ML20029E153
| ML20029E153 | |
| Person / Time | |
|---|---|
| Site: | Seabrook |
| Issue date: | 05/05/1994 |
| From: | Office of Nuclear Reactor Regulation |
| To: | |
| Shared Package | |
| ML20029E154 | List: |
| References | |
| NUDOCS 9405170112 | |
| Download: ML20029E153 (1) | |
Text
T
/
y
(_0NTAINMENT SYSTEMS PRIMARY CONTAINMENT CONTAINMENT VENTILATION SYSTEM SURVEILLANCE RE0VIREMENTS 4.6.1.7.1 At least once per 92 days each 8-inch containment purge supply and exhaust isolation valve with resilient material seals shall be demonstrated OPERABLE by verifying that the measured leakage rate is less than or equal to 0.01 L, when pressurized to P,.
4.6.1.7.2 Each 8-inch containment purge supply and exhaust isolation valve shall be verified to be sealed closed or open in accordance with Specification 3.6.1.7 at least once per 31 days.
9405170112 940505 PDR ADOCK 05000443 p
PDR SEABROOK - UNIT 1 3/4.6-13 Amendment No. 29
h' f
CONTAINMENT SYSTEMS T
3/4.6.2 DEPRESSVRIZA1101 AND COOLING SYSTEMS CONTAINMENT SPRAY SYSTEM LIMITING CONDITION FOR OPERATION 3.6.2.1 Two independent Containment Spray Systems shall be OPERABLE with each Spray System capable of taking suction from the RWST* and automatically trans-ferring suction to the containment sump.
APPLICABILITY: MODES 1, 2, 3, and 4.
ACTION:
1 With one Containment Spray,, stem inoperable, restore the inoperable Spray System to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />; restore the inoperable Spray System to OPERABLE status within the next 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> or be in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
SVRVEILLANCE RE0VIREMENTS 4.6.2.1 Each Containment Spray System shall be demonstrated OPERABLE:
a.
At least once per 31 days by verifving that each valve (manual, power-operated, or automatic) ir flow path that is not locked, sealed, or otherwise secured i-on is in its correct position; b.
By verifying, that on recircul, aw, each pump develops a differential pressure of greatei
, or equal to 262 psi when tested pursuant to Specification 4.0.5; c.
At least once per 18 months during shutdown, by:
1)
Verifying that each automatic valve in the ficw path actuates to its correct position on a Containment Pressure-Hi-3 test signal, and 2)
Verifying that each spray pump starts au'cMatically on a Containment Pressure-Hi-3 test signal.
d.
At least once per 10 years by performing an air or smoke flow test through each spray header and verifying each spray nozzle is l
unobstructed.
- In MODE 4, when the Residual Heat Removal System is in operation, an OPERABLE flow path is one that is capable of taking suction from the refueling water storage tank upon being manually realigned.
SEABROCK - UNIT 1 3/4 6-14 Amendment No. 30