Cnun.r.s i1. Cnest.
Baltimore Gas and Electric Company Plant General Afanager Calvert Clufp Nuclear Power Plant 16 0 Calvert Citffs Parkway 5
Calvert CliYs Nuclear Power Plant lxsby. Ataryland 20657 410 386-2200 Ext. 4 tot local 410 260-4101 Baltimore i
l May 13,1994 U. S. Nuclear Regulatory Commission Washington, DC 20555 ATTENTION:
Document Control Desk
SUBJECT:
Calvert Cliffs Nuclear Power Plant Unit Nos.1 & 2; Docket Nos. 50-317 & 50-318 April 1994 Operatine Data Reports The subject reports are being sent to you as required by Technical Specification 6.9.1.6.
Should you have any questions, please contact Mr. Bruce Mrowca at (410) 260-3989.
Very truly yours,
/
j
?
' 3htly'
$#W
/,
CIIC/FP/bjd Attachments cc:
D. A. Brune Esquire J. E. Silberg, Esquire R. A. Capra, NRC D. G. Mcdonald, Jr., NRC T. T. Martin, NRC P. R. Wilson, NRC R. A. Hartfield, NRC R.1. McLean, DNR J. II. Walter, PSC P. Lewis, INPO f
K. Larson, ANI I
9405190091 940430 PDR ADOCK 05000317 R
l QC**************************************************************************
i UNIT 1 OPERATING DATA REPORT C6****************A***********************************h*********************
Docket No. 50-317 May 13, 1994 i
Prepared by Frank Piazza 1
Telephone:(410)260-3821 OPERATING STATUS i
1.
UNIT NAME Calvert Cliffs Unit 1 2.
REPORTING PERIOD APRIL 1994 3.
LICENSED THERMAL POWER (MWT) 2700 4.
NAMEPLATE RATING (GROSS MWe) 918 I
5.
DESIGN ELECTRICAL RATING (NET MWe) 845 6.
MAXIMUM DEPENDABLE CAP'Y (GROSS MWe) 860 7.
MAXIMUM DEPENDABLE CAP'Y (NET MWe) 830 8.
CHANGE IN CAPACITY RATINGS NONE 9.
POWER LEVEL TO WHICH RESTRICTED N/A
- 10. REASONS FOR RESTRICTIONS N/A Cumulative
- This monthYear-to-Date to Date
- 11. HOURS IN REPORTING PERIOD 719 2,879 166,380
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 0.0 734.6 117,703.6
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 3,019.4
- 14. HOURS GENERATOR ON LINE 0.0 720.7 115,299.1
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 0 1,903,731 292,218,550
- 17. GROSS ELECTRICAL ENERGY GEN'TED(MWH) 0 637,493 97,111,039
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 0 606,906 92,411,188
- 19. UNIT SERVICE FACTOR 0.0 25.0 69.3
- 20. UNIT AVAILABILITY FACTOR 0.0 25.0 69.3
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 0.0 25.4 67.3
- 22. UNIT CAPACITY FACTOR (USING DER NET) 0.0 24.9 65.7
- 23. UNIT FORCED OUTAGE RATE 0.0 23.2 8.8
- 24. SHUTDOWNS SCHEDULED OVER THE NEXT SIX MONTHS (TYPE, DATE AND DURATION):
Refuel, 2/8/94, 90 Days
- Time change 1
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START-UP:
May 14, 1994 i
UNIT SIlUTDOWNS AND POWER REDUCrlONS DOCKET NO.
50-317 UNIT NAME Calvert Cliffs-U1 DATE Mav 13.1994 COMPLETED BY Frank Pia 72a TELEPHONE (410) 2NL3821 REPORT MONTIl April 1994 ME'IllOD OF SilUTHNG IICENSEE CAUSE & CORREC11VE DURATION DOWN EVENT SYS1 tim COMPONENT ACT. ION TO (llOURS)
RiiASON2 REACTOR RliPORT #
CODE CODES 3
4 N O.
DATE TYPlii PR EVENT RECURRENCli 94-O' 440209 S
719 C
4 N/A N/A N/A Unit shutdown for planned Refueling Outage.
1 F: Forced 2 Reason:
3 Method:
4 IEEE Standard 8051984 S: Scheduled A - Equipment Failure 1 - Manual B - Maintenan#or Test 2 - Manual Scram.
C - Refueling 3 - Automatic Scram.
