o ELECTRLCALPQWER SYSTEMS LIMITING CONDITION FOR OPERATION (Continued)

  • For the purposes of completing maintenance, modification, and/or technical specification surveillarce requirements, on the 0 diesel generator and its support systems during a refuel outage, as part of pre-planned maintenance, modifications, and/or the surveillance program, the requirements of action statement b are modified to:

1.

Eliminate the requirement for performing technical specification surveillance requirements 4.8.1.1.1.a on each operable AC source, immediately and once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter, when the 0 diesel generator is declared inoperable.

2.

Allow an additional 96 hours0.00111 days <br />0.0267 hours <br />1.587302e-4 weeks <br />3.6528e-5 months <br /> in excess of the 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> allowed in action statement b for the 0 diesel generator to be inoperable.

Provided that the following conditions are met:

A.

Unit 2 is in operational condition 4 or 5 or defueled prior to taking the 0 diesel generator out of service.

B.

Surveillance requirements 4.8.1.1.la and 4.8.1.1.2a.4 are successfully completed, for the offsite power sources and the 1A and 2A diesel generators, within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> prior to removal of the O diesel generator from service.

C.

No maintenance is performed on the offsite circuits or the 1A or 2A diesel generators, while the 0 diesel generator is inoperable.

D.

Technical specification requirement 4.8.1.1.la is performed daily, while the O diesel generator is inoperable.

E.

The control circuit for the unit cross-tie circuit breakers between buses 142Y and 242Y are temporarily modified to allow the breakers j

to be closed with a diesel generator feeding the bus, while the 0 diesel generator is inoperable.

)

l The provisions of technical specification 3.0.4 are not applicable.

j LA SALLE - UNIT 1 3/4 8-l a Amendment No. 72, 99 l

9405170067 940510 PLMt ADOCK 0:K)D0373 -

p PDR-

J-ELECTRI{AL POWER SYSTEMS LIMITING CONDITION FOR OPERATION (Continued)

  • For the purposes of completing maintenance, modification, and/or technical specification surveillance requirements, on the 0 diesel generator and its support systems during a refuel outage, as part of pre-planned maintenance, modifications, and/or the surveillance program, the requirements of action statement b are modified to:

1.

Eliminate the requirement for performing technical specification surveillance requirements 4.8.1.1.1.a on each operable AC source, immediately and once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter, when the 0 diesel generator is declared inoperable.

2.

Allow an additional 96 hours0.00111 days <br />0.0267 hours <br />1.587302e-4 weeks <br />3.6528e-5 months <br /> in excess of the 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> allowed in action statement b for the 0 diesel generator to be inoperable.

Provided that the following conditions are met:

A.

Unit 1 is in operational condition 4 or 5 or defueled prior to taking the 0 diesel generator out of service.

8.

Surveillance requirements 4.8.1.1.la and 4.8.1.1.2a.4 are successfully completed, for the offsite power sources and the 1A and 2A diesel generators, within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> prior to removal of the 0 diesel generator from service.

C.

No maintenance is performed on the offsite circuits or the 1A or 2A diesel generators, while the 0 diesel generator is inoperable.

D.

Technical specification requirement 4.8.1.1.la is performed daily, while the 0 diesel generator is inoperable.

E.

The control circuit for the unit cross-tie circuit breakers between buses 142Y and 242Y are temporarily modified to allow the breakers to be closed with a diesel generator feeding the bus, while the 0 diesel generator is inoperable.

The provisions of technical specification 3.0.4 are not applicable.