ML20030D576
| ML20030D576 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon |
| Issue date: | 08/11/1981 |
| From: | Kulick S, Woodward E AFFILIATION NOT ASSIGNED |
| To: | NRC |
| References | |
| NUDOCS 8109010545 | |
| Download: ML20030D576 (2) | |
Text
-
CC0.{27 NU?.i2"R SPENCER L. KULICK. M.D.
h,[,ki,$2,,3, 5105 CASALLEROS
&l f a s AN LUIS CSISPO. CA. 93401 Y.\\ '
TELEPHONE (805) 544 6430 7sMjfdNLD:
c.g 31198F "
b tR Y.
- W*
O I
6h sugeoAT Tri e cice cipcarisq hiewse To
%e of Au P. c. f a
b i +W CM w e 'rio t h
por LeT A
ttwregim e_
r L c m t_
IMW o R (Tk,
Tn e e erc-Mio V o c A t_
Affect Yooo becreea n oog.
gc tw rs M$oeirx 0F inn Auo c < Ares e
(
- c q dogs su g go/tT Yke o e c,t T ( o,a 0-f
% blo CA,q on.
$f ucere(y,
o ~e gc3}
C c
AUG 111981 > ][
M'O -
0 Office cf the Sec etary Docieting & Se.vice g
D DO O 00 75 f'
H PDR
p DOCKET NUMBER P, ROD. & UTIL FAC..,..
,, J.
i e
2592 3riarwood Crive San Jose, CA 95125 l
August 6, 1981 United States of America Nuclear Regulatory Cocmission Washington, D.C.
20555
Dear Sir:
I have received a copy of the PARTIAL IaITIAL DECISION, dated July 17, 1981, In the Matter of:
PACIFIC GAS Asi; ELICTRIC CCMPANY (Diablo Canyon Nuclear Plant, Units 1 and 2).
I agree !aith the Order that the Director of Nuclear Reactor Regulation is authorized to issue a license to authorize fuel load and low power testins up to 5% of rated power.
The long delay in this project has been unwarranted and excessive.
It is an essential addition to the power production of the Pacific Gas and Electric l
Company and its full capacity should be utilized as soon as possible.
Sincerely,
{ gjlu.C dj % k s l Woodw 3 83g' /
Esther C.
%[
Copies to:
r-g
.g Tne president of the U.S.
G d
The Governor of California
')
D
$/
?
)alphjf g ms wssa 2 n
nf w gtu.s,can i, y.
s e
.c a c
CocM!j1 Q-Q g,j g
'c' Nm Dso3 s
/O