e f "%q
,g ii S
UNITED STATES ii NUCLEAR REGULATORY COMMISSION g-
,/
WASHINGTON, D.C. 205W0001 Docket Nos. 50-352 May 6, 1994 and 50-353 Mr. George A. Hunger, Jr.
Director-Licensing, MC 52A-5 PEco Energy Company Nuclear Group Headquarters Correspondence Control Desk P. O. Box No. 195 Wayne, Pennsylvania 19087-0195
Dear Mr. Hunger:
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION (RAI) FOR LIMERICK GENERATING STATION, UNITS 1 AND 2, TECHNICAL SPECIFICATIONS CHANGE REQUEST N0.
93-18-0 (TAC NOS. M88656 AND M88609)
On January 14, 1994, PECO Energy Company submitted an application to amend the Technical Specifications (TS) for Limerick Generating Station, Units 1 and 2.
The proposed change would revise the TSs to increase the allowable leak rate for the main steam isolation valves (MSIVs) and delete the MSIV Leakage Control System (LCS).
In order to complete our review, we require further information regarding the issues discussed below.
The submittal stated that (1) the Turbine Building will withstand a Safe Shutdown Earthquake (SSE), (2) the main steam system supports can maintain their integrity during an SSE, and (3) the block wall adjacent to the main steam transmitters w'ill not fall during an SSE. However, there is no further explanation or calculation to substantiate the above conclusions.
Furthermore, the walkdown report, which was also enclosed in the submittal, had indicated that several piping supports needed to be modified and others further investigated.
Therefore, we request that the conclusions discussed above be substantiated by submitting the analysis method and results.
It was only stated that the main steam system supports can maintain their integrity during an SSE and was silent on the condition of other supports whose integrity during an SSE may also be questioned due to this TS change.
Consequently, it is also requested that a justification for the integrity of all the piping supports of the pathways that are needed for supporting the TS change request be submitted.
If you have any questions regarding this RAI, please contact me at (301) 504-1447.
9405100310 940506 PDR ADOCK 05000352 P
PDR 0S00g 3(s q llo
d l
Mr. George A. Hunger. Jr. March 6, 1994 The requirements of this letter affect fewer than 10 respondents, and therefore, are not subject to the Office of Management and Budget review under P.L.96-511.
- Sincerly,
/s/
l Frank Rinaldi, Project Manager Project Directorate I-2 Division of Reactor Projects - I/II l
Office of Nuclear Reactor Regulation cc: See next page DISTRIBUTION:
Docket File NRC & Local PDRs PDI-2 Reading SVarga JCalvo CMiller FRinaldi M0'Brien JHarold OGC ACRS(10)
EWenzinger, RGN-I JWhite, RGN-I 0FFICE LA:PDI-2 PE:PDI-3 PM:PDI-21 f D:PDI)V/
M0'BRIEdhS 'n.JHARhktle FRINAi.D h CNIkbb
/
NM 6'/ k /94 7 / y /g4 j^/d/94
/( /g4
/ /
DATE OFFICIAL RECORD COPY FILENAME: A:\\LI88656.RAI
i
\\
~
O l
Mr. George A. Hunger, Jr. May 6, 1994 The requirements of this letter affect fewer than 10 respondents, and therefore, are not subject to the Office of Management and Budget review under P.L.96-511.
J
- Sincerly, Gnu na Frank Rinaldi, Project Manager l
Project Directorate I-2 Division of Reactor Projects - I/II l
Office of Nuclear Reactor Regulation cc:
See next page 1
l l
l I
l 1
j 4
s Mr. George A. Hunger, Jr.
Limerick Generating Station, PECO Energy Company Units 1 & 2 i
cc:
I i
J. W. Durham, Sr., Esquire Mr. Rich R. Janati, Chief Sr. V.P. & General Coun:;e1 Division of Nuclear Safety PECO Energy Company PA Dept. of Environmental Resources l
2301 Market Street P. O. Box 8469 Philadelphia, Pennsylvania 19101 Harrisburg, Pennsylvania 17105-8469 Mr. Rod Krich, 52A-5 Mr. James A. Muntz l
PECO Energy Company Superintendent-Technical 4
955 Chesterbrook Boulevard Limerick Generating Station Wayne, Pennsylvania 19087-5691 P. O. Box A Sanatoga, Pennsylvania 19464 l
Mr. David R. Helwig, Vice President Limerick Generating Station Mr. James L. Kantner 4
Post Office Box A Regulatory Engineer Sanatoga, Pennsylvania 19464 Limerick Generating Station P. O. Box A Mr. Robert Boyce Sanatoga, Pennsylvania 19464 Plant Manager Limerick Generating Station Library P.O. Box A US Nuclear Regulatory Commission Sanatoga, Pennsylvania 19464 Region I 475 Allendale Road l
Regional Administrator King of Prussia, PA 19406 U.S. Nuclear Regulatory Commission Region I Mr. Larry Hopkins 475 Allendale Road Superintendent-0perations i
King of Prussia, PA 19406 Limerick Generating Station P. O. Box A 1
j Mr. Neil S. Perry Sanatoga, Pennsylvania 19464 Senior Resident Inspector l
VS Nuclear Regulatory Commission Mr. John Doering, Chairman i
i P. O. Box 596 Nuclear Review Board i
Pottstown, Pennsylvania 19464 PECO Energy Company j
955 Chesterbrook Boulevard Mr. Craig L. Adams Mail Code 63C-5 i
Superintendent - Services Wayne, Pennsylvania 19087 j
Limerick Generating Station 4
P.O. Box A i
Sanatoga, Pennsylvania 19464 4
i i
a