ML20030B667

From kanterella
Jump to navigation Jump to search
Responds to NRC Re Violations Noted in IE Insp Rept 50-219/81-06.Corrective Actions:Personnel Involved in Procurement of Barton Switches Instructed in Proper Procedures
ML20030B667
Person / Time
Site: Oyster Creek
Issue date: 07/08/1981
From: Phyllis Clark
GENERAL PUBLIC UTILITIES CORP.
To: Keimig P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20030B666 List:
References
NUDOCS 8108180419
Download: ML20030B667 (2)


Text

.

'p.

GPU Nuclear J

UC Gar

'oo interoace Park *av Parsippany. New Jersey 07054 201 263-6500 TELEX 136-482 Writer's Direct Dial Number:

July 8, 1981 Mr. R. R. Keimig, Chief Projects Branch No. 2 Division of Resident and Project Inspections U.S. Nuclear F.gulatory Commission Region I King of Prussia, PA 19406

Dear Mr. Keimig:

Subject:

Oyster Creek Nuclear Generating Station Docket No. 50-219 IE Inspection 50-219/81-06 Notice of Violation In accordance with 10 CFR 2.201, the following is in response to Appendix A " Notice of Violation" transmitted to Jersey Central Power &

Light Company with your letter of June 9,1981. As stated in the Notice of Violation, Purchase Requisition 61619 was issued for the procurement

>f ITT Barton Model 288A snap action switches without Operational Quality asurance concur. c.ce as required by the Operational Quality Assurance Program and company procedures 4016, rev. 1 and 2001, rev. 3.

This event occurred due to problems encountered with the vendor in supplying procurement documentation.

Subsequently, QA concurrence was obtained during the installation phase. The responsible personnel involved in the procurement of the Barton switches have been instructed in tt, proper procedure to follow and the importance of obtaining the Operational Qu lity Assurance concurrence.

It is believed that this action will preclude any recurrence.

Full compliance was achieved on June 24, 1981.

If you should have any questions, please contact Mr. Michael Laggart at (609) 693-6932.

Very truly yours, 4

g, Philip R.4 Clark Executive #Vice President n

Signed and sworn to before me this p.r f day of (f-4 1981.

/

r

,/

3

, M

,c.

/>

n,c le w 8108180419 810811 PDR ADOCK 05000219 Notary Public FHYLLl3 A. KA;; -

G PDR NOTARY pucuc cr raw na GPU Nuclear is a part of the General Pubhc Utihties System y, c.,,;,,;,, gy;,,,,,,, g, s gy

,,,q

1 e

~ PRC:GWB:lse cc: Director Office of Inspection and Enfercement U.S. Nuclear Regulatory Commission Washington, D.C.

20555 Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Region I 631 Park Avenue King of Prussia, PA 19406 Resident Inspector Oyster Creek Nuclear Generating Station Forked River, NJ 08731

- - -- -