MONTHYEARML20199H2771999-01-20020 January 1999 Proposed Tech Specs Changing Table 3.3.8.1-1 to Revise Allowable Values for Degraded Voltage Relay Reset & Dropout Setpoints as Specified Per Items 1.c,1.d,2.c & 2.d ML20196A0941998-11-20020 November 1998 Proposed Tech Specs Re Div 3 Diesel Generator Droop Issue ML20196A1501998-11-20020 November 1998 Revised Pages Constituting Rev 3 to CPS TS Bases,Consisting of Pages Annotated with Rev Numbers 3-1,3-2,3-3,3-4 & 3-5. Changes to Text Identified with Rev Bars.No Rev Bars Included for Changes to Format ML20155A5631998-10-23023 October 1998 Proposed Tech Specs LCO 3.6.1.9, FW LCS (FWLCS) for Implementation of FWLCS Mode of RHR Sys U-603088, Proposed Tech Specs Section 5.5.13,allowing Next Scheduled Performance of LLRT of Primary Containment Penetration for RPV Head Spray Piping (IMC-042) to Be Deferred Until Seventh Refueling Outage (RF-7)1998-10-0505 October 1998 Proposed Tech Specs Section 5.5.13,allowing Next Scheduled Performance of LLRT of Primary Containment Penetration for RPV Head Spray Piping (IMC-042) to Be Deferred Until Seventh Refueling Outage (RF-7) ML20153F4201998-09-23023 September 1998 Corrected Proposed Tech Specs Bases Page B 3.8-94 Re SVC Protection Sys ML20237E4191998-08-24024 August 1998 Proposed Tech Specs SR 3.8.1.17,revising Acceptance Criteria for Meeting ready-to-load Requirement for Division 3 DG ML20237C3501998-08-17017 August 1998 Proposed Tech Specs Partially Reducing Load at Which DGs Are Required to Be Tested Per Affected SRs in Order to Reduce Stress & Wear on Machines While Still Sufficiently Challenging Machines to Confirm Operability ML20236X0071998-07-31031 July 1998 Proposed Tech Specs,Revising Acceptance Criteria of SRs 3.8.1.7,3.8.1.12,3.8.1.15 & 3.8.1.20 ML20216B1511998-05-0404 May 1998 Proposed Tech Specs Pages,Incorporating Requirements for Static Var Compensator (SVC) Protection Sys Under New TS ML20217M3351998-04-27027 April 1998 Proposed Tech Specs Re Mgt Changes Occurring in Operations Organization at Plant ML20212C6951997-10-23023 October 1997 Proposed Tech Specs,Constituting Rev 2 to CPS TS Bases.Rev Consists of Pages Annotated W/Rev Numbers 2-1 Through 2-14 ML20149J1701997-07-22022 July 1997 Proposed Tech Specs Requesting Exemption to 10CFR50,App a, General Design Criteria to Allow Operation W/Identified Offsite Circuit Condition U-602714, Proposed Tech Specs Table 3.3.8.1-1 Re Loss of Power Instrumentation1997-04-0101 April 1997 Proposed Tech Specs Table 3.3.8.1-1 Re Loss of Power Instrumentation ML20133F2051997-01-0707 January 1997 Proposed Tech Specs 2.0 Re Safety Limits ML20133A5951996-12-13013 December 1996 Proposed TSs Re Transfer of Minority Ownership ML20134M3181996-11-19019 November 1996 Proposed Tech Specs Revising Table 3.3.8.1-1, Loss of Power Instrumentation, by Dividing Function, Degraded Voltage - 4.16 Kv Basis & Degraded Voltage Dropout - 4.16 Kv Basis, re-numbering Items in Table & Revising Associated Notes ML20128K0711996-10-0404 October 1996 Proposed Tech Specs 3.3.8.1,adding Action Statement & Note Requiring Restoration of Inoperable Degraded Voltage Relays, Rev to Table 3.3.8.1-1 ML20134C1631996-09-20020 September 1996 Proposed Tech Specs,Revising TS 3.3.4.1, End of Cycle Recirculation Pump Trip Instrumentation, to Delete SR 3.3.4.1.6 Which Requires RPT Breaker Interruption Time to Be Determined at Least Once Per 60 Months U-602623, Proposed Tech Specs 3.10.10, Single Control Rod