MAY 0 9 E94
Docket No. 50-293
E. Thomas Boulette, PhD
Senior Vice President - Nuclear
Boston Edison Company
Pilgrim Nuclear Power Station
600 Rocky Hill Road
Plymouth, Massachusetts 02360-5599
Dear Dr. Boulette:
SUBJECT: NRC Inspection No. 50-293/94-08
An announced inspection of the solid radwaste/ transportation program at the Pilgrim Nuclear
Power Station of activities authorized by NRC License No. DPR-35 was conducted by Mr. J.
Noggle during the petiod April 11-14, 1994. The findings of the inspection were discussed
by Mr. Noggle with Mr. W. Rothert and other members of your staff on April 14, 1994.
Areas reviet ed during the inspection are important to health and safety and are discussed in
the enclosed inspection report. The areas reviewed included: radwaste processing, waste
stream sampling and analysis, preparation and shipment of radioactive material, existing on-
site storage of radioactive wastes, and plans for future on-site storage of radwaste.
Your radwaste processing and shipping programs were considered strong with an experienced
staff managing these activities. Improvements have been made in sludge storage tank
decanting and in the development of a process control progmm. A design for an interim
radwaste storage facility is approved. A partial spent fuel pool cleanout project was
underway during this inspection to remove some radwaste items that had collected over
several years. Minimal levels of stored radwaste were observed during the inspection. We
note that the trash compaction f acility was in need of maintenance.
No safety concerns or violations of NRC regulatory requirements were identified dwing the
"
inspection. No response to this letter is required.
4
1
I
9405230007 940509
OFFICIAL RECORD COPY
"P
n, p-
ADOCK 05000293
.
i' 7 ;d
G
b
,
(f'
0w
4
_
_
.
.
Boston Edison Company
2
,
Your cooperation with us is appreciated.
Sincerely,
I
Original Signed By:
James H. Joyner
James H. Joyner, Chief
Facilities Radiological Safety
'
and Safeguards Branch
Division of Radiation Safety
and Safeguards
i
.,
Enclosur
NRC Inspection Report No. 50-293/94-08
OFFICIAL RECORD COPY
,.
.
_
. . . -
. .
-
.
.-.
.
.
Boston Edison Company
3
cc w/ encl:
E. Kraft, Vice President, Nuclear Operations and Station Director
'
L. Schnieling, Plant Departmed Manager
R. Fairbank, Manager, Regulatory Affairs and Emergency Planning Department
D. Tarantino, Nuclear Information Manager
G. Basilesco, Acting Compliance Division Manager
,
R. Hallisey, Department of Public Health, Commonwealth cf Massachusetts
-
R. Arlams, Department of Labor and Industries, Commonwealth of Massachusetts
The Henorable Edward M. Kennedy
The Honorable John F. Kerry
'l
l
The Honorable Edward J. Markey
l
The Honorable Terese Murray
'
The Honorable Peter V. Fonnan
B. Abbanat, Department of Public Utilities
Chainnan, Plymouth Board of Selectmen
Chainnan, Duxbury Board of Selectmen
Chainnan, Nuclear Matters Committee
Plymouth Civil Defense Director
Paul W. Gramer, Massachusetts Secretary of Energy Resources
Sarah Woodhouse, Legislative Assistant
,
l
A. Nogee, MASSPIRG
Regional Administrator, FEMA
Office of the Commissioner, Massachusetts Department of Environmental Quality
Engineering
Office of the Attomey General, Commonwealth of Massachusetts
T. Rapone, Massachusetts Executive Office of Public Safety
Chainuan, Citizens Urging Responsible Energy
Public Document Room (PDR)
I/xal Public Document Room (LPDR)
Nuclear Safety Infonnation Center (NSIC)
K. Abraham, (2)
NRC Resident Inspector
Commonwealth of Massachusetts, SLO Designee
,
OFFICIAL RECORD COPY
_
. - . _ . .
.
.
.
_
. _ _ _ _ _ _ _ _ _
.
..
.
,
Boston Edison Company
4
bec w/ encl:
Region 1 Docket Room (with concurrences)
R. Conte, DRP
J. Shediosky, DRP
M. Oprendek, DRP
bec w/ encl (VIA IMIAIL):
l
W. Butler, NRR
R. Eaton, NR.R
V. McCree, OEDO
M. Shannon, ILPB
l-
,
?
,
.i
RI:DRSS
RI:DRSS
RI:DRSS
R{O]YNER
NOGGLE
BO
4
-
'p
'
f[
.
,
5/5/94
546/94
5/f/94
l
I
l
OFFICIAL REOORD COPY
1.
-. .
__
_
.
-
,
i