ML20029E257
| ML20029E257 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 04/21/1994 |
| From: | Verrelli D NRC Office of Inspection & Enforcement (IE Region II) |
| To: | Beard P Florida Power Corp |
| Shared Package | |
| ML20029E258 | List: |
| References | |
| NUDOCS 9405180056 | |
| Download: ML20029E257 (3) | |
See also: IR 05000302/1994007
Text
l
'
,
.
,gl m
Docket No. 50-302
License No. DPR-72
Mr. P. M. Beard Jr.
Senior Vice President, Nuclear Operations
ATTN: Manager, Nuclear Operations
Licensing, NA21
Florida Power Corporation
15760 West Power Line Street
Crystal River, FL 34428-6708
Gentlemen:
SUBJECT: NOTICE OF VIOLATION
(NRC INSPECTION REPORT NO. 50-302/94-07)
This refers to the inspection conducted by Ross Butcher of this office on
March 5 through April 1, 1994.
The inspection included a review of activities
authorized for your Crystal River facility.
At the conclusion of the
inspection, the findings were discussed with those members of your staff
identified in the enclosed report.
Areas examined during the inspection are identified in the report.
Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observation of
activities in progress.
Based on the results of this inspection, certain of your activities appeared
to be in violation of NRC requirements, as specified in the enclosed Notice of
Violation (Notice).
You are required to respond to this letter and should follow the instructions
specified in the enclosed Notice when preparing your response.
In your
response, you should document the specific actions taken and any additional
actions you plan to prevent recurrence.
After reviewing your response to this
Notice, including your proposed corrective actions and the results of future
inspections, the NRC will determine whether further NRC enforcement action is
necessary to ensure compliance with NRC regulatory requirements.
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice", a copy of
this letter, its enclosures, and any reply will be placed in the NRC Public
Document Room.
The responses directed by this letter and the enclosed Notices are not subject
to the clearance procedures of the Office of Management and Budget as required
by the Paperwork Reduction Act of 1980, Pub. L. No. 96.511.
, , ,
~,m
( V
U
9405180056 940421
I
ADOCK 05000302
G
fp
e
,
.
.
,
TM 2 l JP1
Florida Power Corporation
2
Should you have any questions concerning this letter, please contact us.
Sincerely,
,
h p ark
DtteEr{ 971. YIfA N
David M. Verre11i, Chief
Reactor Projects Branch 2
Division of Reactor Projects
t
l
Enclosures:
1.
,
'
2.
NRC Inspection Report
cc w/encls:
Gary L. Boldt, Vice President
Nuclear Production (SA2C)
Florida Power Corporation
15760 West Power Line Street
Crystal River, FL 34428-6708
B. J.'Hickle, Director
Nuclear Plant Operations (NA2C)
15760 West Power Line Street
Crystal River, FL 34428-6708
R. C. Widell, Director (NA21)
Nuclear Operations Site Support
15760 West Power Line Street
Crystal River, FL 34428-6708
Gerald A. Williams
Corporate Counsel
MAC - ASA
P. O. Box 14042
St. Petersburg, FL 33733
Attorney General
Department of Legal Affairs
The Capitol
Tallahassee, FL 32304
Bill Passetti
Office of Radiation Control
Department of Health and
Rehabilitative Services
1317 Winewood Boulevard
Tallahassee, FL 32399-0700
- c w/encls:
Continued see page 3
c
,
. .
.
.
.
-
r
.
.
,
?l m;
- nn
Florida Power Corporation
3
cc w/encls:
Continued
Joe Myers, Director
Division of Emergency Preparedness
Department of Community Affairs
2740 Centerview Drive
Tallahassee, FL 32399-2100
Chairman
Board of County Commissioners
Citrus County
110 N. Apopka Avenue
Inverness, FL 36250
Robert B. Borsum
B&W Nuclear Technologies
1700 Rockville Pike, Suite 525
Rockville, MD 20852-1631
bec w/ encl:
K. Landis, Rll
L. Raghavan, NRR
Document Control Desk
NRC Resident Inspector
U.S. Nuclear Regulatory Commission
6745 N. Tallahassee Road
Crystal River, FL 34428
SEND
OFC
RI!
,O
r
Rf!
. A
TO
NAME
Along
,
Klandis
04/\\k/94
04/h/94
PDR?
DATE
/
/94
/
/%
/
/94
Yes
No
COPY?
Yes
No
Yes
No
Yes
No
Yes
No
Yes
No
OfflCIAL RtCORD COFf
DOCUMENT NAME: A:\\CR94-07A.RPi