ENCLOSURE
.y SEQUOYAH NUCLEAR PLANT PROPOSED TECHNICAL SPECIFICATION REVISION
,]
y TABLE 3.3-13 (Continued)
TABLE NOTATION At all times.
t During waste gas disposal system operation.
- During shield building exhaust system operation.
ACTION 40 -
With the number of channels OPERABLE less than required by the Minimum Channels OPERABLE requirement, the contents of the tank (s) may be released to the environment for up to 14 days j
provided that prior to initiating the release:
a.
At least two independent samples of the tank's contents are analyzed, and i
b.
At least two technically qualified members of the Facility Staff independently verify the release rate calculations and discharge valve lineup; Otherwise, suspend release of radioactive effluents via this pathway.
ACTION 41 -
With the number of channels OPERABLE less than required by the MinimumChannelsOPERABLErequirement,effigntreleasesvia this pathway may continue for up to 30 days-provided the flow rate is estimated at least once per 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.
ACTION 42 -
With the number of channels OPERABLE less than required by the Minimum Channels OPERABLE requirement, effluent releases via this pathway may continue for up to 30 days provided grab j
samples are taken at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> and these samples are analyzed for noble gas gross activity within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
ACTION 43 -
With the number of channels OPERABLE less than required by the Minimum Channols OPERABLE requirement, operation of this waste gas disposal system may continue for up to 7 days provided grab samples are collected at least once per 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> and analyzed within the following 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />. With the hydrogen and oxygen monitors inoperable, be in at least HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
l ACTION 44 -
With the number of channels OPERA 8LE less than required by the Minimum Channels OPERABLE requirement, effluent releases via the affected pathway may continue for up to 30 days provided that within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> after the channel has been declared inoperable samples are continuously collected with auxiliary l
sampling equipment as required in Table 4.11-2.
D
- Until the repair or replacement of the applicable flow rate monitors, but in no case later than before startup following the first refueling outage, this 30-day time limit is waived for effluent releases via the shield building exhaust, auxiliary building, and service building.
SEQUOYAH - UNIT 1 3/4 3-77 8108180275 810814 PDR ADOCK 05000327 P
PDR i
- U i
TABLE 3.3-13 (Continued)
TABLE NOTATION i
At all times.
Ouring waste gas disposal system operation.
- During shield building exhaust system operation.
)
ACTION 40 -
With the number of channels DaERABLE less than required by the Minimum Channels OPERABLE requirement, the contents of the tank (s) may be released to the environment for up to 14 days 1
provided that prior to initiating the release:
a.
At least two independent samples of the tank's contents are analyzed, and l
b.
At least two technically qualified members of the hcility Staf f independently verify the release rate calculations and discharge valve lineup; Otherwise, suspend release of radioactive effluents via this pathway.
ACTION 41 -
With the number of channels OPERABLE less than required by the Minimum Channels OPERABLE requirement, ef fluent releases via this pathway may continue for up to 301 days provided the ficw rate is estimated at least once per 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.
ACTION 42 -
With the number of channels OPERABLE less than required by tne Minimum Channels OPERABLE requirement, effluent releases via this pathway may continue for to to 30 days provided grab samples are taken at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> and these samples are analyzed for noble gas gross activity within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
ACTION 43 -
With the number of channels OPERABLE less than required by the l
Minimum Channels OPERABLE requirement, operation of this waste l
gas disposal system may continue for up to 7 days provided grab i
samples are collected at least once per 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> and a.alyzed i
within the following 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.
With the hydrogen and oxygen j
monitors inoperable, be in at least HOT STANOBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
ACTION 44 -
With the number of channels OPERABLE less than required by the Minimum Cnannels OPERABLE requirement, effluent releases via i
the affected pathway may continue for up to 30 days provided that within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> after the channel has been declared inoperable samples are continuously collected with auxiliary sampling equipment as required in Table 4.11-2.
I Until the repair or replacement of the applicable flow rate monitors, but in no case later than before startup following the first refueling outage, g
this 30-day time limit is waived for effluent releases via the shield w
building exhaust, auxiliary building, ard service building.
SEQUOYAH - UNIT 2 3/4 3-79