f 400,,
.eu m.c t, t -
- 6l May 11,1994
[IVION I!LECTRIC 53 Nuclear Regulatory Commission Docimient Control Desk Washington, DC 20555 ULNRC-3017
Dear Sir:
DOCKET NUMBER 50-483 CALLAWAY PLANT UNIT I FACILITY OPERATING LICENSE NPF-30 MONTIILY OPERATING REPORT APRIL 1994 The enclosed Monthly Operating Report for April,1994 is submitted pursuant to section 6.9.1.8 of the Callaway Unit i Technica! Specifications.
hlp' stW I
J. D. Blosser Manager, Callaway Plant JDf3/DEY/ JAM AM/J M/ctd I
/
Enclosure i
cc: Distribution attached l
9405190200 940430 FDR ADOCK 0500 3
1 If
... - -.=
~
-.~
.j 4
1
, J cc distribution for ULNRC 3017 with enslosures Mr. M. J. Farber, Chief Reactor Projects Section 3C U S. Nucicar Regulatory Commission
.l Region Ill 801 Warrenville Road Lisle, IL 60532-4351 Mr. L. R. Wharton (2 copics)
Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission 1 White Flint, North, Mail Stop 13E21 1155 Rockville, MD 20852 NRC Resident inspector Manager, Electric Department Missouri Public Service Commission P.O. Ilox 360 Jefferson City, MO 65102 l
j
_. _ _. =. _. _,
1.
i l
DOCKET NO.
50-483 UNIT NAME CALLAWAY UNIT I DATE 51194 COMPLETED BY J. B. McInvale TELEPilONE 314/676-8247 PART A OPERATIONS
SUMMARY
The plant operated at approximately 100% power for the month of April with the following exceptions:
Power was reduced to 97% briefly for calibration of excore nuclear instruments on 4-8,4-15, and 4-30 94.
Power was reduced to 93%'oriefly for repair of an extraction steam valve on 4-2-94.
PARTB PORV AND SAFETY VALVE
SUMMARY
None 1
Page 1 of 4
.. -......--- -.-.~..
~ - -.
PART C AVERAGE DAILY UNIT POWER LEVEL DOCKET NO ' 50-483 UNIT Callaway Unit 1 DATE 51194 COMPLETED BY J.B McInvale TELEPIIONE 314/676-8247 MONTil: APRIL 1994 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe-Net)
DAY (MWe-Net) 1 1160 17 1157 2
'133 18 1149 3
1165 19 1155 4
1158 20 1157 5
1165 21 1160 6
1170 22 1161 7
1169 23 1159 8
1156 24 1148 9
1164 25 1141 i
l 10 1165 26 1146 11 1165 27 1162 12 1164 28 1158 l
13 1162 29 1167 14 1147 30 1156 15 1150
.16 1132 1
Page 2 of 4
I PART D OPERATING DATA REPORT DOCKET NO. 50-483 UNIT NAME CALLAWAY UNIT I DATE 5 11-94 COMPLETED BY J, B. McIm ale TELEPHONE 314/676-8247 OPER ATING STA1US (YTD) (CUM)
I.
REK)3tTING PERIOD: APRIL 1994 GROSS IlOURS IN REM)RTING PERIOD: 719 2879 82,044.5 2
CURRENTLY AttrilORIZED POWER LEVEL (MWt): 3565 MAX. DEPEND. CAPACITY (MWe-Net): 1115 DESION El.LCTRICAL R ATING (MWe-Net): 1171 3.
POWER I.EVELTO WillCll RESTRICTED (IF ANY)(MWe-Net):
4.
REASONS FOR RESTRICTION (IF ANY):
31LIS MONT{l YR TO DATE
[]JMULATIVE 5.
NUMDER OF IIOURS REACTOR WAS CVITICAL..
719 2,879 71,825.7 6.
REACIOR RESERVE SillTFDOWN llOURS~.
0 0
0 7.
IlOURS GENERATOR ON LINF 719 2,845.7 70,400.8 8.
UNIT RESERVE SiitTTDOWN IIOURS.,_
0 0
0 9.
GROSS TilERM Al, ENEROY GENERATED (MW11)_..
2.538,220 9,967,515 236,832,603 10.
GROSS ELECTRICAL EhERGY GENERATED (MWil)...
871,094 3,429,139 80.800,262 11.
NET ElICTRICAL ENERGY OENERATED(MWit) 831,660 3,275,721 76,839,772 12.
REACTOR SEliVICE FACTOR.
100P 100.0 87.5 13.
REACTOR AVAILAlllLITY FACTOR..
100 0 100.0 87.5 14.
UNIT SERVICE FACTOR 100.0 98.8 '
85.8 15.
UNIT AVAILAlll! TTY FACTOR 100.0 98 8 85.8 16.
UNIT CAPACITY FACTOR (Uning MDC)....
103 7 102 84.0 17.
tTNIT CAPACITY FACTOR (Using Design MWe)..-...
98 8 97.2 80.0' I8 UNIT FORCED OUTAGE RATE -
0.0 0.0 2.43 19.
SillT1 DOWNS SCIIEDULED OVER NEXT 6 MONTils (TYPE, DATF, AND DURATION OF EACil):
20.
IF SilUT DOWN AT END OF R EPORTINO PERIOD, ESTIMATE DATE OF STAR 1UP. N/A Page 3 of 4
f
.r I
PART E i
LSTr SIILTDOWNS AND POWER REIX:CTIONS t
DOCKE ? NO.
50-183 UNIT N OiE CALLAWAY (3IT 1 DATE 5-11-94 COMPLETED BY J. Il Mclavd j
TELEPIIONE 314 676-8247 l
REPORT MONTil: APRIL 1994 t
METIIOD OF TYPE SifUTTING D0%H F:FC2CED DURADON TIIE REACTOR OR ER DATE 5: SCIIEDt' LED (Ilot 'RS)
M' REDUCING PORTR CORRECTIVF1ACTIONSCOMMENTS 2
SUMMARY
REASON METIIOD A EQUIPMENT FAILURE (EXPLAIN) 1: MAhl!AL B: MAINT.OR TEST 2: MANUALSCR.ut C: REFUEllNG 3: ALTTOMATICSCRAM D: REGULATORY RESTRICTION 4: 0rlIER(EXPLAIN) g -
E: OPERATORTRAINING AND LICENSE EXAMINATION F: ADMINISTRATION G: OPERATIONAL ERROR (EXPLAIN) 11-ODIER(EXPLAIN) k Page 4 of 4 m
.