ML20031A869
| ML20031A869 | |
| Person / Time | |
|---|---|
| Site: | Cook |
| Issue date: | 08/17/1981 |
| From: | Shaller D INDIANA MICHIGAN POWER CO. |
| To: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| References | |
| NUDOCS 8109280315 | |
| Download: ML20031A869 (1) | |
Text
.
6 gyUM Ac G**",,, ).
.sh, IN0 LANA & MICHIGAN ELECTRIC _ C0A9PANY y
- e. h T [',%
$\\
DONALD C. COOK NUCLEAR PLANT
,C<
P.O. Box 458, Bridgman, Michigan 49106
!C y
4 e ?
n (616) 465-5901 6,,S V )-
O C,'1 g.,a i-August 17, 1981 N
To, " g g
A
- i,
Mr. J.G. Keppler. Regional Director Office of Inspection and Enforcement United States Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, IL 60137 Operating License DPR-58 and DPR-74 Docket Nos. 50-315 and 50-316
Dear Mr. reppler:
This is to confinn my telephone report utilizing the red phone at 1800 hours0.0208 days <br />0.5 hours <br />0.00298 weeks <br />6.849e-4 months <br /> on August 14, 1981, and subsequent notification to your Region III Inspector, Mr. N. DuBry. The purpose of this call was to advise the Nuclear Regulatory Comaission that a seismic inadequacy existed in the structural anchorage for certain pieces of equipment comprising the Unit 1 and 2 Auxiliary Feedwater System.
In addition to my notification, Mr. R.W. Jurgensen, AEPSC, also notified Region III. and NRR.
A followup report will be submitted by August 2F,1981.
Sincerely, 4
D.V. Shaller
' Plant Manager M OI
/bab 5
cc:
J.E. Dolan
/
R.S. Hunter l/O R.W. Jurgensen R.F. Kroeger K.J. Vehstedt E. Swanson/N. DuBry R0:III R.C. Callen MPSC
^
G. Charroff, Esq.
J.M. Hennigan W. Lavallee EPRI l
PNSRC J.F. Stietzel E.L. Townley AUG 19 1981 l
Dir., IE (40. opies) o Dir., MIPC (4 copies) g9280315sloeg7 ADOCK 05000315
.g
~..,
P[bfD
_ _ _ _ _ _ _ _