5 IEEE Standard 803A-1983 D - Regulatory Restriction 4 - Continued E - Operator Training & License Examination 5 - Reduced Load F-Administrative 9 - Other G - Operational Error H - Other
I t
AVERAGE DAILY UNIT POWER LEVEL co**********************************************************************
Docket No. 50-317 Calvert Cliffs Unit No. 1 May 13, 1994 Prepared by Frank Piazza Telephone: (410) 260-3821 1
APRIL 1994
.l Average Daily Power Level Average Daily Power Level Day (MWe-Net)
Day (MWe-Net) 1 0
17-0 2
0 18 0
'l 3
0 19 0
t 4
0 20 0
l 5
0 21 0
6 0
22 0
7 0
23 0
8 0
24 0
j 9
0 25 0
10 0
26 0
11 0
27 0
12 0
28 0
j 13 0
29 0
-l 4
I 14 0
30 0
15 0
16 0
1 1
k DOCKET NO. 50-317 CALVERT CLIFFS - UNIT 1 May 13,1994
SUMMARY
OF OPERATING EXPERIENCE April 1994 The unit began the month shutdown for the refueling outage and remained shutdown the entire month. The following significant work was completed during the month:
+ Reactor Vessel refueling was completed.
+ 12A Reactor Coolant Pump motor was replaced because of an electrical problem which developed during its start up.
+ New 13KV Voltage Regulators were installed and testing is ongoing.
l t
b b
P y
+
4 y
we
May 9,1994 Page 2 of 3 B.EFUELING INFORMATION REQUEST 1.
Name of facility: Calvert Cliffs Nuclear Power Plant, Unit No.1.
2.
Scheduled date for next refueling shutdown: Unit is currently shutdown for refueling.
Next shutdown for refueling will be March,1996.
3.
Scheduled date for restart following refueling: May 14,1994.*
4.
Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment?
Operation after refueling will require a change to the " Core Operating Limits R eport".
5.
Scheduled date(s) for submitting proposed licensing action and supporting information.
Unknown.
6.
Important licensing considerations associated with the refueling.
None identified at this time.
7.
The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool.
(a) 217 *
(b) 1514 (Note 2)
- Spent fuel pools are common to Units 1 and 2.
8.
(a) The present licensed spent fuel pool storage capacity, and (b) the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies.
(a) 4710 (Note 1)
(b) 0 9.
The projected date of the last refueling that can be discharged to the Spent Fuel Pool assuming the present licensed capacity and maintaining space for one full core off-load.
March 2014 NOTE 1:
4710 total licensed site storage capacity.
(1830 pool + 2880 ISFSI)
NOTE 2:
72 Spent Fuel Assemblies in the ISFSI.
Entry has changed since last reported.
co**************************************************************************
UNIT 2 OPERATING DATA REPORT co**************************************************************************
Docket No. 50-318 May 13, 1994 Prepared by Frank Piazza Telephone:(410)260-3821 i
OPERATING STATUS 1.
UNIT NAME Calvert Cliffs Unit 2 2.
REPORTING PERIOD APRIL 1994 3.
LICENSED TilERMAL POWER (MWT) 2700
- 4. NAMEPLATE RATING (GROSS MWe) 911 S.
DESIGN ELECTRICAL RATING (NET MWe) 845 6.
MAXIMUM DEPENDABLE CAP'Y (GROSS MWe) 860 7.
MAXIMUM DEPENDADLE CAP'Y (NET MWe) 830 8.
CHANGE IN CAPACITY RATINGS NONE 9.
