ML20031A802
| ML20031A802 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 09/11/1981 |
| From: | Crutchfield D Office of Nuclear Reactor Regulation |
| To: | Counsil W NORTHEAST NUCLEAR ENERGY CO. |
| References | |
| LSO5-81-09-028, LSO5-81-9-28, NUDOCS 8109250449 | |
| Download: ML20031A802 (2) | |
Text
c-l f7 W
CD G
DISTRIBUTI0ft September 11, 1981 Docket fiRC PDR Local PDR ORB Reading Docket ilo. 50-245 fiSIC L505-81-09-028 DCrutchfielu HSmith JShea E (3)
ACRS (10)
F[
s Mr. W. G. Counsil, Vice Pre ident SEPB L
Pluclear Engineering and Operations f(
W L
=
g' S@*
MN~
Northeast Huclear Energy Company Post iffice Box 270
~.
Hartford, Connecticut 06101
Dear ftr. Counsfl:
b y
RE: IIILLSTOME UtilT fia.1
'A We have reviewed your July 21, 1981 request for !!RC concurrence in delaying the use of the ODYll transient code on Millstone Unit No. I until the refeling analyses for the first reloads following January 1982.
The Nhc staff has concluded that tM requested delay can be permitted for those plants that can be demonstrated in have scran times bounded by the ODYll Option B scran time distribution.
Therefore, !!ortheast Nuclear Energy Cocpany nay defer submittal of an ODYtl analyses for flillstone Unit I until the first reload following January 1,1982 if scran times are Lounded by CDYM Option B.
Pier.se confirm that Option 0 applies to 11111 stone Unit 40. I within 30 days from receipt of this letter.
Sincerely, Original signed by Dennis fl. Crutchfield, Chief Operating Reactors Branch #5 Division of Licensing cc: See next page 9109250449 010911 PDR ADOCK 05000245 P
P DS' ornce> DL;,0RB p DL:,
so-- > as. yea:cc.
.at 1.d
.1LU. 3(. L
..f).
om>
wnc rosu.m 0a-803 uncu oua OFF1ClAL RECORD COPY use m.ir - m mo
Mr. W. G. Counsil September 11, 1981 CC William H. Cuddy, Esquire Connecticut Energy Agency Day,' Berry & Howard ATTN: Assistant Director Counselors at Law Research and Policy One Constitution Plaza Development Hartford, Connecticut 06103 Department of Planning and Energy Policy Natural Resources Defense Council 20 Grand Street 91715th Street, N. W.
Hartford, Connecticut 06106 Washington, D. C.
20005 Northeast Nuclear Energy Company
. ATTN: Superintendent Millstone Plant P. O. Box 128 Waterford, Connecticut 06385 Mr. Richard T. Laudenat Manager, Generation Facilities Licensing N-Northeast Utilities Service Company.
P. O. Box 270 Hartford, Connecticut 06101 Resident Inspector c/o U. S. NRC P. O. Box Drawer KK Niantic, Connecticut 06357 Waterford Public Library Rope Ferry Rcad, Route 156 Waterford, Connecticut 06385 First Selectman of the Town of Waterford Hall of Records 200 Boston Post Road Waterford, Connecticut 06385 John F. Opeka Systems Superintendent Northeast Utilities Service Company P. O. Box 270 Hartford, Connecticut 06101 U. S. Environmental Protection Agency Region I Office ATTN: EIS CCORDINATOR JFK Federal Building Boston, Massachusetts 02203
-