f
hlc>J
-
AUG 0 61981
\\
Florida Power and Light Company
I
d
" I=l
I.
ATTN:
Dr. R. E. Uhrig, Vice President
U
u-
Ed fiUG
9
Advanced Systems and Technology
Q g
31]ggjg,7-
P. O. Box 529100
-
Miami, FL 33152
ao. men
y
~q2,, -
g
Gent 1emen:
Subject: Report No. 50-389/81-12
This refers to the routine safety inspection conducted by Mr. N. Economos of this
office on July 6-9, 1981, of activities authorized by NRC Construction Permit No.
CPPR-144 for the St. Lucie facility and to the discussion of our findings held
with Mr. B. J. Escue, Plant Manager, at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspectors.
Within the scope of this inspection, no violations or deviations were disclosed.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this
letter and the enclosed report will be placed in the NRC's Public Document Room.
If the report contains any information that you believe to be exempt from disclo-
sure under 10 CFR 9.5(a)(4), it is necessary that you: (a) notify this office by
telephone within ten days from the date of this letter of your intention to file
a request for withholding; and (b) submit within twenty-five days from the date
of this letter a written application to this office to withhold such information.
If your receipt of this letter has been delayed such that less than seven days
are available for your review, please notify this office promptly so that a new
due date may be established. Consistent with section 2.790(b)(1), such applica-
tion must be accompanied by an affidavit executed by the owner of the information
which icentifies the document or part thereof sought to be withheld, and a full
statement of the reasons on the basis of which it is claimed that the information
should be withheld from public disclosure.
This section further requires the
statement to address with specificity the considerations listed in 10 CFR 2.790-
(b)(4). The information sought to be withheld shall be incorporated as far as
possible into a separate part of the affidavit. If we do not hear from you in
this regard within the specified periods noted above, the report will be placed
i
in the Public Document Room.
'O
9 \\p
G
8109010378 810806
gDRADOCK 05000389
. _ _ - . _
- - .
-..
~ . . - -
-
-
_-
-
.-
- . -
f
a
Florida Power and Light Company
2
AUG 0 61981
Should you have any questions concernir.g this letter, we will be glad to discuss
them with you.
Sincerely,
M
P. J. Kellogg, Acting Chief
Reactor Projects Branch 2
Division of Resident and
Reactor Project Inspection
Enclosure:
Inspection Report No. 50-389/81-12
cc w/ encl:
B. J. Escue, Plant Manager
N. Weems, Assistant QA
Construction Manager
bcc w/ encl:
NRC Resident Inspector
Central Files
Local Public Document Room
Washington Public Document Room
Nuclear Safety Information Center
Technical Information Center
Document Management Branch
State of Florida
,R
RII,Ai
RII
RII
RII
RII
c
W
e4
cyf
"
ftconom #os:ht
AHerdt
CEMurphy
AFGibson
MSh:,, ock
PJ'e logg
7/)[/81
7/$81
{/g /81
7/ C/81
81
81
9
w
A