Informs That 760109 Outage Start Date Postponed to 761023 Due to Slippage in Const & Delivery Schedules
ML20030A531
Person / Time
Site: Big Rock Point File:Consumers Energy icon.png
Issue date: 01/06/1976
From: Sewell R
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
Office of Nuclear Reactor Regulation
References
NUDOCS 8101090952
Download: ML20030A531 (2)


Text

.

l.

P f -@Q POWct Consumers

(

g 4g

)

Company cen...i cmc..: ass w. u.crua.n Avenu...> ckson, uic+.a acaoi. 4,.. coo. sir 7ss onso N

c' January 6, 1976 a %m- ' ed s

.i,

pocem uwK

\\

)

g\\

s5"#

d44'd Director of Nuclear Reactor Regulation 6

U.s. u' 84 eN?$ u

~6 e

D 50

'*8

[

US Nuclear Regulatory Commission a

Washington, DC 20555 DOCKET 50-155, LICENSE DPR-6 BIG ROCK POINT PLANT By letter dated December 22, 1975, Consumers Power Company provided a report describing its efforts with respect to achieving compliance with the Interim Acceptance Criteria (IAC). The report stated that the scheduled outage start date for the installation of the RDS system was January 9,1976, even though consideration was being given to postponing the outage start date. This

{

1etter is written to inform you that the outage start date has been postponed until January 23, 1976.

The December 22, 1975 letter reported that the construction effort was behind schedule due to a lack of electrical materials and approved installation.

Attempts to expedite the materials and the implementation of a second ex-tended shift have not been completely successful in making up the lost time.

Thus, we have determined that it is necessary to postpone the outage start date for two weeks. This vill allow more effective utilization of the plant shutdown time.

Also, the delivery schedule of some components of the redesigned fuel dry sipping system has slipped and they will not be delivered to the plant until the week of January 12, 1976. As it is desirable to start fael sipping about four days after plant shutdown, tne two-week postponement of the schedule vill provide adequate time for preoperational testing or this system.

l } ff /

$0 6'

Ralph B. Gewell Nucleer Licensing Administrator i

CC.

JGKeppler USNRC 2EE 2?.L41&90950 iBA

)

NRC DISTRlRUTION FOR PART 50 DOCKET MATERIAL e

  • (TEMPORARY FORM)

CONTROL NO:___112 FILE:

pagg. Consumers Power Co.

DATE OF DOC DATE REC'D LTR TWX RPT OTHER Jackson, Michigan i

R.B. Sewell m.JE 1-1-16 XXX

- - TO:

ORIG CC OTHER SENT NRC PDR_

XXX NRC 1 Signed 39 SENT LOCAL PDR XXX CLASS UNCLASS PROPINFO INPUT NO CYS REC'D DOCKET NO:

XXX 4Q 50-155 DESCRIPTION:

ENCLOSURES:

Letter Re. their letter of 12-22-75...

Letter requesting postponment of the outage statt date for two weeks, a'nd rescheduling date of del' very to January 12-1976.......

(40"Cys. Received)

PLANT NAME:

Big Rock Pddnt

~

~ FOR ACTION /INFC RMATION ~~

SAB 1-8-76 BUTLER (L)

SCHWENCER (L) 6 211EMANN (L)

REGAN (E)

REID(L)

W/ Copics W/ Copies W/JEopies W/ Conier W/ COPIES CLARK tt.)

STOLZ (L)

DICKER (E)

LEAR (L)

W/ Copics ACKNOWLEDGED W/ Copies W/ Copies *

  • W/ Copies PARR (L)

VASSALLO (L)

KNIGHTON (E) srIns W/ Copies W/ Copics W4 Copies -

W/ Copies KNIEL (L)

PURPLE (L)

WOUNGB LOOD (E) trn

~ DO NM RMIOW W/ Copics W/ Copies WMCopics W/lopies INTERNAL DISTRIBUTIOiu rr li r-TECl1 REVIEW DENTON J !C Acc..

A/T IND.

G

.i SCHROEDE R GRIMES

.4. DIGGS (L)

BRAITMAN OGC, ROOM P.SOSA MACCARY GAMMILL H. GL ARIN (L)

SALTZMAN GOSSICK/ STAFF KNIGilT KASTNER E. GOULBOURNE (L)

MELTZ CASE PAWLICKl BALLARD P. KREUTZER (E)

SHAO SPANGLER J. LEE (L)

PLnNS

.JtOTD STELLO M. RU33T,ROOI'(L)

M OOALD MOORE (L)

HOUSTON ENVIRO S. REED (E)

CHAPMAN DEYOUNG (L)

NOVAK MULLER M. SERVICE (L)

DUBE (Ltr)

SKOVHOLT (L)

ROSS DICKER S. SHEPPARD (L)

E. COUPE GOLLER (L) (Ltr)

IPPOLITO KNIGHTON M. SLATER (E)

PETERSON P. CO LLINS TEDESCO YOUNGBLOOD H. SMITH (L)

HARTFIELD (2)

DENISE J. COLLINS REGAN S. TEETS (L)

KLECKER REG OPR LAINAS PROJECT LDR Fr WILLI AMS (E)

EISENHUT t Eltt & REGION (2)

BENAROYA V. WILSON (L)

WIGGINTON HIPC VOLLMER H A P.'. E SS R. INGR "4 (L) 5 M. DUNCAN (g)

K. PARRIS9 (L)

EXTERNAL DISTRIBUTION MCAL PDR_Chatlevoix Michi an 1 - TIC (ARERNATilY) (1)l2)(10) - N ATIONAL LABS 1 - PDR SAN /LA/NY

-i 1 -- NSIC (E UCllANAN) 1 - W. PENNINGTON, Rm E.201 GT 1 -- BROOKHAVEN NAT LAB 1 - ASLB 1 - CONSULTANTS 1 - G. ULRIKSON ORNL 1 - Newton Anderson NEWM ARK /B LUM E/AG B ABI AN

- ACRS 110LDING/SENT iy,M P00R ORIGINAL

. f (d '

  • p i

%-