50.55(e) Report y*
Docket Nos. 50-508/509 G'
Washington Public Power Supply System O'eo
, v,
\\#4g #y t
Box 1223 Elma, Washington 98541 (206)482-4428
{bo c
fo
/ 12 August 14, 1981
\\,
,Q G03-Gi-2370 vw
/g g3s\\g; 4
Nuclear Regulatory Commission, Region V y
Suite 202, Walnut Creek Plaza is m
1990 North California Boulevard M
..: ES Walnut Creek, California 94596 gm
~
N EE Attention.
Mr. B. H. Faulkenberry 9
Chief, Reactor Construction Projects Branch l.s m
Gentlemen:
Y
Subject:
PROJECT N05. 3 AND 5 INTERIM REPORT OF P0TENTIAL 50.55(e) CONDITION
References:
1)
Letter, G03-81-503, D. E. Dobson to R. H. Faulkenberry, dated February 19, 1981.
- 2) Letter, G03-81-1027, R. S. Leddick to R. H. Faulkenberry, dated May 7, 1981.
Attached please find a copy of the Engineer's Interim Report of a potential 10CFR50.55(e) concerning structural steel at the WNP-3 and 5 Site.
The Engineer states in this interim report that the final report to the Supply System is anticipated October 31, 1981. We will provide the fiaal report to the NRC by November 15, 1981.
Should you have any questions or desire further information please con-tact me directly.
Very truly yours, R. S. Leddick Program Director, WNP-3/5 cc:
J. Adams - PP&L D. Smithpeter - BPA
%N Ebasco - New York WNP-3/5 Files - Richland 3
Attachment
/
8108260139 810814 PDR ADOCK 05000509 S
$1-57
i i
I INTERIM REPORT l
Structural Steel Connections - Units 3 and 5 DESCRIPTION OF PROBLEM J
As required by Corrective Action Request, Morrison-Knudsen performed. a 100% visual inspection and torque testing program on all accessible bolted connections in Units 3 & 5.
This inspection revealed both do-cumentation and potential hardware nonconformances. As a result. NCRs were initiated.
Notification to the NRC was made on letters G03-81-503, dated February 19, 1981 and G03-81-1027, dated May 7, 1981.
APPROACH TO THE RESOLUTION OF PROBLEf1 i
M-K was requested by Ebasco to perform a statistical analysis on the results obtained from the torque tests. The requested report was issued to Ebasco until July 16, 1981. A review of this report by Ebasco identi-ficd several minor inconsistencies and errors. This report will be used by Ebasco's Civil Engineering Department to determine the potential im-pact on the structural capacity of the connections.
STATUS OF PROPOSED RESOLUTION j
Ebasco is in the process of reviewing the statistical analysis report and analyzing the potential impact on the structural capacity of the connections.
REASONS FOR DELAY IN ISSUANCE OF THE FINAL REPORT
)
i 1)
M-K's statistical analysis report was issued to Ebasco until July 16, 1981.
- 2) The analysis by Ebasco is a complicated and time consumiro process.
PROJECTED COMPLETI0il DATE OF THE FINAL REPORT The final report will be completed by October 31, 1981.