y e
ps***'*vq 4
jo UNITED STATES g
y,e g
NUCLEAR REGULATORY COMMISSION E
WAsHINcToN, D. C. 20s55
- Ty E
o
,d August 17, 1981 Mr. Herman Dieckamp, President General Public Utilities Corporation 100 Interpace Parkway Parsippany, New Jersey 07054
Dear Mr. Dieckamp:
This letter is in response to your letter of August 12, 1981 to Mr. Dircks regarding operator examinations for the re-start of TMI-1.
I have concluded that retesting of the remaining TMI reactor operators and senior reactor operator candidates with complete written examinations is required on the basis that cheating was detected in the april examina-tions and there were rumors that other cheating may have taken place.
Although our investigation, including a comparison of all examination papers, 'ias not disclosec' any substantiated evid=,ce of other cheating, the existence of at least the instances discovered raises questions about the opportunity and possibility of other cheating in these examina-tions.
Furthermore, others who know or may become aware of the rumors of other cheating, may feel the cheating was being condoned, unless a re-examination is required for the entire group.
I regret that I have to take this action but am convinced that we have' l
no practical alternative if we are to be fully confident that all persons who pass the NRC examinations are qualified to operate the plant.
This is particularly important at TMI because there was an implication that inadequate training and qualification played a significant role in the accident.
It is imperative that the NRC, as well as the public, have complete confidence in the senior reactor operators. and reactor operators at TMI.
We pian to administer this retesting a few days in advance of the plant l
walk-through and oral examinations currently scheduled for September.
Sincerely, l
N Harold R. Denton, Director e
Offica of Nuclear Reactor Regulation 8108280452 6-10817 I
PDR ADOCK 05000289 l
.P PDR l
-