ML20031B784
| ML20031B784 | |
| Person / Time | |
|---|---|
| Site: | Callaway |
| Issue date: | 09/22/1981 |
| From: | Norelius C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Bryan J UNION ELECTRIC CO. |
| Shared Package | |
| ML20031B785 | List: |
| References | |
| NUDOCS 8110060086 | |
| Download: ML20031B784 (2) | |
See also: IR 05000483/1981020
Text
.
.
SEP 22 2
N
&
%
Docket No. 50-483-
{ (
T9'
Union Electric Company
p
I
- w
8
ATTN:
Mr. John K. Bryan
. -
L-
/g / . '
g%
Vice President - Nuclear
Post Office Box 149
gj
%
/f
St. Louis, MO 63166
/4
Gentlemen:
This refers to the routine safety inspection conduct.ed by Messrs. R. S. Love
and R. Mendez of this office on August 25-28, 1981, of activities at Callaway
Nuclear Power Generating Plant, Unit 1, authorized by NRC Construction Permit
No. CPPR-139 and to the discussion r
our findings with W. H. Weber at the
conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and in-
terviews with personnel.
No items of noncompliance with NRC requirements were identified during the
course of *;hir .aspection.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter and the enclosed inapection report will be placed in the NRC's
(
Public Document Room.
If this report contains any information that you or
your contractors believe to be exempt from disclosure under 10 CFR 9.5(a)(4),
it is necessary that you (a) notify this office by telephone within seven (7)
days from the date of this letter of your intention to file a request for
withholding; and (b) submit within twenty-five (25) days from the date of
this letter a written application to this office to withhold such infor-
mation. Section 2.790(b)(1) requires that any such application must be
accompanied by an affidavit executed by the owner of the information which
identifies the document or part sought to be withheld, and which contains
a full statement of the reasons which are the bases for the claim that the
information should be withheld from public disclosure. This section further
II
8110060086 810922
PDR ADOCK 05000483
0
,
-- ---
-
-
--
-
-
-
-
-
-
_
.
.
Union Electric Company
-2-
g
require the statement to address with specificity the considerations listed
in 10 CFR 2.790(b)(4). The information sought to be withheld shall be incor-
porated as f ar as possible into a separate part of the affidavit.
If we do
not hear from you in this regard within the specified periods noted above, a
copy of this letter and the enclosed inspection report will be placed in the
Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
" Original Slgned by C.E. Morellus"
C. E. Norelius, Director
Division of Engineering and
Technical Inspection
Enclosure:
IE Inspection
Peport No. 50-483/81-20
cc w/ enc 1:
W. H. Weber, Manager
Nuclear Construction
DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII
Region IV
K. Drey
Ronald Fluegge, Utility
Division, Missouri Public
(
Service Commission
MIJ
RIII
RIII
RIII
RIII
Lo(vfso
Dr
Rp(lI
915
G3y
No'jN1rSii n'
.
.
./
Mendez
Hawkins
&' Konklin
Williams
9/11/81
M
9ld *
/
/Illi}[t