Acceptance of Revision to Physical Protection Plan - Enterprise Project Identifier L-2020-SPR-0002
ML20030A143
Person / Time
Site: BWX Technologies
Issue date: 02/05/2020
From: James Downs
NRC/NMSS/DFM/CTCFB
To: Terry C
BWXT
JRDowns NMSS/DFM/CTCF 415.7744
References
EPID L-2020-SPR-0002
Download: ML20030A143 (3)


Text

February 5, 2020 Mr. Chris Terry, Manager Licensing and Safety Analysis BWXT Nuclear Operations Group, Inc.

P.O. Box 785 Lynchburg, VA 24505-0785

SUBJECT:

ACCEPTANCE OF REVISION TO PHYSICAL PROTECTION PLAN (ENTERPRISE PROJECT IDENTIFIER L-2020-SPR-0002)

Dear Mr. Terry:

The U.S. Nuclear Regulatory Commission (NRC) staff has received your submittal dated December 18, 2019, transmitted by Letter 19-072. The incoming cover letter and its enclosures will not be publicly available because of their classified designation.

We have completed our acceptance review of your submittal and have identified no administrative omissions or deficiencies that would prevent us from proceeding with a detailed review. Your submittal has been assigned Enterprise Project Identifier (EPID)

L-2020-SPR-0002. Please reference this EPID number and Docket Number 70-27 in any future correspondence associated with this request.

Please note that the NRC staffs technical review of your submittal may identify issues that require additional information. Based on our preliminary evaluation and projection of current review schedules, we anticipate completing our formal review by May 31, 2020. This date could change depending on the findings of our technical review, urgent assignments, or other factors.

We will promptly communicate any significant changes to this schedule. In addition, the NRC staff estimates that completing the review of your submittal will require up to 80 staff hours, which corresponds to about $22,240.00 ($278.00/hour).

In accordance with Title 10 of the Code of Federal Regulations, Section 2.390 of the NRCs Agency Rules of Practice and Procedure, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room, or from the Publicly Available Records component of the NRCs Agencywide Documents Access and Management System (ADAMS).

ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

C. Terry 2 If you have any questions regarding this communication, please contact me at 301-415-7744 or by email at James.Downs@nrc.gov.

Sincerely,

/RA/

James R. Downs, P.E.

Technical Program Manager Fuel Facility Licensing Branch Division of Fuel Management Office of Nuclear Material Safety and Safeguards Docket No. 70-27 License No. SNM-42 cc: bwxt@listmgr.nrc.gov

C. Terry 3

SUBJECT:

ACCEPTANCE OF REVISION TO PHYSICAL PROTECTION PLAN (ENTERPRISE PROJECT IDENTIFIER L-2020-SPR-0002)

DATED: February 5, 2020 DISTRIBUTION: DFM r/f KRamsey,DFM/FFLB THarris, NSIR/DPCP NPitoniak, RII/DFFI TSippel, RII/DFFI PGlenn, RII/DFFI AAlen, RII/DFFI ADAMS Accession Number: ML20030A143 *via email OFFICE NMSS/DFM/FFLB NMSS/DFM/FFLB NMSS/DFM/FFLB NMSS/DFM/FFLB NAME JDowns ELee JZimmerman JDowns DATE 01/30/2020 02/03/2020 02/04/2020 02/05/2020 OFFICIAL RECORD COPY