ML20031C080
| ML20031C080 | |
| Person / Time | |
|---|---|
| Site: | FitzPatrick |
| Issue date: | 09/14/1981 |
| From: | Brunner E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Pasternak R POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK |
| Shared Package | |
| ML20031C081 | List: |
| References | |
| NUDOCS 8110060521 | |
| Download: ML20031C080 (2) | |
See also: IR 05000333/1981017
Text
~
^
(
,
.
.
.
SEP.14 y
Docket No. 50-333
W
4
Power Authority of the State of New York
b
ON k(ff}/(p)/
James A. FitzPatrick Nuclear Power Plant
jj g
-
'3
ATTN: Mr. R. J. Pasternak
27
c igg;_ '8
Resident Manager
P. O. Box 41
3 OCT
__
.
Lycoming, New York 13093
p. s.
mm
Gentlemen:
(.
Subject:
Inspection 50-333/81-17
k$l
This tsfers to the routine safety inspection conducted by Mr. A. Finkel of
this office on August 17-21, 1981 at the James A. FitzPatrick Nuclear
Plant, Lycoming, New York of activities authorized by NRC License No. OPR-
59 and to the discussions of our findings held by Mr. Finkel with Mr. R.J.
Pasternak at the conclusion of the inspection.
Areas examined daring this inspection are described in the Office of Inspection
and Enforcement Inspection Report which is enclosed with this letter.
Within these areas, the inspection consisted of selective examinations of
procedures and representative records, interviews with personnel, and
observations by the inspector.
Our inspector also verified the steps you have taken to correct the items
of noncompliance brought to your attention in the enclosure to our letter
dated March 25, 1981. We have no further questions regarding your action
at this time. With regard to these noncompliances, the long term corrective
action will be reviewed on a future inspection.
Within the scope of this inspection, no items of noncompliance were observed.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter and the enclosed inspection report will be placed in the NRC's
Public Document Room.
If this report contains any information that you (or
your contractors) believe to be exempt from disclosure under 10 CFR 9.5(a)(4),
it is necessary that you (a) notify this office by telephone within ten
'
R
E
R1:DETI
R1
RI:DETI
Finkel/wb
Ebneter
Kister
Brunn
9/2/01
9/g/81
9////81
9/jg/81
0FFICIAL RECORD COPY
Skt
8110060521 810914
PDR ADOCK 05000333
G
pon
-
-
a
_
,
.
_
._
__
_ _ _ _ - _ _ _
.
.
d
Power Authority of the State of New York
2
(10) days from the date of this letter of your intention to file a request
for withholding; and (b) submit within 25 days from the date of this letter
a written application to this office to vithhold such information. Consistent
with section 2.790(b)(1), any such application must be accompanied by an
affidavit executed by the owner of the inprmation which identifies the
document or part sought to be withheld, an; which contains a full statement
of the reasons on the basis which it is claimed that the information should
be withheld from public disclosure. This section further requires the
statament to address with specificity the considerations listed in 10 CFR 2.790(b)(4). The information sought to be withheld shcll be incorporated
as far as possible into a separate part of the affidavit.
If we do not
hear from you in this regard within the specified periods noted above, the
report will be placed in the Public Document Room.
The telephone notification
of your intent to request withholding, or any request for an extension of
the 10 day period which you believe necessary, should be made to the Supervisor,
Files, Mail and Records, USNRC Region I, at (215) 337-5223.
l
No reply to this letter is required; however, if you have any questions
l
concerning this inspection, we will be pleased to discuss them ulth you.
Sincerely,
.
. S. hY
,
Eldon J. Brunner, Chief, Projects
>
Branch #1, Division of Resident
and Project Inspection
Enclosure: Office of Inspection and Enforcement Inspection
Report Number 50-333/81-17
f
cc w/ enc 1:
George T. Berry, President and Chief Operating Officer
J. P. Bayne, Senior Vice President-Naclear Generation
A. Klausmann, Director, Quality Assurance
M. C. Cosgrove, Site Quality Assurance Engineer
J. F. Davis, Chairman, Safety Review Committee
C. M. Pratt, Assistant General Counsel
G. M. Wilverding, Manager-Nuclear Licensing
Public Document Room (PDR)
local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
State of New York
bec w/ encl:
Region I Docket Room (with concurrences)
Chief, Operational Support Section (w/o encl)
0FFICIAL RECORD COPY
.