.DISTRIBUTI0ft:
Docket File bcc:
LB#1 Rdg.
TERA SEP 1 B8I DEisenhut PDR JYoungblood LPDR Docket flo.: STN 50-482 GEdison flSIC
' MRushbrook TIC SHanauer ACRS (16)
RVollmer Mr. Glenn L. Koester
~
Vice President - Nuclear
~ 7turley Kansas Gas and Electric Company' '" '
~ RMattson
?01 North Market Street
' ' " RHa'rtfield,' MPA Wichita, Kansas 67201
..'....~
- ' 'OEt.D OIE'(3)
.~'
RJackson
Dear Mr. Koester:
...,..HLefevre
Subject:
Request for Additional. Informati,on, for.the. Review of the Wolf Creek Plant, Unit 1 Regarding Geosciences, As a result of our continuing review of the. Wolf Creek Plant,. Unit 1 FSAR, we find that we need additional information to complete our evaluation. Tha
~
~
specific information required is in the, area.of_ geosciences and is presented in the Enclosure.
l To maintain our licensing review sched.ule for the Wolf Creek Plant FSAR, we will need responses to the enclosed _ request by. September _ _21,19.81'., 'If. you
~
~
cannot meet this date, please in. form us within seven days after, receipt of this letter of the date you plan to. submit your responses so that we may review our schedule for any necessary.cha,nges.
Please contact Dr. G. E. Edison,_ Wolf,,C,r,e_e_k Licens,ing Project Manager 1f you desire any discussion or clar'if,1 cation of the enclosed reques.t.
Sincerely, Originel signed b7f B. J. Youei N B. J. Youngblood, Chief Licensing Branch No. 1 Division of Licensing
Enclosure:
^
As stated
' ~~
[Db
~ ~ ~ ' "
cc: See next page
,, -,,, a se, c$
fd
,I
~
8109160022 810901 fp@-
PDRADOCK05000g s
A
/ ws k \\\\
, d? ' IW
,..c
/L DL:LB#1M,R DL Omcq
..g.J Y. b. u...l. o.o.d.
au:um) G.Ed.. i.s o..n../..l.g..B "O
ZRC FORM 318 t10/80t NRCM O240 OFFICIAL RECORD COPY
' "" **$29 82'
Mr. Glenn L. Ko;st:r Vice President - lNelear Kansas Gas and Electric Company
-201 North Market Street P. O. Box 208 Wic.ht ta. Kansas 67201 cc: Mr. Nicholas A. Petrick Ms. Wanda Christy Executive Director, SNUPPS 515 N. 1st Street 5 Choke Cherry Road Burlington, Kansas 66839 Pockville, Maryland 20750 Eric A. Eisen, Esq.
Mr. Jay Silberg, Esquire Birch, Horton, Bittner & Monroe Shaw, Pittman, Potts & Trowbridge 1140 Connecticut Avenue, N. W.
1800 M Street, N..W.
Washington, D. C.
20036 Washington, D. C.
20036 Kansans for Sensible ~ Energy Mr. Donald T. McPhee P. O. Box 3192 Vice President - Production Wichita, Kansas 67201 Kansas City Power and Light Company 1330 Baltimore Avenue P. O. Box 679 Kansas City, Missouri 64141 Ms. Mary Ellen Salva Route 1, Box 56 Burlington, Kansas 66839 Ps. Treva Hearne, Assistant General Counsel PJblic Service Commission P. O. Box 360 Jefferson City, Missouri 65102 Mr. Tom Vandel Resident Inspector / Wolf Creek NPS c/o U.S.N.R.C.
P. O. Box 1407 Emporia, Kansas 66801 Mr. Michael C. Kenner Wolf Creek Project Director State Corporation Commission State of Kansas Fourth Floor, State Office Bldg.
Topeka, Kansas 66612 I
L
(
ErtCLO5URE Request For Additional Geologic Infcrmation o
Wolf Creek fluclear Generating Station, Unit No.1 231.0WC
,Geosciences Branch Cl.1WC Prepare a new figure (or revise an existing figure) locating the non-capable shear zones, shear planes, and faults mapped at the
~
site and described in the FSAR (page 2.5-102). Also prepare a table listing the abcve deformations, tFa site locacion of the deformation, and the Dr.aes and Moore report where the deformation mapping and descrip'. ion appears.
231.2WC A numb (r of lineaments, other than those numerically identified, are shewn in Coffey County (the site county) on FSAR Figures 2.5-14a dnd 2.5-14b.
Identify these unnumbered lineaments and present your i
interpretatici, of the origin /cause of each.
Include in your discussion the relationship, if any, between each of the Coffey County lineaments (including those presently shot.a on FSAR Figures 2.5-14a and 2.5-14b) and the folds and faults identified on FSAR Figures 2.5-15 and 2.5-16.
231.3WC Expand the LAtlDSAT. lineament. presentation (Revision 4, July 1981) to include a discussion of the relationship between the lineaments discussed, folds and faults (FSAR Figures 2.5-15 and 2.5-16), Precambriar surface folds l
trid "aults (F5AR Figure 2.5-14b), and earthquake epicenters.
23i.4WC S ase provide a copy of the Dames and Moore report (s) discussing and portraying the Saddle Dam IV faulting.
These reports are referenced in the D&M Second Interim Report of July,1979 (Dames and Moore, 1977;1978a).
Also provide a copy of the report (s) which includes the geologic map
~(and accompanying description) of the Drum Puilding excavation.