Text
4
pR N Gv
UNITED STATES
%
NUCLEAR REGULATORY COMMISSION
+
?.
/ ^j
.
j
'ii
REGION IV
..
^
f
' 8
611 RYAN PLAZA DRIVE, SUITE 400
o
Y,
[
AR LING TON, T E X AS 76011-8064
yj
APR 2 91994
w
Docket:
50-298
License:
Nebraska Public Power District
ATTN: Guy R. Horn, Vice President - Nuclear
P.O. Box 98
Brownville, Nebraska 68321
SUBJECT: NRC INSPECTION REPORT 50-298/94-03 (NOTICE OF VIOLATION)
This refers to the inspection conducted by R. Kopriva of this office on
January 2 through February 12, 1994. The inspection included a review of
activities authorized for your Cooper Nuclear Station facility. At the
conclusion of the inspection, the findings were discussed with you and those
members of your staff identified in the enclosed report.
Areas examined during the inspection are identified in the report. Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observation of
activities in progress.
The purpose of the inspection was to determine
whether activities authorized by the license were conducted safely and in
accordance with NRC requirements.
Based on the results of this inspection, certain licensed activities appeared
to be in violation of NRC requirements, as specified in the enclosed Notice of
Violation (Notice). The violation is of concern because it showed a weakness
in your control of manual primary containment isolation valves. Although this
weakness had been identified by members of your staff in evaluation of
Licensee Event Report 93-012, your corrective action to develop a systematic
'
method to ensure that manual primary containment isolation valves were
properly controlled had not been completed.
Inspectors found additional
examples where manual primary containment isolation valves were not controlled
by approved procedures.
In addition, an unresolved item was opened regarding the acceptability of a
single manual valve for containment isolation purposes. Two examples where
the primary containment isolation valve configuration was not in accordance
with the original design were identified.
In another case, original drawings
showed that two valves were required, yet in many instances only one manual
valve has been provided for primary containment integrity.
You are required to respond to this letter and should follow the instructions
2,pecified in the enclosed Notice when preparing your response.
In your
response, you should document the specific actions taken and any additional
actions you plan to prevent recurrence. After reviewing your response to this
Notice, including your proposed corrective actions and the results of future
'
4
9405040042 940429
)
ADOCK 05000298
)
l
G
,.
_ -
.
- . - _ .
- . . - .
-
- - . -
- . . . -
..
-
.-.
l
-
E
i
Nebraska Public Power District
-2-
.
inspections, the NRC will determine whether further NRC enforcement action is
necessary to ensure compliance with NRC regulatory requirements.
,
!
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a. copy of
i
this letter and its enclosures will be placed in the NRC Public Document Room.
4
The responses directed by this letter and the enclosed Notice are not subject
~
!
to the clearance procedures of the Office of Management and Budget as required
by the Paperwork Reduction Act of 1980, Pub. L. No. 96.511.
'
'
4
j
Should'you have any questions concerning this inspection, we will be pleased
i
to discuss them with you,
e
i
i
Sincerely,
,
A. Bill Beach, Director
Division of Reactor Projects
-,
Enclosures:
1.
Appendix A - Notice of Violation
-
2.
Appendix B - NRC Inspection Report
50-298/94-003
cc w/ enclosures:
Nebraska Public Power District
ATTN:
G. D. Watson, General Counsel
'
P.O. Box 499
Columbus, Nebraska 68602-0499
Nebraska Public Power District
ATTN: Mr. David A. Whitman
P.O. Box 499
Columbus, Nebraska 68602-0499
,braska Department of Environmental
Quality
,
ATTN: Randolph Wood, Director
P.O. Box 98922
Lincoln, Nebraska 68509-8922
Nemaha County Board of Commissioners
ATTN: Larry Bohlken, Chairman
Nemaha County Courthouse
1824 N Street
Auburn, Nebraska 68305
i
.
.-.
- . -
- , . .
.
.- ,.Y
.
.
-
. - - _ _ _ _ _ - _ .
.
Nebraska Public Power District
-3-
Nebraska Department of Health
ATTN: Harold Borchert, Director
Division of Radiological Health
'
301 Centennial Mall, South
P.O. Box 95007
Lincoln, Nebraska 68509-5007
Department of Natural Resources
ATTN:
Ronald A. Kucera, Department Director
of Intergovernmental Cooperation
'
P.O. Box 176
Jefferson City, Missouri 65102
Kansas Radiation Control Program Director
,
,
.-
. . . . . . -
t
i
1 -
.
Nebraska Public Power District
-4-
- APR 2 St 1994-
E-Mail report to D. Sullivan (DJS)
bec to DMB (IE01)
.
bec distrib. by RIV:
L. J. Callan
Resident Inspector
Branch Chief (DRP/C)
Lisa.Shea, RM/ALF, MS: MNBB 4503
MIS System
DRSS-FIPB
Branch Chief (DRP/TSS)
Project Engineer (DRP/C)
RIV File
Senior Resident Inspector - River Bend
Senior Resident -Inspector - Fort Calhoun
-
-
r
!
'
!
-
l
.
RIV:SNQRP/C
C:DRP/Cf )
D:DRP i M
- AKopba:sn
JEGahrdo
ABBeachN
I2/0/94
If//94
k/ /94
2
.
- ~
w
w
~
=n,a
+.w.4
e,
w.<r
w
-
u.
, m , - +
,,w----y,,,,,,y,---m--g+4-
a.en,. - - , ,
+sr y -- o ,e y
,pmo-
w--
g
.,
.~e.,,a
. . . _ .
.-
_ - .
-
._
-
-
Nebraska Public Power District
-4-
. M 2 91994:
.,
E-Mail report to D. Sullivan (DJS)
bec to DMB (IE01)
I
bec distrib. by RIV:
L. J. Callan
Resident Inspector
. Branch Chief (DRP/C)
Lisa Shea, RM/ALF, MS: MNBB 4503
,
MIS System
'
DRSS-FIPB
'
' Branch Chief (DRP/TSS)
Project Engineer.(DRP/C)
1
RIV File
Senior Resident Inspector - River Bend
j
Senior Resident : Inspector - Fort Calhoun
-i
,
t
!
!
!
t
?
E
f
I
i
!
'l
?
!
!
!
M
RIV:SMQRP/C
C:DRP/Cj )
D:DRP .
/tAKopba:sn
JEGahhdo
ABBeach '[
l
/ /94
k/ /94
I2/S/94
2
1