ML20031B962

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-423/81-08 on 810713-31 & 0803-14 & Notice of Violation
ML20031B962
Person / Time
Site: Millstone 
Issue date: 09/17/1981
From: Brunner E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Counsil W
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML20031B963 List:
References
NUDOCS 8110060282
Download: ML20031B962 (2)


See also: IR 05000423/1981008

Text

v

y

h

.

.

,

SEP 171981

.L%

Docket ho. 50-423

Northeast Nuclear Energy Company

Y

D

ATTN: Mr. W. G. Counsil

'

~y

Senior Vice President - Nuclear

J

I

OCT

Engineering and Operations Group

6 JSg7 A 7

P. O. Box 270

W . ,"%

8

' ' '

Hartford, Connecticut 06101

C

Gentlemen:

Subject:

Inspection 81-08

This refers to the routine safety inspection conducted by Mr. J. Mattia of

this office on July 13-31 and August 3-14, 1981 at the Millstone Nuclear Power

Station, Unit 3, Waterford, Connecticut of activities authorized by NRC License

No. CPPR-113 and to the discussions of our findings held by Mr. Mattia with

Mr. S. Orefice and others of your staff at the conclusion of the inspection.

Areas examined during this inspection are described in the Office of Inspection

and Enforcement Inspection Report which is enclosed with this letter. Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observations by the

inspector.

Based on the results of this inspection, it appears that certain of your

activities were not conducted in full compliance with NRC requirements, as set

forth in the Notice of Violation, enclosed herewith as Appendix A.

These

items of noncompliance have been categorized into the levels described in uhe

Federal Register Notice (45 FR 66754) dated October 7,1980. You are required

to respond to this letter and in preparing your response, you should follow

the instructions in Appendix A.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosures will be placed in the NRC's Public Document

Room.

If this report contains any information that you (or your contractors)

believe to be exempt from disclosure under 10 CFR 9.5(a)(4), it is necessary

that you (a) notify this office by telephone within ten (10) days from the

date of this letter of your intention to file a request for withholding; and

(b) submit within 25 days from the date of this letter a written application

to this office to withhold such information. Consistent with section 2.790(b)(1),

any such application must be accompanied by an affidavit executed by the owner

of the information which identifies the document or part sought to be withheld,

and which contains a full statement of the reasons on the basis which it is

claimed that the information should be withheld rom public disclosure. This

',

C%

61kI:DE&TI

1:DR&PI

/ ' DDR&PI

RI R&h

t

Ir pp/cgl

s tia

i

l'sasser

Brunner

'

9

/81

l

OFFICIAL RECORD COPY

p

8110060282 810917

Il

PDR ADOCK 05000423

a

PDR

-

.

- .

-

-

-

-

,

._-

_ _ _

_ _ - _ _ _ _ _ _ _

.- _

_

.

.

,

Northeast Nuclear Energy Company

2

SEP 171981

section further requires the statement to aadress with specificity the consider-

ations listed in 10 CFR 2.790(b)(4). The inforrration sought to be withheld

'

shall be incorporated as far as possible into a separate part of the affidavit.

If we do not hear from you in this regard within the specified periods noted

above, the report will be placed in the Public Document Room. The telephone

notification of your intent to request withholding, or any request for an

extension of the 10 day period which you believe necessary, should be made to

the Supervisor, Files, Mail and Records, USNRC Region I, at (215) 337-5223.

Should you have any questions concerning this inspection, we will be pleased

to discuss them with you.

Sincerely,

OMsinal Signed Bf 8} {.

Og

Eldon J. Brunner, Chief, Projects

Branch #1, Division of Resident

and Project Inspection

Enclosures:

.

1.

Appendix A, Notice of V!olation

i

2.

Office of Inspection and Enforcement Inspection

Report Number 81-08

cc w/encis:

K. W. Gray, Construction Quality Assurance Supervisor

E. R. Foster, Director of Generation Construction

J. F. Opeka, Vice President, Nuclear Operations

R. T. Laudenat, Manager, Generation Facilities Licensing

D. G. Diedrick, Manager of Quality Assurance

i

i

Public Document Room (PDR)

i

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

,

State of Connecticut

bec w/encis:

Region I Docket Room (with concurrences)

Chief, Operational Support Section (w/o encis)

0FFICIAL RECORD COPY

.

,