Withdrawal- Refueling1996-08-15015 August 1996 Proposed Tech Specs 3.10.10, Single Control Rod Withdrawal- Refueling ML20116N1101996-08-15015 August 1996 Proposed Tech Specs 2.0, Safety Limits, Changing TS to Incorporate Revised SLMCPR as Calculated by GE for CPS Cycle 7 U-602619, Proposed Tech Specs 5.0, Administrative Controls, Deleting Examples Currently Included in Parentheses1996-08-15015 August 1996 Proposed Tech Specs 5.0, Administrative Controls, Deleting Examples Currently Included in Parentheses ML20113E7261996-06-28028 June 1996 Proposed Tech Specs,Allowing Removal of Inclined Fuel Transfer Sys Primary Containment Blind Flange While Primary Containment Required to Be Operable U-602591, Proposed Tech Specs,Allowing Utilization of RWP or Equivalent to Control Entry Into High Radiation Area, Clarifying Example Given in TS of Individuals Qualified in Radiation Protection Procedures1996-06-21021 June 1996 Proposed Tech Specs,Allowing Utilization of RWP or Equivalent to Control Entry Into High Radiation Area, Clarifying Example Given in TS of Individuals Qualified in Radiation Protection Procedures ML20108C9431996-05-0101 May 1996 Proposed Tech Specs,Implementing 10CFR50,App J - Option B ML20107L0011996-04-19019 April 1996 Proposed Tech Specs,Revising Listed TS to Eliminate Core Alterations as Applicable Condition for Which Associated LCO Must Be Met ML20100H7741996-02-22022 February 1996 Proposed Tech Specs,Proposing to Revise TS 3.6.5.1, Drywell, to Allow Drywell Bypass Leakage Tests to Be Performed at Intervals of Up to Ten Yrs Based on Demonstrated Performance of Drywell Barrier ML20100H7901996-02-22022 February 1996 Proposed Tech Specs,Deleting SR 3.3.8.1.1 Which Requires Channel Check for Loss of Power Instrumentation & Changing TS Table 3.3.8.1-1 to Change Allowable Value for Degraded Voltage Function from 3762V & 3832V to 3876V ML20100H8171996-02-22022 February 1996 Proposed Tech Specs,Changing TS 3.4.11, RCS P/T Limits, to Incorporate Specific P/T Limits for Bottom Head Region of Rv Separate & Apart from Core Beltline Region of Rv ML20100H8411996-02-22022 February 1996 Proposed Tech Specs,Changing TS 3.3.4.1, End of Cycle Recirculation Pump Trip Instrumentation, to Delete SR 3.3.4.1.6 Which Requires RPT Breaker Interruption Time to Be Determined at Least Once Per 60 Months ML20095G4791995-12-14014 December 1995 Proposed Tech Specs 3.4.2, Flow Control Valves Re Proposed Deletion of Average Rate of Movement Verification Requirement ML20095G5141995-12-14014 December 1995 Proposed Tech Specs 3.3.1.1, RPS Instrumentation & TS 3.3.6.1, Primary Containment Dwl Isolation Instrumentation to Eliminate Periodic Response Time Testing of Analog Trip Modules ML20095G6401995-12-14014 December 1995 Proposed Tech Specs Instrumentation Associated W/High Pressure Core Spray Sys,Reactor Core Isolation Cooling Sys & Residual Heat Removal Sys ML20094D2141995-10-27027 October 1995 Proposed Tech Specs,Consisting of Changes to TS 5.2.2.e to Revise Requirements for Controls on Working Hs of Unit Staff That Perform SR Functions ML20094D2031995-10-27027 October 1995 Proposed Tech Specs,Consiting of Changes to TS 3.1.3 to Include 25% Surveillance Overrun Allowed by LCO 3.0.2 Into Allowances of Surveillance Notes for Control Rod Notch Testing Per SR 3.1.3.2 & SR 3.1.3.3 ML20085N0621995-06-23023 June 1995 Proposed Tech Specs Bases,Per TS 5.5.11, TS Bases Control Program ML20085F5961995-06-0909 June 1995 Proposed Tech Specs,Incorporating