ML20030C463
| ML20030C463 | |
| Person / Time | |
|---|---|
| Site: | San Onofre |
| Issue date: | 06/22/1981 |
| From: | Nunn D SOUTHERN CALIFORNIA EDISON CO. |
| To: | Engelken R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| References | |
| 10CFR-050.55E, 10CFR-50.55E, NUDOCS 8108260132 | |
| Download: ML20030C463 (1) | |
Text
50.55(e) Report
~
(o)
(V)
Docket tios. 50-361/362 Southern California Edison Company SCE
,,,1 ) [],.
P O BOX 800 g' /k 2 2 44 W ALN UT GROVE AVENUE T
RO S E M E AD. C ALIFO RNI A 917 70
,,5 O. E. NUN N
', Jfj. f Q
memo E g
,-w, nn,,,....
... o.. o u. o..,, u. a
,4 7 / 'g f/
June 22, 2981
~
- ,.-- u
- -fya,jin ey a
Mr. R. H. Engelken, Director
,M ll L u ?. y Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Region V Suite 202, Walnut Creek Plaza 1990 North California Boulevard Walnut Creek, California 94506
Dear Mr. Engelken:
Subject:
Docket Nos. 50-361 and 50-362 San Onofre Nuclear Generating Station, Units 2 and 3 This letter confirms verbal notification on June 22, 1981 of two conditions discovered in construction which are considered potentially reportable in accordance with 10CFR50.-
55 (e).
The conditions involve:
(a) The use of non-self lock-ing gear sets in valve operators manufactured by Limitorque Corporation which results in a hammering action on seating the valve; (b) Loss of a diesel generator set output due to the unit tripping out on a high crankcase pressure signal during preoperational testing.
We are performing an evaluation of these conditions and will submit appropriate reports in accordance with 10CFR50.-
55(e)(3) if the conditions are determined to be reportable.
If you have any questions or require additional information, please let me know.