: | Satsop |
| Issue date: | 09/30/1981 |
| From: | Leddick R WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| To: | Stello V NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) |
| Shared Package | |
| ML20031C472 | List: |
| References | |
| GO3-81-2551, NUDOCS 8110070184 | |
| Download: ML20031C471 (1) | |
Text
-____-___
Washington Nblic Power Supply System Box 1223 Elma, Washington 98541- (206)482-4428
(
prr 1I Q OCT 61981m u.s. m September 30, 1981 4
G03-81-2551 kf.
7
/(%[TLF)N' Director of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington D. C.
20555 Attention: Mr. V. Stello Gentlemen:
Subject:
FROJECT NOS. 3 AND 5 00CKET NUMBERS 50-508 AND 50-509 INTERIM REPORT OF P0TENTIAL 10CFR50.55(e)
Please find attached a copy of the interim report provided to Region V of a potential 10CFR50.55(e) concerning concrete placement ABW-019
& 21-420.50.
Should you have any questions or desire further information, please contact me directly.
Very truly yours,
'/
R. S. Leddick Program Director, WNP-3/5 ct. :
J. Adams - PP&L-WO/A D. Smithpeter - BPA -WO/A Ebasco - New York -WO/A WNP-3/5 Files - Richland -WO/A 8110070184 810930" d O7
~
PDR ADOCK 05000508 S
pop '
TL i
G$
_ _ _ _ - _ - - - - - _