ML20029C911

From kanterella
Jump to navigation Jump to search
Responds to NRC Re Violations Noted in Insp Repts 50-369/93-20 & 50-370/93-20.Corrective Actions:Briefing to Promote More Effective Communication Performed
ML20029C911
Person / Time
Site: McGuire, Mcguire  Duke Energy icon.png
Issue date: 04/25/1994
From: Mcmeekin T
DUKE POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9405030002
Download: ML20029C911 (2)


Text

__

/-

DukeIbw Company T C hicuerxm kicCuire Nudear Generanon Department Vice l>esident 127,90 Haps FerryRoad(AIGOHP)

(704)8754800 HuntersvWe, NC28078M ~

(704)8754809 Fat DUKEPOWER April 25,1994 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555

Subject:

McGuire Nuclear Station, Units 1 and 2 Docket Nos. 50-369 and 50-370 NRC inspection Report No. 50-369,370/93-20 Response to a Notice of Violation and imposition of Civil Penalty Change in Format of Operations Shift Briefings Gentlemen:

By letter dated January 13,1994, NRC Region 11 issued a Notice of Violation and Proposed Imposition of Civil Penaity. This action follows NRC Inspection Report Nos. 50-369/93-20 and 50-370/93-20 concerning a special inspection conducted by an Augmented Inspection. Team (AIT) at McGuire Nuclear Station during the period of September 1-5,1993. McGuire Nuclear Station's response dated February 10,1994 concerning an inadvertent operational mode change (Violation 1.A.) stated the format _of Operations Shif t Briefings had been modified to shorten them, reduce the number of persons involved and set expectations for participation. Pre-shift briefings were conducted in the Control Room for watch standing licensed operators and a subsequent briefing conducted for the remainder of the Operations team at a different location.

Beginning April 11,1994, the Operations shif ts initiated a pliot project to enhance the quality and efficiency of pro-shift briefings conducted after completion of operator turnover by the incoming shift. The briefing involves the entire on-duty Operations shift team by having all Senior Reactor Operators, Reactor Operators and Non-licensed Operators report to the Control Room for a pre-shift briefing conducted by the Senior Reactor Operators. The objective of the briefing format change is to promote more effective communications between Operations team members and to ensure eacri member is aware of plant status prior to starting shift work. All team members are encouraged to actively participate in the briefing. In addition, pre-shift briefings will facilitate completion of the shift turnover process in an orderly manner to ensure Control Room personnel and other team members are prepared to start work related activities.

The effectiveness of this briefing format will be evaluated during the next five weeks at which time Operations management will consider continuation of the formal and implementation of format '

enhancements, as appropriate.

Should there be any questions concerning this response, contact Randy Cross at (704) 875-4179.

Very Trul Yours,

  1. y/

T. C. McMecklo 9405030002 940425 hk PDR ADOCK 05000369

)

O PDR

-[

g

~__

_~.

't 9 '

U.S. Nuclear Regulatory Commission April 25,1994 Xc:

Mr, S. D, Ebneter Mr. George Maxwell Regional Administrator, Region ll NRC Senior Resident inspector U.S. Nuclear Regulatory Commission McGuire Nuclear Station 101 Marietta St., NW, Suite 2900 Atlanta, Georgia 30323 Mr. Victor Norses U.S. Nuclear Ro0ulatory Commission Ollice of Nuclear Reactor Regulation One White Flint North, Mail Stop 9H3 Washin0 ton, D. C. 20555 n

1 t

fr w'

u 1=

y-Y y

w w

w-T