ML20031B962
| ML20031B962 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 09/17/1981 |
| From: | Brunner E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Counsil W NORTHEAST NUCLEAR ENERGY CO. |
| Shared Package | |
| ML20031B963 | List: |
| References | |
| NUDOCS 8110060282 | |
| Download: ML20031B962 (2) | |
See also: IR 05000423/1981008
Text
v
y
h
.
.
,
SEP 171981
.L%
Docket ho. 50-423
Northeast Nuclear Energy Company
Y
D
ATTN: Mr. W. G. Counsil
'
~y
Senior Vice President - Nuclear
J
I
OCT
Engineering and Operations Group
6 JSg7 A 7
P. O. Box 270
W . ,"%
8
' ' '
Hartford, Connecticut 06101
C
Gentlemen:
Subject:
Inspection 81-08
This refers to the routine safety inspection conducted by Mr. J. Mattia of
this office on July 13-31 and August 3-14, 1981 at the Millstone Nuclear Power
Station, Unit 3, Waterford, Connecticut of activities authorized by NRC License
No. CPPR-113 and to the discussions of our findings held by Mr. Mattia with
Mr. S. Orefice and others of your staff at the conclusion of the inspection.
Areas examined during this inspection are described in the Office of Inspection
and Enforcement Inspection Report which is enclosed with this letter. Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observations by the
inspector.
Based on the results of this inspection, it appears that certain of your
activities were not conducted in full compliance with NRC requirements, as set
forth in the Notice of Violation, enclosed herewith as Appendix A.
These
items of noncompliance have been categorized into the levels described in uhe
Federal Register Notice (45 FR 66754) dated October 7,1980. You are required
to respond to this letter and in preparing your response, you should follow
the instructions in Appendix A.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter and the enclosures will be placed in the NRC's Public Document
Room.
If this report contains any information that you (or your contractors)
believe to be exempt from disclosure under 10 CFR 9.5(a)(4), it is necessary
that you (a) notify this office by telephone within ten (10) days from the
date of this letter of your intention to file a request for withholding; and
(b) submit within 25 days from the date of this letter a written application
to this office to withhold such information. Consistent with section 2.790(b)(1),
any such application must be accompanied by an affidavit executed by the owner
of the information which identifies the document or part sought to be withheld,
and which contains a full statement of the reasons on the basis which it is
claimed that the information should be withheld rom public disclosure. This
',
C%
61kI:DE&TI
1:DR&PI
/ ' DDR&PI
RI R&h
t
Ir pp/cgl
s tia
i
l'sasser
Brunner
'
9
/81
l
OFFICIAL RECORD COPY
p
8110060282 810917
Il
PDR ADOCK 05000423
a
-
.
- .
-
-
-
-
,
._-
_ _ _
_ _ - _ _ _ _ _ _ _
.- _
_
.
.
,
Northeast Nuclear Energy Company
2
SEP 171981
section further requires the statement to aadress with specificity the consider-
ations listed in 10 CFR 2.790(b)(4). The inforrration sought to be withheld
'
shall be incorporated as far as possible into a separate part of the affidavit.
If we do not hear from you in this regard within the specified periods noted
above, the report will be placed in the Public Document Room. The telephone
notification of your intent to request withholding, or any request for an
extension of the 10 day period which you believe necessary, should be made to
the Supervisor, Files, Mail and Records, USNRC Region I, at (215) 337-5223.
Should you have any questions concerning this inspection, we will be pleased
to discuss them with you.
Sincerely,
OMsinal Signed Bf 8} {.
Og
Eldon J. Brunner, Chief, Projects
Branch #1, Division of Resident
and Project Inspection
Enclosures:
.
1.
Appendix A, Notice of V!olation
i
2.
Office of Inspection and Enforcement Inspection
Report Number 81-08
cc w/encis:
K. W. Gray, Construction Quality Assurance Supervisor
E. R. Foster, Director of Generation Construction
J. F. Opeka, Vice President, Nuclear Operations
R. T. Laudenat, Manager, Generation Facilities Licensing
D. G. Diedrick, Manager of Quality Assurance
i
i
Public Document Room (PDR)
i
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
,
State of Connecticut
bec w/encis:
Region I Docket Room (with concurrences)
Chief, Operational Support Section (w/o encis)
0FFICIAL RECORD COPY
.
,