POWER LEVEL TO WHICH RESTRICTED N/A
- 10. REASONS FOR RESTRICTIONS N/A Cumulative
- This monthiear-to-Date to Date
- 11. HOURS IN REPORTING PERIOD 719 2,879 149,735
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 719.0 2,706.2 108,743.0
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 1,296.6
- 14. HOURS GENERATOR ON LINE 719.0 2,703.0 107,226.6
- 15. UNIT RESERVE SilUTDOWN HOURS 0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 1,933,979 7,229,010 274,094,553
- 17. GROSS ELECTRICAL ENERGY GEN'TED(MWH) 650,885 2,434,365 90,590,234
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 625,113 2,337,370 86,580,504
- 19. UNIT SERVICE FACTOR 100.0 93.9 71.6
- 20. UNIT AVAILABILITY FACTOR 100.0 93.9 71.6
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 104.7 97.8 70.1
- 22. UNIT CAPACITY FACTOR (USING DER NET) 102.9 96.1 68.4
- 23. UNIT FORCED OUTAGE RATE 0.0 6.1 5.7
- 24. SHUTDOWNS SCHEDULED OVER THE NEXT SIX MONTHS (TYPE, DATE AND DURATION):
N/A
- Time change
- 25. IF UNIT IS SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START-UP:
N/A l
.1
UNIT SIlUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-318 UNIT NAME Calvert Cliffs-U2 DATE May 13.1994 COMPLETED BY Frank Pia 77a TELEPHONE (41012GL3S21 REPORTMONTil April 1994 METIIOD OF SillTITING LICENSEE CAUSE & CORRECTIVE DURAllON DOWN EVENT SY5TEh!
COMPONENT ACllON TO 3
4 S
(IIOURS)
REASON 2 REACFOR REPORT #
CODE CODE PRIiVENT RECURRENCE N O.
DATE TYPEI There were no significant power reductions this month i
1 F: Forced 2 Reason:
3 Method:
4 IEEE Standard 805-1984 S: Scheduled A-Equipment Failure 1 - Manual B - Maintenance or Test 2 - Manual Scram.
C-Refueling 3 - Automatic Scram.
5 IEEE Standard 803A-1983 D - Regulatory Restriction 4 - Continued E - Operator Training & License Examination 5 - Reduced Load F-Administrative 9 - Other G - Operational Error H - Other
AVERAGE DAILY UNIT POWER LEVEL cc**********************************************************************
Docket No. 50-318 Calvert Cliffs Unit No. 2 May 13, 1994 Prepared by Frank Piazza Telephone: (410) 260-3821 APRIL 1994 Average Daily Power Level Average Daily Power Level Day (MWe-Net)
Day (MWe-Net) 1 872 17 871 2
872 18 870 3
837 19 871 4
873 20 867 5
873 21 866 6
873 22 866 7
872 23 866 8
873 24 861 9
873 25 862 10 873 26 867 11 874 27 863 12 874 28 863 13 874 29 866 14 872 30 862 15 871 16 871 I
d DOCKET NO. 50-318
. CALVERT CLIFFS - UNIT 2
)
May 13,1994
SUMMARY
OF OPERATING EXPERIENCE j
dpril 1994 The unit began the month at 100% reactor power.
Reactor power was reduced on April 24,1994 at 1853 due to the main turbine intercept valve shutting. The valves shut when 4 KV bus #21 was lost during testing of the Safety Related Voltage Regulators. Reactor power was reduced to approximately 95% at 1908. The unit was returned to 100% power at 2200 on April 24,1994 and remained there through the end of the month.
7 6
f i
' t b
t 9
b w-
,n-
-.n.,
a n.-
e
,.e
s April 29,1994 Page 3 of 3 REFUELING INFORMATION REQUEST 1.
Name of facility: Calvert Cliffs Nuclear Power Plant, Unit No. 2 2.
Scheduled date for next refueling shutdown: February 18,1995.
3.
Scheduled date for restart following refueling: May 3,1995.
4.
Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment?
Unknown.
5.
Scheduled date(s) for submitting proposed licensing action and supporting information.
Unknown.
6.
Important licensing considerations associated with the refueling.
None identified at this time.
7.
The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool.
(a) 217 (b) 1514 (Note 2)
- Spent fuel pools are cornmon to Units 1 and 2.
8.
(a) The present licensed spent fuel pool storage capacity, and (b) the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies.
(a) 4710 (Note 1)
(b) 0 9.
The projected date of the last refueling that can be discharged to the Spent Fuel Pool assuming the present licensed capacity and mainta;ning space for one full core off-load.
March 2016.
NOTE 1:
4710 total licensed site storage capacity.
(1830 pool + 2880 ISFSI)
NOTE 2:
72 Spent Fuel Assemblies in the ISFSt.
Entry has changed since last reported.