ML20031A872
| ML20031A872 | |
| Person / Time | |
|---|---|
| Site: | Cook |
| Issue date: | 08/18/1981 |
| From: | Shaller D INDIANA MICHIGAN POWER CO. |
| To: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| References | |
| NUDOCS 8109280321 | |
| Download: ML20031A872 (1) | |
Text
.
h
&,;,, INDIANA & MICHIGAN ELECTRIC COMPANY DONALD C. COOK NUCLEAR PLANT P.O. Box 458, Bridgman. Michigan 49106 (616) 465-6901 g @ f, rg' s q,
' i);
l h,o_[;,,,^
August 18, 1981 Q
tv, Mr. J.G. Keppler, Regional Director iU \\
Office of Inspection and Enforcement
\\Z Q('
United States Nuclear Regulatory Commission
\\}"?..
Region III s' W O i s
799 Roosevelt Road Glen Ellyn, IL 60137 Operating License DPR-58 and DPR-74 Docket No. 50-315 and 50-316
Dear Mr. Keppler:
This is to confirm my telephone report utilizing the red phone at 1530 hours0.0177 days <br />0.425 hours <br />0.00253 weeks <br />5.82165e-4 months <br /> on August 17, 1981, and subsequent notification to your Region III Inspector, Mr. E. Swanson. The purpose of this call was to advise the Nuclear Regulatory Commission that a seismic inadequacy existed in addition to that reported on August 14, 1981, concerning the structural anchorage for certain pieces of equipment comprising the Unit 1 and 2 Electrical Power Systems.
A followup report will be submitted by August 30, 1981.
Sincerely, D.V. Shaller Plant Manager
/bab cc:
J.E. Dolan go/
A R.S. Hunter R.W. Jurgensen i
R.F. Kroeger
/
K.J. Vehstedt
// O E. Swanson/N. DuBry R0:III R.C. Callon MPSC G. Charnoff, Esq.
J.M. Hennigan W. Lavallee EPRI PNSRC J.F. Stietzel E.L. Townley Dir., IE (40 copies) n i,-
n11PC (4 copies)
'9109280321 810818 AUG ? 01981 JDr.ADOCK 050003f{
_