Issue date: 03/23/1994
From: Gates W
OMAHA PUBLIC POWER DISTRICT
To: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML20029D470 List:
References
NUDOCS 9405060005
Download: ML20029D474 (3)


Text

. _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _

.=

t Omaha Public Power District 444 South 16th Street Mall Omaha, Nebraska 68102-2247 402/636-2000 g

March 23, 1994 h

LIC-94-0045 9

L. J. Callan, Regional Administrator U. S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064

References:

1. Docket No. 50-285 2.

Letter from NRC (S. J. Collins) to OPPD (T. L. Patterson) dated January 11, 1994

Dear Mr. Callan:

SUBJECT:

SERVICE WATER SYSTEM OPERATIONAL PERFORMANCE INSPECTION By Reference 2 the NRC informed Omaha Public Power District (0ND) of its intent to conduct a Service Water System Operational Performance Inspection (SWSOPI) at the Fort Calhoun Station (FCS). This inspection is currently scheduled for the period of May 10 through June 10, 1994, and would be conducted using Temporary Instruction 2515/118 " Service Water System Operational Performance Inspections (SWSOPI)", Revision 1.

As discussed in a telephone conversation on March 16, 1994 between Mr. R. Short (OPPD) and Mr. T. Stetka (NRC) the purpose of this letter is ta inform the NRC that OPPD proposes to perform a self-assessment of the Service Water Systems operational performance at FCS.

The scope and depth of tha self-nsessment proposed by OPPD will be based on the NRC Inspection Manual Procedure 40501,

" Licensee Self-Assessments Related to Area-Of-Emphasis Inspections", and TI 2515/118, " Service Water System Operational Performance Inspection (SWSOPI),"

Revision 1.

Further, OPPD proposes that the self-assessment be accepted by the NRC as an alternative to conducting the referenced team inspection of the same area.

The OPPD self-assessment will be scheduled for either October or November of 1994, with the final date to be agreed upon by OPPD and the NRC.

OPPD self-assessment team members, experience summaries and a detailed schedule will be prepared and will be made available to the NRC for review. A detailed description of the self-assessment process, team membership, experience summaries and schedule will be provided to the NRC by July 1, 1994.

9405060005 940503 PDR ADOCK 05000285 G

PDR (b-de<L7 os sm 0

ggogn<,1me,,,

L. J. Callan LIC-94-0045 Page 2 Please contact me if you have any questions.

Sincerely, NW h. $ 69 W. G. Gates Vice President l

1 WGG/ epm c:

LeBoeuf, Lamb, Leiby & MacRae T. P. Gwynn, NRC Director, Division of Reactor Safety W. D. Johnson, NRC Chief, Reactor Projects Section A T. F. Stetka, NRC Chief, Reactor Projects Section D S. D. Bloom, NRC Project Manager R. P. Mullikin, NRC Senior Resident Inspector Document Control Desk

Omaha Public Power District E-Mail report to D. Sullivan (DJS) bec to DMB (IE51) bcc distrib, by RIV: (with attached letter)

L. J. Callan Resident Inspector DRSS-FIPB-MIS System Branch Chief (DRP/D)

Project Engineer (DRP/D)

RIV File Branch Chief (DRP/TSS)

Senior Resident Inspector - Cooper Leah Tremper, OC/LFDCB, MS: MNBB 4503 T. Gody, Sr., NRR, MS: 12E4 a

l 1

I RIV:C:EB:DRS*

ADD:DRS*byTPG D:DRP*

D:DR[ Y DRA % /?f TFWesterman JAMitchell ABBeach TPGwynn' JMdg'omb 4/26/94 4/29/94 YJ29/94

[/Y94 f $/94

/

R#c e, t (IN ss LJCall art

$ "y94 l

/.

  • Previously Concurred

- -__- _.-_-___-__