Forwards Request for Change 37 to Tech Specs,Permitting Facility Operation W/One Emergency Condenser Tube Bundle Valved out-of-svc
ML20030A355
Person / Time
Site: Big Rock Point File:Consumers Energy icon.png
Issue date: 03/23/1973
From: Lamley R, Sewell R
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To: Oleary J
US ATOMIC ENERGY COMMISSION (AEC)
References
NUDOCS 8101090381
Download: ML20030A355 (4)


Text

_.,

ag p. 37

- --q g,. }

r, } s wi

(.

gj G\\t.t M'* g p ~ k CORSumBTS POWCr M

l

)

y3 '

Company 4 ; p n ~..s. u.e.o.ce..., m oi. ~.. cee. e,1 1eo.oseo a,.u

e...., o,..c.. 2,2..,.

March 23, IIl3 Mr. John F. O' Leary, Director Re: Docket No 50-155 Directorate of Licensing License No DPR-6 US Atomic Energy Commission Proposed Tech Spec Washington, DC 20545 Change No 37

Dear Mr. O' Leary:

Transmitted herewith are three (3) executed and thirty-seven (37) conformed copies of a Request for Change to the Technical Speci-fications of License No DPR-6, Mcket No 50-155. issued to Consumers Power Company on May 1,1964 for the Big Rock '>oint Plant.

This proposed change (No 37) will allow the Big Rock Point Plant to operate tith one tube bundle in the emergency condenser valved out of sersi,.e.

The normal plant procedures will require that both tube bundles are operative for plant start-up from the cold condition.

This proposal is as discussed with, and requested by, representatives of the Directorate of Regulatory Operations, Region III.

Yours very truly, fbk x.vt.(

JSR/ map Ralph B. Sewell Nuclear Licensing Administrator 9'

4 DOCFI!ID j

u:ac

\\

~

t mal:261973 > }h a cta n m IRR SECTION B XXET CLIR J

\\

N., ' t

\\ 'n l

wl w~.q l

A

{

I 5

CONSUMERS POWER COMPANY Docket No 50-155 Request for Change to the Technical Specifications Change No 37

. License No DPR-6 4

Representatives of the Directorate of Regulatory Operations, Region III, have requested the following addition be made to the Tech-nical Specifications of License No DPR-6, Docket No 50-155, issued to Consumers Power Company, May 1, 1964, for the Big Rock Point Plant:

Addition In Section 4.1.2(b), add the following:

"(b) Operating Requirements

".... The emergency condenser, core spray and backup core spray systems shall be operable and ready for j

service at all times during power operation. However, should one emergency condenser tube bundle develop a leak during power operation, it will be permissible to isolate the leaking tube bundle until the next outage.

Both bundles of the emergency, condenser shall be avail-able for service to start up the plant from the cold condition and go to power. The core spray system...."

Discussion The emergency condenser acts as a backup heat sink for reactor decay heat when the main condenser is unavailable. It will also back up the shutdown cooling system but only when the reactor head is bolted in 3

]

place. The availability to operate with one emergency condenser -loop out of service has been permissible in the Plant Operating Procedures cince Big Rock Point becams operational in 1962. Section B6.2.1 of our Pro-cedures Manual specifically states -that "if one bundle should develop a leak during power operation, it will be permissible to valve it out until-the next outage," thereby allowing for one loop operation. It is based l

,-.n

, l

i on our interpretation of Section 5.8.9 of the Final Hazards Sunmary Report (FHSR) which states specifically that "A radiation monitor on the emergency condenser vent stack will detect a release of primary steam, as may occur in the event of a tube rupture and cause an alarm in the control room.

Under this condition, the operator isolates the system by closing both condensate return valves and two moter-operated valves on the steam inlet lines to the condensing tubes. He can then reopen one system at a time to determine which tube bundle is still operative." Section 12.5.17, FHSR, alsio states that " Failure of a tube in one of the condenser tube bundles would not interfere with the ability of the remaining tube bundle to cool the reactor. Any failed tube bundle can be isolated by manual actuation (from the control room) of the motor-operated valves."

