ML20030B470

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-160/81-01 on 810407-09 & Notice of Violation
ML20030B470
Person / Time
Site: Neely Research Reactor
Issue date: 04/21/1981
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Weaver L
Neely Research Reactor, ATLANTA, GA
Shared Package
ML20030B467 List:
References
NUDOCS 8108180156
Download: ML20030B470 (2)


See also: IR 05000160/1981001

Text

OFFICIAL COPY

/

UNITED STATES

/

~

S'

NUCLEAR REGULATORY COMMISSION

o

$

nE

REGION 11

'#

g

101 MARIETTA ST.. N.W.. SUITE 3100

',,

ATLANTA. GEoRcl A 30303

'**"

APR 211981

1.~

..

Georgia Institute of Technology

ATTN:

L. E. Weaver, Director

School of Nuclear Engineering

225 North Avenue

Atlanta, GA 30332

Gentlemen:

'

Subject: Report No. 50-160/81-01

This refers to the routine safety inspection conducted by C. Julian of this

office on April 7-9, 1981, of activities authorized by NRC Operating License No.

R-97 for the Georgia Institute of Technology Research Reactor facility.

Our

preliminary findings were discussed with Dr. L. E. Weaver at the conclusion of

the inspectica.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consistedy of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspectors.

During the insp,ction, it was found that certain activities under your license

appear to violate NRC requirements.

These items and references to pertinent

requirements are listed in the Notice of Violation enclosed herewith as

Appendix A.

Elements to be included in your response are delineated in

Appendix A.

We have examined actions you have taken with regard to previously identified

enforcement matters and unresolved items. The status of these items is discussed

in the enclosed report,

In accordance with Section 2.790 of the NRC " Rules of Practice," Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC Public Document Rcom. If this report

contains any information that you believe to be proprietary, it-is necessary that

you make a written application within 20 days to this office te withhold such

information from public disclosure. Any such application must include the basis

for claiming that the information is proprietary and the proprietary information

should be contained in a separate part of the document.

If we do not hear from

you in this regard within the specified period, the report will be placed in the

Public Document Room.

l

!

!

!

.

~

8108180156 810807

l

PDR ADOCK 05000160

!

O

PDR

1

'

, _ _

.

. . - .

--

-

.

..

.

- .

. -

-.

.

.

4

APR 211981

,

Georgia Institute of Technology

2

,

.a

^

I

Should you have any questions concerning this letter, we will be glad to discuss

them <ith you.

.-

i

Sincerely,

i.

-

'

$*C .

[<

.

'

R.

ew s, Acting Director

1

Division of Resident and

'

Reactor Project Inspection

'

'

Enclosures:

1.

Appendix A, Notice of Violation

2.

Inspection Report No. 50-160/81-01

I

cc w/ encl:

.

A. P. Sheppard, Acting Vice

President for Research

.s

,

l

.

t

.

, - .--,-, -,,_......_,...-.,-. ,

,2.,.-._..._.-._.__-...,,_..._,

...

..

. ?

. ..-

. . . - .

. . . . . _ . - , _ .

. . . - - -