ML20031C092
| ML20031C092 | |
| Person / Time | |
|---|---|
| Site: | Hope Creek |
| Issue date: | 09/17/1981 |
| From: | Keimig R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Martin T Public Service Enterprise Group |
| Shared Package | |
| ML20031C093 | List: |
| References | |
| NUDOCS 8110060535 | |
| Download: ML20031C092 (2) | |
See also: IR 05000354/1981013
Text
,
.
.- - _
.
.
'
.
,
SEP 1'l 1981
Docket Nos. 50-354
,\\f
M
50-355
(7
b
Public Service Electric & Gas Company
ATTN:
Mr. Y. J. Martin
,.:
Oc7
h
-1
-
6
Vice Presider.t
~ \\ ' u.,%p*19g ')
-
Engineering and Construction
,'
80 Park Plaza - 17C
s
Newark, New Jersey 07101
g
f-
Gentlemen:
D I'@
Subject:
Inspections 50-354/81-13; 50-355/81-13
This refers to the routine ins ;ction conducted by Mr. S. Chaudhary of this
office on August 14-21, 1981 at Hope Creek Generating ! ation, Units 1 and
~
2, Hancocks Bridge, New Jersey of activities authorized by NRC License Nos.
CPPR-120 and CPPR-121 and to the discussions of our findings held by Mr.
Chaudhary with A.E. Giardino of year staff at the conclusion of the inspection.
Are. sxamined during this inspection are dei,cribed in the Office of Inspection
and Enforcement Inspection Report which is enclosed with this letter.
Within these areas, the inspection consisted of selective examir. Llons of
procedures and representative records, interviews with personnel, and
observations by the inspector.
Within the scope of this inspection, no items of noncompliance were observed.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter and the enclosed inspection report will be placed in the NRC's
Public Document Room.
If this report contains any information that you (or
your contractors) believe to be exempt from disclosure under 10 CFR 9.5(a)(4),
it is necessary that you (a) notify this office by telephone within ten
(10) days from the date of this letter of your intention to file a request
for withholding; and (b) submit within 25 days from the date of this letter
a written application to this office to withhold such information. Consistent
with section 2.790(b)(1), any such application must be accompanied by an
affidavit executed by the owner of the information which identifies the
document or part sought to be withheld, and whic contains a full statement-
QL,
R1:DETI
$1:DETI
R1 DETT
R1:Q,BP"
R1 RPI
, RI:DETI
Chaudhary/wbhiripp
f.:MartinGre# Tem 5,K imig
9/9/81
ja/9/81
9//af/81
9/ 4/81
9//4 /81
l'
[
OFFICIAL RECORD COPY
SP I
k
i
hDft
'
DO
OO
4
G
L_.
.
.
.
Public Service Electric and Gas Company
2
of the reasons on the basis which it is claimed that the information should
be withheld from public disclosure. This section further requires the
statement to address with specificity the considerations listed in 10 CFR 2.790(b)(4). The information sought to be withheld shall be incorpcrated
as far as possible into a separate part of the affidavit.
If we do not
hear from you in this regard within the specified periods noted above, the
report will be placed in the Public Document Room. The telephone notification
of your intent to request withholding, or any request for an extension of
the 10 day period which you believe necessary, si:ould be made to the Supervisor,
Files, Mail and Records, USNRC Region I, at (215) 337-5223.
No reply to this letter is required; however, should you have any questions
concerning this inspection, we will be pleased to discuss them with you.
.
Sincerely,
OrL8tua181 ned Byg
8
R. R. Keimig, Chief
Projects Branch #2, Division of
Resident and Project Inspection
Enclosure:
Combined Office of Inspection and Enforcement Inspection
Report Number 50-354/81-13; 50-355/81-13
cc w/ encl:
J. Boettger, General Manager, Corporate QA
Public Document Room (PDR)
Local Public Document Rocm (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
.
State of New Jersey
bec w/ enc 1:
Region I Docket Room (with concurrences)
Chief, Operational Support Section (w/o encl)
0FFICIAL RECORD COPY
.
.
,
b
l