ML20031C425

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-029/76-06,on 750910-12.No Noncompliance Noted
ML20031C425
Person / Time
Site: Yankee Rowe
Issue date: 02/06/1976
From: Nelson P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Groce R
YANKEE ATOMIC ELECTRIC CO.
Shared Package
ML20031C426 List:
References
NUDOCS 8110070135
Download: ML20031C425 (2)


See also: IR 05000029/1976006

Text

~ *

-

IE FILE CORK

.

.

. . - -

UNITED STATES

NUCLEAR REGULATORY COMMISSION

RtC NJl

634 PARK AVtNUE

KING OF PRUS$1 A, PENNbif LV ANI A 19406

FEB G

1976

Yankee Atomic Electric Company

License No. DPR-3

Attention:

Mr. Robert 11. Groce

Inspection No. 76-05

Licensing Engineer

Docket No. 50- W ~

20 Turnpike Road

Westborough, Massachusetts

01581

Centlemen:

This refers to the verification tests performed during the inspection

corducted by Mr. Everett of this office on September 10-12, 1975 at the

Yankee Atomic Nuclear Power Station of activitics authorized by NRC

License No. DPR-3.

The results of that inspection are contained in our

letter dated September 30, 1975 which includes the Office of Inspection

,

and Enforcement Report No. 50-29/75-11.

M

!

AM

The results of our verification tests made at the time of the inspection

-

are included in the Office of inspection and Enforcenent Report which is

3

enclosed with this letter.

Other aspects of the inspection were previously

t-

discussed in the above referenced correspondence.

(

h

Within the scope of this inspection, no items of noncompliance were

.

observed.

i

In accordance with Section 2.790 of the NRC's " Rules of Practice",

Part 2, Title 10, Code of Federal Regulations, a copy of this

f

letter and the enclosed inspection report will be placed in the NRC's

f

Public Document Room.

If this report contains any inforration that you

g

(or you. contractor) believe to be proprietary, it is necessary that you

'

make a written application witnin 20 days to this office to withhold

j

such information from public disclosure. Any such application must

-

!

include a full statement of the reasons ot. tha basis of which it is

l

claimed that the information is proprietary, and should be prepared so

that proprietary infarnatica identified in the arplication is contained

L ,

!

" "'

in a separate part of the document.

If we do not hear from you in this

'

regard within the specified period, the report will be placed in the

,

Public Document Room.

(

t

b'

I

E

l

t -,

-

L

got.unoS

["v

d' Q #'e

i-

[

iS

bia

"

,

l

\\e@j

p

irre.gg@

,. ,

ei*

8110070135 76d206

-

-

PDR ADOCK 05000029

'l

O

PDR

g ,g

a

-

pg&

.

-'

.

.

,

,,

-

.

-2-

No reply to this letter is required; however, should you isave any

questions concerning this inspection, we will be pleased to discuss

them with you.

Sincerely,

s

Q.~//

f

'

Paul R. Nelson, Chief

Fuel Facility and Materials Safety

Branch

e .

Enclosure:

FC

IE:I Inspection Report No. 50-29/76-06

j;.d

d?if

ec:

H. Autio, Plant Superintendent

.gf;.

Donald G. Allen, President

.

.

>

-

bec:

IE Mai! 6 Files (For Appropriate Distribution)

'

PDR

Local FDR

[

NSIC

I

TIC

i

REG:I Reading Roca

I

Region Directors (II, III, IV)(Report Only)

f

State of !bssachusetts

!

.

1

f

1

1

-

l

l

l

,9

j

.:-

.

-

+4

'

.

w

.

-