Forwards IE Insp Rept 50-333/81-17 on 810817-21.No Noncompliance Noted
ML20031C080
Person / Time
Site: FitzPatrick 
Issue date: 09/14/1981
From: Brunner E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Pasternak R
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
Shared Package
ML20031C081 List:
References
NUDOCS 8110060521
Download: ML20031C080 (2)


See also: IR 05000333/1981017

Text

~

^

(

,

.

.

.

SEP.14 y

Docket No. 50-333

W

4

Power Authority of the State of New York

b

ON k(ff}/(p)/

James A. FitzPatrick Nuclear Power Plant

jj g

-

'3

ATTN: Mr. R. J. Pasternak

27

c igg;_ '8

Resident Manager

P. O. Box 41

3 OCT

__

.

Lycoming, New York 13093

p. s.

mm

Gentlemen:

(.

Subject:

Inspection 50-333/81-17

k$l

This tsfers to the routine safety inspection conducted by Mr. A. Finkel of

this office on August 17-21, 1981 at the James A. FitzPatrick Nuclear

Plant, Lycoming, New York of activities authorized by NRC License No. OPR-

59 and to the discussions of our findings held by Mr. Finkel with Mr. R.J.

Pasternak at the conclusion of the inspection.

Areas examined daring this inspection are described in the Office of Inspection

and Enforcement Inspection Report which is enclosed with this letter.

Within these areas, the inspection consisted of selective examinations of

procedures and representative records, interviews with personnel, and

observations by the inspector.

Our inspector also verified the steps you have taken to correct the items

of noncompliance brought to your attention in the enclosure to our letter

dated March 25, 1981. We have no further questions regarding your action

at this time. With regard to these noncompliances, the long term corrective

action will be reviewed on a future inspection.

Within the scope of this inspection, no items of noncompliance were observed.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC's

Public Document Room.

If this report contains any information that you (or

your contractors) believe to be exempt from disclosure under 10 CFR 9.5(a)(4),

it is necessary that you (a) notify this office by telephone within ten

'

R

E

R1:DETI

R1

RI:DETI

Finkel/wb

Ebneter

Kister

Brunn

9/2/01

9/g/81

9////81

9/jg/81

0FFICIAL RECORD COPY

CPI

Skt

8110060521 810914

PDR ADOCK 05000333

G

pon

-

-

a

_

,

.

_

._

__

_ _ _ _ - _ _ _

.

.

d

Power Authority of the State of New York

2

(10) days from the date of this letter of your intention to file a request

for withholding; and (b) submit within 25 days from the date of this letter

a written application to this office to vithhold such information. Consistent

with section 2.790(b)(1), any such application must be accompanied by an

affidavit executed by the owner of the inprmation which identifies the

document or part sought to be withheld, an; which contains a full statement

of the reasons on the basis which it is claimed that the information should

be withheld from public disclosure. This section further requires the

statament to address with specificity the considerations listed in 10 CFR 2.790(b)(4). The information sought to be withheld shcll be incorporated

as far as possible into a separate part of the affidavit.

If we do not

hear from you in this regard within the specified periods noted above, the

report will be placed in the Public Document Room.

The telephone notification

of your intent to request withholding, or any request for an extension of

the 10 day period which you believe necessary, should be made to the Supervisor,

Files, Mail and Records, USNRC Region I, at (215) 337-5223.

l

No reply to this letter is required; however, if you have any questions

l

concerning this inspection, we will be pleased to discuss them ulth you.

Sincerely,

.

. S. hY

,

Eldon J. Brunner, Chief, Projects

>

Branch #1, Division of Resident

and Project Inspection

Enclosure: Office of Inspection and Enforcement Inspection

Report Number 50-333/81-17

f

cc w/ enc 1:

George T. Berry, President and Chief Operating Officer

J. P. Bayne, Senior Vice President-Naclear Generation

A. Klausmann, Director, Quality Assurance

M. C. Cosgrove, Site Quality Assurance Engineer

J. F. Davis, Chairman, Safety Review Committee

C. M. Pratt, Assistant General Counsel

G. M. Wilverding, Manager-Nuclear Licensing

Public Document Room (PDR)

local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

State of New York

bec w/ encl:

Region I Docket Room (with concurrences)

Chief, Operational Support Section (w/o encl)