Based upon this, we have concluded that valving one emergency condenser loop out of service during power operation at the Big Rock Point Plant does not present a change in the hazards considerations described or implicit in the FHSR. This change is made solely to clarify the inter-pretation of Section 1.1.2(b) of the Technical Specifications.

4 CONSUMERS POWER COMPANY y

By R. A. Lamley, Vice Idesident 1

Date: March 23, 1973 Sworn and subscribed to_ before me this 23rd day of March 1973 5 k au.n D m

Notary Public, Jackson County, Michigan My commission expires Juna 20, 1976 4

e

-~

-w,>,

p, -

AEC DIS"9UTION FOR PART 50 DOCYET tW- \\L hi (TE.'203ARY FOP.V.)

COsiTR%,NO:

1779-

~

FIE FROM:

DATE OF DOC:

DATE REC'D LTR iGMO RPI 07Ed Consumers Power Company Jackson, Michigan 49201 Pam P. Sew 11 3-23-73 3-26-73 X

TO:

ORIG CC OIER SEI.'r AEC PD3 x

~

SE.Vf LOCAL PI,a Mr._o m srv 3 signed CIASS:

Q)J ' PROP LXF0 INPUT NO CYS REC'D DOC;2T iiO:

y 40 50-155 DESCRIP210N:

ENCLOSURES:

Ltr trans the following:

Request for change to Tech Specs - Change No.

37, notarized 3-23-73 P00R ORIGINAL hh,hh PIA C NAMES:

Big Rock FOR AC?IO:i/IN70RMATION 3-20-73 a

BUTLER (L)

SCL' DICER (L)

V ZIEMANN(L)

YOUNGELOOD(E)

W/ Cop'.es W/ Copies W/ 9 Copies W/ Copies CIARK(L)

STOLZ(L)

ROUSE (FM)

REGAN(E)

W/ Copies W/ Copies W/ Copies W/ Copies GOLLER(L)

VASSAIID(L)

DICKER (E)

W/ Copies W/ Copies W/ Copics W/ Copies

  • KNIEL(L)

SCHDEL(L)

KNIGHTON(E)

W/ Copies W/ Copies W/ Copies W/ Copies INTERNAL DISTRIBUTION h

REG FI TECH REVIEW DENTCN F&M WADE E

y'A10 run HENDRIE GRIMES

  • SMILEY BROWN E

y OGC, R00f4 P-506A SCHROEDER GAMMILL NUSSRAUMER G. WILLIAMS E p MUNTZING/ STAFF MACCARY KASTNER SHEPPARD E

CASE KNIGHT (2)

BALIARD LIC ASST.

GIAMBUSSO PAWLICKI SPANGLER SERVICE L

A/T IND BOYD SHAO WILSON L

BRAITMAN EV. MOORE-L(L'R)

STELID ENVIRO GCULBOURNE L SALTZMAN DEYOUNG-L(PWR)

HOUSTON MULLER SMITH L

V SKOVHOLT-L NOVACK DICKER GEARIN L

PIANS P. COLLINS ROSS KNIGHTON DIGGS L

MCDOIRLD IPPOLITO YOUNGBIDOD TEETS L

v DUBE REG OPR TEDESCO REGAN LEE L

V FILE & REGION (2)

IDNG PROJ LEADER WsIGRET L

INFO MORRIS IAINAS SHAFER F&M C. MILES.

STEELE BENAROYA HARLESS VOLIRER

/ ALLDI CABELL(Ltr Only.

'^

PX'PNIAL DTSTRTBt1ITON

~

.1-IDCAL PDR y 1-DTIE(ABERNATHY)

(1)(2)(9)-NATIONAL IAB'S 1-PDR-SAN /IA/NY g l-NSIC(BUCHANAN) 1-R. CARROLL

'C, GT-3227 1-GERALD LELLCUCE l-ASLB-YORE /SAYRE 1-R. CATLIN,E-256-GT' BR00KRAVEN ILiT. LAB WOODWARD /H ST.

1-CONSULTAITf'S 1-AGMED(WALTER KobfER, y16-CYS ACRS NCurD;G SETT TO LTC ASST.

NEWMARK/BLU?G/AGABIAN EM C-427, GT)

R. DIGGS ON 3-26-73 1-GERIAD ULRIKSCN....ORNL l-ED... MULLER...F-309G'

-