ML20031A872

From kanterella
Jump to navigation Jump to search
Ro:On 810817,seismic Inadequacy Found,In Addition to That Reported on 810814,in Structural Anchorage for Equipment in Electrical Power Sys.Followup Rept to Be Submitted by 810830
ML20031A872
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 08/18/1981
From: Shaller D
INDIANA MICHIGAN POWER CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
NUDOCS 8109280321
Download: ML20031A872 (1)


Text

.

h

&,;,, INDIANA & MICHIGAN ELECTRIC COMPANY DONALD C. COOK NUCLEAR PLANT P.O. Box 458, Bridgman. Michigan 49106 (616) 465-6901 g @ f, rg' s q,

' i);

l h,o_[;,,,^

August 18, 1981 Q

tv, Mr. J.G. Keppler, Regional Director iU \\

Office of Inspection and Enforcement

\\Z Q('

United States Nuclear Regulatory Commission

\\}"?..

Region III s' W O i s

799 Roosevelt Road Glen Ellyn, IL 60137 Operating License DPR-58 and DPR-74 Docket No. 50-315 and 50-316

Dear Mr. Keppler:

This is to confirm my telephone report utilizing the red phone at 1530 hours0.0177 days <br />0.425 hours <br />0.00253 weeks <br />5.82165e-4 months <br /> on August 17, 1981, and subsequent notification to your Region III Inspector, Mr. E. Swanson. The purpose of this call was to advise the Nuclear Regulatory Commission that a seismic inadequacy existed in addition to that reported on August 14, 1981, concerning the structural anchorage for certain pieces of equipment comprising the Unit 1 and 2 Electrical Power Systems.

A followup report will be submitted by August 30, 1981.

Sincerely, D.V. Shaller Plant Manager

/bab cc:

J.E. Dolan go/

A R.S. Hunter R.W. Jurgensen i

R.F. Kroeger

/

K.J. Vehstedt

// O E. Swanson/N. DuBry R0:III R.C. Callon MPSC G. Charnoff, Esq.

J.M. Hennigan W. Lavallee EPRI PNSRC J.F. Stietzel E.L. Townley Dir., IE (40 copies) n i,-

n11PC (4 copies)

'9109280321 810818 AUG ? 01981 JDr.ADOCK 050003f{

_