Text
,
a
- r OPERATING DATA REPORT 50-155
- DOCKET NO.
DATE 1/Z/00 COMPLETED BY NHimebauch 010->+ /-6537 x 180 TELEPHONE OPERATING STATUS Notes
- 1. Unit Name:
Big Rock Point Plant December 1979 MDC increased from 61 MWE
- 2. Reporting Period:
to 63 MWE on 12/5/79 and 240
- 3. Licensed Thermal Power (MWt):
75 to 65 MWE on 12/23 due to
- 4. Nameplate RaHng (Gross MWe):
72 fuel thermal hydraulic limit
- 5. Design Electrical Rating (Net MWe):
69 margins.
- 6. Maximum Dependable Capacity (Gross MWe):
65
-Refueling Informa_ tion,Reque st Fonn
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since IIsYRepos.NYt$ns:"
of5hIsrp 65.0
- 9. Power Level To Which Restricted,if Any (Net MWe):
Fuel Thermal Hydraulic Limits
- 10. Reasons For Restrictions,if Any:
(l This Month Yr to.Date Cumulative 744.0 8760.0 146923.0
~
- 11. Hours In Reporting Period 742.3 2106.3 100133.0
- 12. Number Of Hours Reactor Was Critical 0
o
.o
- 13. Reactor Reserve Shutdown Hours 742.2 2061.9 97998.9
- 14. Hours Generator On-Line 0
0 0
l
- 15. Unit Reserve Shutdown Hours 156209.8 396380.7 18117931.2
- 16. Gross Thermal Energy Generated (MWH) 47415.0 120865.0 5735917.0
- 17. Gross Electrical Energy Generated (MWH)
~
44786.6 113675.9 5428339,2
- 18. Net Electrical Energy Generated (MWH) 99.8%
23.5%
66.7%
- 19. Unit Service Fa ctor
- 99. %
23.5%
66.7%
- 20. Unit Availability Factor 95.1%
20.6%
54.5%
- 21. Unit Capacity Factor (Using MDC Net) 83.6%
18.0%
51.3%
- 22. Unit Capacity Factor (Using DER Net) 0.0%
70.2%
25.9%.
- 23. Unit Forced Outage Rate
{
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each):
January 16, 1980
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast Achieved j
I INITIAL CRITICALITY i
INITIAL ELECTRICITY f
COMMERCIA L OPERATION gop7) 8110070005 900107 PDR ADOCK 05000155 R
3 50-155 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
UNIT NAME Big Kock Point DATE 1/7/80 COMPLETED BY NHimabauch REPORTMONT11 December 1979 TELEPHONE 616-547-6537 x 180 e,
.! ?
}
Y Licensee E
Cause & Correceive No.
Date g.
3g
,g5 Event.
3?
jb" 9-Action to
$ I.
c2 jgg Repori#
iN U Preveni Recurrence d
6 12/31/79 S
/.8 D
1 NA IB INSTRU Regulatory Shutdown:
SD xxxxxx to implement requirements of BA INSTRU NUREG-0578. (Relief valve position indication, manual reset of contain-ment isolation and core damage as-sessment radiation monitors).
n I
2 3
4 F: Forced Reason:
Method:
Exhibit G-Instructions S: Scheduled A-Equipment Failure (Explain) 1 Manual for Preparation of Data B-Maintenance of Test 2-Manual Scram.
Entry Sheets for Licensee C-Refueling 3-Automatic Scram.
Event Report (LER) File (NUREG.
D Regulatory Restriction 4 Other (Explain) 0161)
E Operator Training & Ucense Examination F Administrative 5
G-Operational Error (Explain)
Exhibit I - Same Source (9/77) llother (Explain)
AVERAGE DAILY UNIT POWER LEVEL
,7f 50-155 DOCKET NO.
Big Rock Point UNIT 1/7/80 o47g COMPLETED BY 616-547-6537 x 180 TELEPHONE December 1979 MONTH DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DitLY POWER LEVEL (MWe-Net)
(MWe-Net) 60 I
17 60 2
59 33 59 60 3
j, 60 4
59 20 60 61 5
61 60 6
61 61 7
3
(
61 61 8
24 61 25 61 61 61 10 26 60 61 11 27 60 61 12 28 60 61 13 29 60 61 30 60 53 15 31 61 16 l
INSTRUCTIONS l
On this fctmat list the average daily unit power levelin MWe Net for each day in the reporting month. Compute to the nearest whole megawatt.
l i
(4/77)
I l
L
....