Description of Exclusion Area Boundary ML20085J9701995-02-16016 February 1995 Proposed Tech Specs Reflecting Enforcement Discretion Re TS LCO for Div 2 DC Electrical Power Sources ML20078Q2931995-02-14014 February 1995 Proposed Tech Specs 3.8.2, AC Sources-Shutdown, 3.8.5, DC Sources-Shutdown & 3.8.8, Inverters-Shutdown ML20078N2701995-02-10010 February 1995 Proposed TS 3.3.2.1, Control Rod Block Instrumentation ML20078E9701995-01-27027 January 1995 Proposed Tech Specs,Eliminating Selected Response Time Testing Requirements U-602372, Proposed Tech Specs Requesting Complete Rev of CPS TS for Conversion to Improved TS Per Guidance Provided by NUREG-1434, Improved BWR-6 TS, Rev 0,dated Sept 19921994-11-18018 November 1994 Proposed Tech Specs Requesting Complete Rev of CPS TS for Conversion to Improved TS Per Guidance Provided by NUREG-1434, Improved BWR-6 TS, Rev 0,dated Sept 1992 ML20076G2721994-10-14014 October 1994 Proposed Tech Specs,Allowing Drywell Bypass Leakage Test to Be Performed at five-yr Interval ML20072E6701994-08-12012 August 1994 Proposed Tech Specs Eliminating Requirement to Perform Manual Testing of solid-state Logic Independently from self-test Sys ML20072E6191994-08-12012 August 1994 Proposed Tech Specs Allowing Drywell Bypass Leakage Rate Tests to Be Performed at Intervals as Long as Ten Years ML20072C1251994-08-0505 August 1994 Proposed Tech Specs Re Requirement for Accelerated Testing of Div 1 DG ML20069Q3851994-06-27027 June 1994 Proposed Tech Specs 3/4.4.3.1, Reactor Coolant Sys Leakage- Leakage Detection Sys ML20069N3201994-06-16016 June 1994 Proposed Tech Specs Adding -89 After ASTM D3803 in Testing Requirements Specified for SGTS & MCR Filter Sys Charcoal & Changing Test Temp for Testing SGTS Charcoal from 80 C to 30 C ML20069K8191994-06-13013 June 1994 Proposed Tech Specs to Allow 36-inch Isolation Valve Leak Measurement Be Performed at Least Once Per 18 Months, Providing Valves Remain Closed During Period ML20070N6951994-04-26026 April 1994 Proposed Tech Specs Adopting Changes Recommended in NRC Re NUREG-1434 1999-01-20
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20209E0551999-07-0606 July 1999 1999 Business Plan ML20206F2231999-04-27027 April 1999 NRC Manual Chapter 0350 Restart Action Plan for Clinton Power Station ML20199H2771999-01-20020 January 1999 Proposed Tech Specs Changing Table 3.3.8.1-1 to Revise Allowable Values for Degraded Voltage Relay Reset & Dropout Setpoints as Specified Per Items 1.c,1.d,2.c & 2.d ML20206E6281998-12-31031 December 1998 Rev 17 to ODCM for Clinton Power Station ML20196A0941998-11-20020 November 1998 Proposed Tech Specs Re Div 3 Diesel Generator Droop Issue ML20196A1501998-11-20020 November 1998 Revised Pages Constituting Rev 3 to CPS TS Bases,Consisting of Pages Annotated with Rev Numbers 3-1,3-2,3-3,3-4 & 3-5. Changes to Text Identified with Rev Bars.No Rev Bars Included for Changes to Format ML20155A5631998-10-23023 October 1998 Proposed Tech Specs LCO 3.6.1.9, FW LCS (FWLCS) for Implementation of FWLCS Mode of RHR Sys U-603088, Proposed Tech Specs Section 5.5.13,allowing Next Scheduled Performance of LLRT of Primary Containment Penetration for RPV Head Spray Piping (IMC-042) to Be Deferred Until Seventh Refueling Outage (RF-7)1998-10-0505 October 1998 Proposed Tech Specs Section 5.5.13,allowing Next Scheduled Performance of LLRT of Primary Containment Penetration for RPV Head Spray Piping (IMC-042) to Be Deferred Until Seventh Refueling Outage (RF-7) ML20153F4201998-09-23023 September 1998 Corrected Proposed Tech Specs Bases Page B 3.8-94 Re SVC Protection Sys ML20237E4191998-08-24024 August 1998 Proposed Tech Specs SR 3.8.1.17,revising Acceptance Criteria for Meeting ready-to-load Requirement for Division 3 DG ML20237C3501998-08-17017 August 1998 Proposed Tech Specs Partially Reducing Load at Which DGs Are Required to Be Tested Per Affected SRs in Order to Reduce Stress & Wear on Machines While Still Sufficiently Challenging Machines to Confirm Operability ML20236X0071998-07-31031 July 1998 Proposed Tech Specs,Revising Acceptance Criteria of SRs 3.8.1.7,3.8.1.12,3.8.1.15 & 3.8.1.20 ML20236Q4661998-07-17017 July 1998 Rev 0 to Procedure 2800.93, Emergency Reserve Auxiliary Transformer Integrated Test ML20236Q4651998-07-17017 July 1998 Rev 0 to Procedure 2800.92, Emergency Reserve Auxiliary Transformer Integrated Test ML20236Q4571998-07-17017 July 1998 Rev 0 to Procedure 2800.91, Emergency Reserve Auxiliary Transformer Test ML20216B1511998-05-0404 May 1998 Proposed Tech Specs Pages,Incorporating Requirements for Static Var Compensator (SVC) Protection Sys Under New TS ML20217M3351998-04-27027 April 1998 Proposed Tech Specs Re Mgt Changes Occurring in Operations Organization at Plant ML20203D5651998-02-19019 February 1998 Plan for Excellence ML20212C6951997-10-23023 October 1997 Proposed Tech Specs,Constituting Rev 2 to CPS TS Bases.Rev Consists of Pages Annotated W/Rev Numbers 2-1 Through 2-14 ML20149J1701997-07-22022 July 1997 Proposed Tech Specs Requesting Exemption to 10CFR50,App a, General Design Criteria to Allow Operation W/Identified Offsite Circuit Condition ML20149H8991997-06-30030 June 1997 CPS Long Term Improvement Plan U-602714, Proposed Tech Specs Table 3.3.8.1-1 Re Loss of Power Instrumentation1997-04-0101 April 1997 Proposed Tech Specs Table 3.3.8.1-1 Re Loss of Power Instrumentation ML20133F2051997-01-0707 January 1997 Proposed Tech Specs 2.0 Re Safety Limits ML20133A5951996-12-13013 December 1996 Proposed TSs Re Transfer of Minority Ownership ML20134M3181996-11-19019 November 1996 Proposed Tech Specs Revising Table 3.3.8.1-1, Loss of Power Instrumentation, by Dividing Function, Degraded Voltage - 4.16 Kv Basis & Degraded Voltage Dropout - 4.16 Kv Basis, re-numbering Items in Table & Revising Associated Notes ML20128K0711996-10-0404 October 1996 Proposed Tech Specs 3.3.8.1,adding Action Statement & Note Requiring Restoration of Inoperable Degraded Voltage Relays, Rev to Table 3.3.8.1-1 ML20134C1631996-09-20020 September 1996 Proposed Tech Specs,Revising TS 3.3.4.1, End of Cycle Recirculation Pump Trip Instrumentation, to Delete SR 3.3.4.1.6 Which Requires RPT Breaker Interruption Time to Be Determined at Least Once Per 60 Months ML20116N1101996-08-15015 August 1996 Proposed Tech Specs 2.0, Safety Limits, Changing TS to Incorporate Revised SLMCPR as Calculated by GE for CPS Cycle 7 U-602619, Proposed Tech Specs 5.0, Administrative Controls, Deleting Examples Currently Included in Parentheses1996-08-15015 August 1996 Proposed Tech Specs 5.0, Administrative Controls, Deleting Examples Currently Included in Parentheses U-602623, Proposed Tech Specs 3.10.10, Single Control Rod Withdrawal- Refueling1996-08-15015 August 1996 Proposed Tech Specs 3.10.10, Single Control Rod Withdrawal- Refueling ML20137A1101996-08-14014 August 1996 Rev 19 to App V Second 10-Yr Interval Pump & Valve Testing Program Plan ML20137A1021996-07-10010 July 1996 Rev 