ML20030D682

From kanterella
Jump to navigation Jump to search
Notification of 810901-02 Meetings W/Util,Sargent & Lundy & GE in Chicago,Il to Discuss Balance of Plant & NSSS Instrumentation & Control Interfaces to Assure Conformance W/Applicable Criteria.Agenda Encl
ML20030D682
Person / Time
Site: Clinton  Constellation icon.png
Issue date: 09/01/1981
From: Williams J
Office of Nuclear Reactor Regulation
To: John Miller
Office of Nuclear Reactor Regulation
References
NUDOCS 8109140355
Download: ML20030D682 (3)


Text

4

.~..,

, F.,

1-Q

~o i ki' 4

0/

DL SEP 1 1981 Docket Nos, 50-461/462 MEMORANDl4 FOR: James R. Miller, Chief Standardization and Special Projects Branch, DL FROM:

Julian H. Wfiliams, Project Manager Standardization and Special Projects Branch. DL

SUBJECT:

NOTICE OF ffEETING WITH ILLINOIS POWER COMPANY, SARGENT AND LUNDY, AND GENERAL ELECTRIC COMPANY REGARDING B0P AND NSSS INSTRUMENTATION AND CONTROLS INTERFACES DATE:

September 1 & 2, 1981

/p fn$

TIME:

8:30 Att i

/ k~ N '. N.-

g LOCATION:

Sargent & Lundy C

SEPOl M " Z.

55 E. Monroe Street Chicago, Illinois 60603 H 5* %

12 Room 23E58

%}h PURPOSE:

To review the balance of p.nt(B0P)systemsandinte faces of these systems with plant safety systems to assure conformance with applicable criteria.

PARTICIPANTS:

NRC S&L R. Kendall J. Dingler J. Whitenbour ANL/ NAP D. Soni S. Halverson R. Giben IPC GE L. Davis E Scherer J. O'Brien G. Darmohray D. Foreman ORIGINAL SIGNED BY:

Julian H. Williams, Project Manager Standardization and Special Projects Branch Division of Licensing

Enclosure:

.,, /'

Agenda f4 [ /

li/ p I 4.,5.S. f. BI..D,D....

on c4 SSPB:DL SSPB:DL-J 8109140355 810901 JHWilli ' ~~~s:ka ) LTremper.

/JRMiller PDR ADOCK 05000461

, i, /g' ' ' " ' "/ 81

~

8 8/,.

8//)/ /81 A

PDR

/81

, I, we r osu aie,ic noi nuc u ouc OFFICI AL RECORD COPY

" = ~"-33"2a

m 2.2 E

/.*,

Draft Agenda - Chapter 7 BOP Presentations i

Subject Area 7.2 Reactor Protection System Discussions of Non-NSSS interfaces with RPS in the areas of power. supply, turbine inputs and plant interface with NSSS local panels.

7. 3 Engineered Safety Feature Systems Discussions on the following BOP systems:

Main Control Room HVAC-Shutdown Service Water Standby Power HVAC for ESF areas 7.4 Systems' Required for Saf.c Shutdown Discussion of BOP interfaces with.the NSSS systems at local panels and at the power supply.

7.5 Safety Related Display Instrumentation Discussion related to the design of the following:

Containment Pressure Monitoring Suppression Pool Temp. Monitoring Suppression Pool Water Level P

7.6 All Other Systems. Required for Safety Discussions related to the BOP design of the following systems:

Process and Area Radiation Monitoring (Safe'ty and Non-Safety)

' Leak Detection Fuel Pool Cooling and Cleanup 7.7 Control Systems Not Required for Safety Discussions of the BOP design of the following systems:

Feedwater Control Reactor, Water Cleanup Topical Discussions General Discussions of the following subjects would be on a topic basis rather than a system basis:

R.G.l.47 Bypassed and Inoperable Indications R.G.1.75 Physical Independence R.G.l.97 Post Accident Monitoring mm m

--m

J i

MEETING NOTICE DISTRIBUTION Docket File I&E Region I NRC PDR I&E Region II Local PDR I&E Region III SSPB Rdg.

I&E Region IV TERA I&E Region V NSIC NRC Participants TIC Pro.iect Manager E. Case J. R. Miller D. Eisenhut/R. Purple L. Tremper N. Hughes T. Novat S. Varga j

T. Ippolito R. A. Clark J. Stolz R. Tedesco B. Youngblood 1

A. Schwencer F. Miraglia E. 1densam G. Lainas D. - Crutchfield B. Russell J. 01shinski 4

R. Vollmer i

R. Mattson l

S. Hanauer T. Murley

.J. Knight W. Johnston D. Muller P. Check W. Kreger L. Rubenstein F. Schroeder M. Ernst ACRS (16)

I&E (3)

OSD (7)

OELD.

i J. LeDoux V. Moore l

B. Grimes e

,