Text
<
.
.
AUG 131981
m
4
%
<
e
h
1
[
f
-
Docket No. 50-295
[2
Ni v .
v
U
gj 7,gg 3 g )ggg , g
Docket No. 50-304
Commonwealth Edison Company
Q WAW Y
ATTN:
Mr. Cordell Reed
N
Vice President
.M
Post Office Box 767
<tr
l,
Chicago, IL 60690
~
This refers to the routine safety inspection conducted by Messrs.
J. R. Waters and J. E. Kohler of this office on May 30-July 31, 1981, of
activities at Zion Nuclear Power Station, Units I and 2, authorized by
NRC Operating Licenses No. DPR-39 and No. DPR-48 and to the discussion
of our findings with Mr. I'.
Graesser at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
No items of noncompliance with NRC requirements were identified during the
course of this inspection.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter and the enclosed inspection report will be placed in the NRC's
Public Document Room.
If this report contains any information that you or
your contractors believe to be exempt from disclosure under 10 CFR 9.5(a)(4),
it is necessary that you (a) notify this office by telephone within seven (7)
j
days from the date of this letter of your intention to file a request for
l
withholding; and (b) submit within twenty-five (25) days from the date of
this letter a written application to this office to withhold such infor-
i
mation. Section 2.790(b)(1) requires that any such application must be
accompanied by an affidavit executed by the owner of the information which
identifies the document or part sought to be withheld, and which contains
l
a full statement of the reasons which are the bases for the claim that the
!
information should be withheld from public disclosure. This section further
!
t
l
l
!
\\
.
\\
Sti
0100310561 ho
PDR ADOCK
5
0
POR
_
_
-
_
_
_
-
,.
___
-
. .
.
_ _ _ _ _ _ _ . -
,
.
.
Commonwealth Edison Company
2-
-
requires the statement to address with specificity the considerations listed
in 10 CFR 2.790(b)(4). The information sought to be withheld shall be
incorporated as far as possible into a separate part of the affidavit.
If
we do not hear from you in this regard within the specified periods noted
above, a copy of this letter and the enclosed inspectica report will be
placed in the Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
,,
'
./q-p n+A
-
R. L. Spessard, Director
Division of Resident and
Project Inspection
i
Enclosure: IE Inspection
Reports No. 50-295/81-14
,
and No. 50-304/81-10
,
cc w/ enc 1:
Louis 0. De1 George, Director
of Nuclear Licensing
K. Graesser, Station
,
Superintendent
DMB/Pocument Control Desk (RIDS)
Retident Inspector, RIII
Mary Jo Murray, Office of
Assistant Attorney General
!
l
i
i
e
!
1
bh
RIIIf
RI
III
Hayes /np
Knop
Sp
ard
8/12/81
.
,
-
c-
.,.---....-..--...n
. - , . ,
,-,.,,,~,-.,.,.<,-,,-,,,,,..,.,-,,,,w.m-
~n.
- ..
,,.,--..n.-...--,,,=
-n.,
n.
-