5 to App IV Second 10-Yr Interval Inservice Exam Plan ML20113E7261996-06-28028 June 1996 Proposed Tech Specs,Allowing Removal of Inclined Fuel Transfer Sys Primary Containment Blind Flange While Primary Containment Required to Be Operable U-602591, Proposed Tech Specs,Allowing Utilization of RWP or Equivalent to Control Entry Into High Radiation Area, Clarifying Example Given in TS of Individuals Qualified in Radiation Protection Procedures1996-06-21021 June 1996 Proposed Tech Specs,Allowing Utilization of RWP or Equivalent to Control Entry Into High Radiation Area, Clarifying Example Given in TS of Individuals Qualified in Radiation Protection Procedures ML20108C9431996-05-0101 May 1996 Proposed Tech Specs,Implementing 10CFR50,App J - Option B ML20107L0011996-04-19019 April 1996 Proposed Tech Specs,Revising Listed TS to Eliminate Core Alterations as Applicable Condition for Which Associated LCO Must Be Met ML20100H8411996-02-22022 February 1996 Proposed Tech Specs,Changing TS 3.3.4.1, End of Cycle Recirculation Pump Trip Instrumentation, to Delete SR 3.3.4.1.6 Which Requires RPT Breaker Interruption Time to Be Determined at Least Once Per 60 Months ML20100H7901996-02-22022 February 1996 Proposed Tech Specs,Deleting SR 3.3.8.1.1 Which Requires Channel Check for Loss of Power Instrumentation & Changing TS Table 3.3.8.1-1 to Change Allowable Value for Degraded Voltage Function from 3762V & 3832V to 3876V ML20100H8171996-02-22022 February 1996 Proposed Tech Specs,Changing TS 3.4.11, RCS P/T Limits, to Incorporate Specific P/T Limits for Bottom Head Region of Rv Separate & Apart from Core Beltline Region of Rv ML20100H7741996-02-22022 February 1996 Proposed Tech Specs,Proposing to Revise TS 3.6.5.1, Drywell, to Allow Drywell Bypass Leakage Tests to Be Performed at Intervals of Up to Ten Yrs Based on Demonstrated Performance of Drywell Barrier ML20095G5141995-12-14014 December 1995 Proposed Tech Specs 3.3.1.1, RPS Instrumentation & TS 3.3.6.1, Primary Containment Dwl Isolation Instrumentation to Eliminate Periodic Response Time Testing of Analog Trip Modules ML20095G6401995-12-14014 December 1995 Proposed Tech Specs Instrumentation Associated W/High Pressure Core Spray Sys,Reactor Core Isolation Cooling Sys & Residual Heat Removal Sys ML20095G4791995-12-14014 December 1995 Proposed Tech Specs 3.4.2, Flow Control Valves Re Proposed Deletion of Average Rate of Movement Verification Requirement ML20117E3001995-11-0606 November 1995 Rev 18 to App V Pump & Valve Testing Program Plan ML20094D2031995-10-27027 October 1995 Proposed Tech Specs,Consiting of Changes to TS 3.1.3 to Include 25% Surveillance Overrun Allowed by LCO 3.0.2 Into Allowances of Surveillance Notes for Control Rod Notch Testing Per SR 3.1.3.2 & SR 3.1.3.3 ML20094D2141995-10-27027 October 1995 Proposed Tech Specs,Consisting of Changes to TS 5.2.2.e to Revise Requirements for Controls on Working Hs of Unit Staff That Perform SR Functions ML20085N0621995-06-23023 June 1995 Proposed Tech Specs Bases,Per TS 5.5.11, TS Bases Control Program ML20085F5961995-06-0909 June 1995 Proposed Tech Specs,Incorporating Description of Exclusion Area Boundary ML20087J5691995-05-17017 May 1995 Rev 17 to App V, Pump & Valve Testing Program Plan of CPS ISI Program Manual ML20085J9701995-02-16016 February 1995 Proposed Tech Specs Reflecting Enforcement Discretion Re TS LCO for Div 2 DC Electrical Power Sources 1999-07-06
[Table view] |
Text
.
l l
i Attachment 3 to U-602254 !
