Monthly Operating Rept for Dec 1979
ML20031C263
Person / Time
Site: Big Rock Point File:Consumers Energy icon.png
Issue date: 01/07/1980
From: Himebauch N
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
Shared Package
ML20031C260 List:
References
NUDOCS 8110070005
Download: ML20031C263 (3)


Text

,

a

  • r OPERATING DATA REPORT 50-155

- DOCKET NO.

DATE 1/Z/00 COMPLETED BY NHimebauch 010->+ /-6537 x 180 TELEPHONE OPERATING STATUS Notes

1. Unit Name:

Big Rock Point Plant December 1979 MDC increased from 61 MWE

2. Reporting Period:

to 63 MWE on 12/5/79 and 240

3. Licensed Thermal Power (MWt):

75 to 65 MWE on 12/23 due to

4. Nameplate RaHng (Gross MWe):

72 fuel thermal hydraulic limit

5. Design Electrical Rating (Net MWe):

69 margins.

6. Maximum Dependable Capacity (Gross MWe):

65

-Refueling Informa_ tion,Reque st Fonn

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since IIsYRepos.NYt$ns:"

of5hIsrp 65.0

9. Power Level To Which Restricted,if Any (Net MWe):

Fuel Thermal Hydraulic Limits

10. Reasons For Restrictions,if Any:

(l This Month Yr to.Date Cumulative 744.0 8760.0 146923.0

~

11. Hours In Reporting Period 742.3 2106.3 100133.0
12. Number Of Hours Reactor Was Critical 0

o

.o

13. Reactor Reserve Shutdown Hours 742.2 2061.9 97998.9
14. Hours Generator On-Line 0

0 0

l

15. Unit Reserve Shutdown Hours 156209.8 396380.7 18117931.2
16. Gross Thermal Energy Generated (MWH) 47415.0 120865.0 5735917.0
17. Gross Electrical Energy Generated (MWH)

~

44786.6 113675.9 5428339,2

18. Net Electrical Energy Generated (MWH) 99.8%

23.5%

66.7%

19. Unit Service Fa ctor
99. %

23.5%

66.7%

20. Unit Availability Factor 95.1%

20.6%

54.5%

21. Unit Capacity Factor (Using MDC Net) 83.6%

18.0%

51.3%

22. Unit Capacity Factor (Using DER Net) 0.0%

70.2%

25.9%.

23. Unit Forced Outage Rate

{

24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each):

January 16, 1980

25. If Shut Down At End Of Report Period. Estimated Date of Startup:
26. Units In Test Status (Prior to Commercial Operation):

Forecast Achieved j

I INITIAL CRITICALITY i

INITIAL ELECTRICITY f

COMMERCIA L OPERATION gop7) 8110070005 900107 PDR ADOCK 05000155 R

PDR

3 50-155 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

UNIT NAME Big Kock Point DATE 1/7/80 COMPLETED BY NHimabauch REPORTMONT11 December 1979 TELEPHONE 616-547-6537 x 180 e,

.! ?

}

Y Licensee E

Cause & Correceive No.

Date g.

3g

,g5 Event.

3?

jb" 9-Action to

$ I.

c2 jgg Repori#

iN U Preveni Recurrence d

6 12/31/79 S

/.8 D

1 NA IB INSTRU Regulatory Shutdown:

SD xxxxxx to implement requirements of BA INSTRU NUREG-0578. (Relief valve position indication, manual reset of contain-ment isolation and core damage as-sessment radiation monitors).

n I

2 3

4 F: Forced Reason:

Method:

Exhibit G-Instructions S: Scheduled A-Equipment Failure (Explain) 1 Manual for Preparation of Data B-Maintenance of Test 2-Manual Scram.

Entry Sheets for Licensee C-Refueling 3-Automatic Scram.

Event Report (LER) File (NUREG.

D Regulatory Restriction 4 Other (Explain) 0161)

E Operator Training & Ucense Examination F Administrative 5

G-Operational Error (Explain)

Exhibit I - Same Source (9/77) llother (Explain)

AVERAGE DAILY UNIT POWER LEVEL

,7f 50-155 DOCKET NO.

Big Rock Point UNIT 1/7/80 o47g COMPLETED BY 616-547-6537 x 180 TELEPHONE December 1979 MONTH DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DitLY POWER LEVEL (MWe-Net)

(MWe-Net) 60 I

17 60 2

59 33 59 60 3

j, 60 4

59 20 60 61 5

61 60 6

61 61 7

3

(

61 61 8

24 61 25 61 61 61 10 26 60 61 11 27 60 61 12 28 60 61 13 29 60 61 30 60 53 15 31 61 16 l

INSTRUCTIONS l

On this fctmat list the average daily unit power levelin MWe Net for each day in the reporting month. Compute to the nearest whole megawatt.

l i

(4/77)

I l

L

....