ML20030C816

From kanterella
Jump to navigation Jump to search
Notifies of NRC Site Visit During Aug & Sept 1981 to Review Aspects of Emergency Assessment Program Including Calculating Offsite Doses,Operating Characteristics of Monitoring Equipment & Data Dissemination
ML20030C816
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 08/19/1981
From: Brown G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Lee O
PUBLIC SERVICE CO. OF COLORADO
References
NUDOCS 8108280196
Download: ML20030C816 (2)


Text

-

C; k Docket: 50-267 m

fg Lk

[ ] / (; w) h s

/

Public Service Coyany of Colorado ATTN: Mr. O. R. Lee, Vice President a

AUG 27 N # E (8"4 Electric Production k,,s, w" "* 7,QC Post Office Box 840 Denver, Colorado 20201 1,s.

\\

Gentienen:

g s>

w

\\

Region IV is in the process of revising our Emergency Response Plan. Part

)

of this revision includes a review of the various methods used by licensees and this office to evaluate accident conditions. One of the areas we are reviewing involves independant evaluations of accident conditions where different values could be reported based on the particular method used in the evaluation.

During August and September 1981, Mr. J. B. Baird of this office will be visiting your facility to review certain aspects of your emergency assess-ment program. Mr. Baird will review such items as procedures for calculat-ing off-site doses, operating characteristics of monitoring equipment, and the immediate dissemination of data used in the assessment of accident conditions. Mr. Br.ied will contact the plant operations staff prior to his visit to identify specific members of the staff he will need to meet with.

Your cooperation is appreciated.

Sincerely.

  • ' Original Signed tm G. D. BROWN" Glen D. Brown, Chief Technical Inspection Branch cc:

D. W. Warembourg, Nuclear Production Manager Fort St. Vrain Nuclear Station Post Office Box 368 Platteville, Colorado 80651 J. Gahm, Quality Assurance bcc:

Il IE HQ PDR IE/RPRIB GMadsen LPDR CHackney

.h. 5.~.h.I!...

TIB DD-RIV BMurray/bb

GBrown,

,JT, Collins, sue m t omb M1N

- eggeggerababi,/81 8/ /81

+-

PDR OFFICIAL R[tORD COPY N

g

Docket: 50-267 Public Service Company of Colorado ATTH: Mr. O. R. Lee, Vice President Electric Production Post Office Box 840 Denver, Colorado 80201 Gentlemen:

Region IV is in the process of revising our Emergency Response Plan. Part of this revision includes a review of the various methods used by licensees and this office to evaluate accident conditions. One of the areas we are reviewing involves independent evaluations of accident conditions where different values could be reported based on the particular method used in the evaluation.

During August and September 1981, Mr. J. B. Baird of this office will be visiting your facility to review certain aspects of your emergency assess-ment program. Mr. Baird will review such items as procedures for calculat-ing off-site doses, operating characteristics of monitoring equipment, and the imediate dissemination of data used in the assessment of accident conditions. Mr. Baird will contact the plant operations staff prior to his visit to identify specific members of the staff he will need to meet with.

Your cooperation is appreciated.

Sincerely, Glen D. Brown, Chief Technical Inspection Branch cc:

D. W. Warembourg, Nuclear Production bec dis rib. by RIV Manager Colorado te Dep Health Fort St. Vrain Nuclear Station

- sing, Post Office Box 368 NR Platteville, Colorado 80651 IE BC D/DHFS J. Gahm, Quality Assurance PM i A LB AEOD RAD A BR ELD RESEARCH IE ILE DR IE/RPRIB NSIC ecq SS RIV, l

iEC PDR rti jed..

Reg.

by

,,,I Md,' ',

1 lins suamd turray/bb GDB,,,,

......h.,./81 8/

8/19/81 8/ /81 om

...1-EM Sect 1.on~-

unc ronu ais oo-soi nacu ono OFFICIAL RECORD COPY

...