RS-92-011 Page 1 of 5
) REACTIVITY CONTROL SYSTEMS CONTROL ROD OPERABILITY SURVEILLANCE REQUIREMENTS (Continued) 4.1.3.1.2 When above the low power setpoint of the RPCS, all withdrawn control rods not required to have their directional control valves disarmed electrically or hydraulically shall be demonstrated OPERABLE by moving each control rod at least one notch:
- a. At least once per 7 days and
- b. At least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> when any control rod is immovable as a result of excessive friction or mechanical interference.
4.1.3.1.3 All control rods shall be demonstrated OPERABLE by performance of Surveillance Requirements 4 1.3.R. 4.1.3.1-_4 1.3.4 and 4.1.3.5.
6/.3.7.1, 413.2.2 e determined OPERABLE by
~
4.1.3.1.4 The scram discharge volume snali demonstrating the scram discharge volume drain and vent valves are OPERABLE at least once per 18 months, by verifying that the drain and ven't valves:
- a. Close within 30 seconds after receipt of a signal for control rods to scram and
.) Open when the scram signal is reset.
b.
9404290193 940418 PDR P
ADOCK 05000461 PDR CL1HTON - UNIT _1 3/4 1-5
.. Attachment 3 to U-602254 RS-92-011 REACTIVITY CONTROL SYSTEMS Page 2 of 5 CONTROL R00 MAXIMUM SCRAM INSERTION TIMES LIMITING CONDITION FOR OPERATION 3.1.3.2 The maximum scram insertion time of each control rod from the fully withdrawn position, based on deenergization of the scram pilot valve solenoids as time zero, shall not exceed the following limits:
Maximum Insertion Times to Notch Position (Seconds)
Reactor Vessel Dome Pressure (psig)* 43 29 13 0.31 0.81 1.44 l
950 1050 0.32 0.86 1.57 APPLICABILITY: OPERATIONAL CONDITIONS 1 and 2.
ACTION:
- a. With the maximum scram insertion time of one or more control rods exceeding the maximum scram insertion time limits of Specification 3.1.3.2 as deter-mined by Surveillance Requirement 4A v3.1 r 'g* ooerati.on may continue provided that: .j,3, g, p q tj,1,3.p, {
- 1. For all " slow" control rods, i.e., those which exceed the limits of Specification 3.1.3.2, the individual scram insertion times do ~\ l not exceed the following limits:
Maximum Insertion Times ;
to Notch Position (Seconds) 1 Reactor Vessel Dome l Pressure (psig)* 43 29 13 950 0.38 1.09 2.09 J 1050 0.39 1.14 2.22
- 2. For " fast" control rods, i.e. , those which satisfy the limits of Specification 3.1.3.2, the average scram insertion times do not exceed the following limits:
Maximum Average Insertion Times to Notch Position (Seconds)
Reactor Vessel Dome Pressure (psig)* 43 29 13 950 0.30 0.78 1.40 1050 0.31 0.84 1.53
- For intermediate reactor vessel dome pressure, the scram time criteria are l determined by linear interpolation at each notch position.
)
CLINTON - UNIT 1 3/4 1-6 Amendment No. 18
'* Attachment 3 l
.~ , to U-602254 l RG-92-Oli !
i Page 3 of 5 REACTIVITY CONTROL SYSTEMS CONTROL R00 MAX 1 HUM SCRAM INSERTION TIMES i LIMITING CONDITION FOR OPERATION (Continued) 3.1.3.2 ACTION (Continued):
- 3. The sum of "f ast" control rods with individual scram insertion times in excess of the limits of ACTION a.2 and of " slow" control rods does not exceed 5.
- 4. No " slow" control rod, " fast" control rod with individual scram insertion time in excess of the limits of ACTION a.2, or otherwise inoperable control rod occupy adjacent locations in any direction, including the diagonal, to another such control rod.-
Otherwise, be in at least HOT SHUTDOWN within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />,
- b. With a " slow" control rod (s) not satisfying ACTION a.1, above:
- 1. Declare the " slow" control rod (s) inoperable and 1.b
- 2. PerformtheSurveillanceRequirementsofSpecification4.1.3.2./at least once per 60. days when operation is continued with three or
-) more " slow" control rods declared inoperable.
