ML20029D062
| ML20029D062 | |
| Person / Time | |
|---|---|
| Site: | San Onofre |
| Issue date: | 04/28/1994 |
| From: | Marsh W SOUTHERN CALIFORNIA EDISON CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML13326A159 | List: |
| References | |
| NUDOCS 9405030359 | |
| Download: ML20029D062 (1) | |
Text
-___
f%n n, M
Southem Califamia Edison Company 23 PAF1KER ST F4E ET IRVINE, CALIFORNIA 92718 Apri1 28, 1994 n u,.F,0~c WALM H C. fMOSH
$AANAGEH OF NtK;L f AR nFGU1 ATOHV AF F AIFsB (714)454-4403 U. S. Nuclear Regulatory Commission l.
Attention: Document Control Desk j
Washington, D. C.
20555 j
Subject:
Docket Nos. 50-206, 50-361 and 50-362 1993 Annual Radiological Environmental Operating Report San Onofre Nuclear Generating Station Unit 1 and Units 2 and 3 j
As required by Technical Specification (TS) Sections 6.9.1.6 and 6.9.1.7 of l
Unit 1 Operating License DPR-13, and TS Section 6.9.1.6 of Facility Operating l
Licenses NPF-10 and NPF-15 for Units 2 and 3, respectively, this letter i
(~
transmits the 1993 Annual Radiological Environmental Operating Report (ARE0R) for San Onofre Unit 1 and Units 2 and 3.
The AREOR covers the operation of San Onofre Units 1, 2 and 3 during the calendar year 1993, and includes summaries, interpretations, and analysis of trends of the results of the Radiological Environmental Monitoring Program.
1 If you require any additional information, please let me know.
Very truly yours, Alb> 0 l Enclosure cc:
L. J. Callan, Administrator, NRC Region IV K. E. Perkins, Director, Walnut Creek Field Office, NRC Region IV M. K. Webb, NRC Project Manager, San Onofre Unit 1 M. B. Fields, NRC Project Manager, San Onofre Units 2 and 3 Louis Carson, Regional Project Manager, San Onofre Unit 1 J. A. Sloan, NRC Senior Resident Inspector, San Onofre Units 2 & 3 R. F. Dudley, Section Chief, Decommissioning Section
- !. Kocol, Department of Health Services, Sacramento
/
ohh06 DO K PDR s