Otherwise, be in at least HOT SHUTDOWN within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
- c. With the maximum scram insertion time of one or more control rods exceed-ing the maximum scram insertion time limits of Specification 3.1.3.2 as determined by Specification 4.1.3.2. operation may continue provided that:
1.b
" Slow" control rods, i.e., those which exceed the limits of Specifi-1.
cation 3.1.3.2, do not make up more than 20% of the 10% sample of control rods tested.
- 2. Each of these " slow" control rods satisfies the limits of ACTION a.1.
- 3. The eight adjacent control rods surrounding each " slow" control rod are:
a) Demonstrated through measurement within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> to satisfy the maximum scram insertion time limits of Specification 3.1.3.2 and b) OPERABLE.
g
- 4. The total nu r of " slow" control rods as determined by.Specifica-tion 4.1.3.2./, when added to the sum of ACTION a.3 as determined
=d # does not exceed 5.
by Speci ficationt4.1. 3. .
{Q.I.s.p.).e, u d H i.L 2.3.)
Otherwise, be in at leasEHOT SHUT 00WN within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
')
- d. The provisions of Specification 3.0.4 are not applicable.
CLINTON - UNIT 1 3/4 1-7
QQlbe Whk & hnEnuj hng. _' W &m t 3 j hEACTIVITY CON 1EOL SYSTIME -, -- to U-602254 j v RS-92-011 .
CONTR0_L_ ROD MAXIMUM SCRAM INSERTION TIMES Page 4 of 5
~
}URVflLLANCE REQUIREMENTS 4.1.3.2.1 The maximum scram insertion time of the control rods shall be l demonstrated through measurement with reactor coolant pressure greater than or equal to 950 psig and, during single control rod scram time tests, the control rod drive pumps isolated from the accumulators:
- a. For all control rods prior to THERMAL POWER exceeding 40% of RATED THERMAL POWER following CORE ALTERATIONS or after a reactor shutdown that is greater than 120 days,
- b. For at least 10% of the control rods, on a rotating basis, at least once l per 120 days of POWER OPERATION.
4.1.3.2.2 The maximum scram insertion time for specifically affected individual control rods following maintenance on or modification to the control rod or control rod drive system which could affect the scram insertion time of those specific control rods shall be demonstrated through measurement with reactor coolant pressure greater than or equal to 950 psig.
Alternatively, those specific control rods may be determined OPERABLE with reactor coolant pressure less than 950 psig by demonstrating an acceptable scram insertion time to notch position 13. The scram time acceptance criteria for this alternate test shall be determined by linear interpolation between 0.95 seconds at a reactor coolant pressure of 0 psig and 1.40 seconds at 950 psig. If this alternate test is utilized, the individual scram time shall also be measured with reactor coolant pressure greater than or equal to 950 psig prior to exceeding 40% of RATED THERMAL POWER. For each of the above
- single control rod scram time tests, the control rod drive pumps shall be isolated from the accumulators.
- The provisions of Specification 4.0.4 are not applicable for entry into OPERATIONAL CONDITION 2 provided this surveillance requirement'is completed prior to entry into OPERATIONAL CONDITION 1.
CLINTON - UNIT 1 3/4 1-8 Amendment No. 81 1
4
Attachment 3 to U-602254 RS-92-011 Page 5 of 5
{
SPECIAL P TEST EXCEPTIONS 3/4.10.2 R00 PATTERN CONTROL SYSTEM
, LIMITING CONDITION FOR OPERATION 3.10.2 The sequence constraints imposed on control rod groups by the rod pattern control system (RPCS) per Specification 3.1.4.2 may be' suspended by means of the individual rod position bypass switches for the.following tests:
a.
i^M 1 1 b.
Shutdown marginSpecification Control rod scram, demonstrations, 4.1.3.c.Specificf(St.M./
^^^^ ~ ^ ^
- c. Control rod friction measurements.
- d. Startup Test Program with the THERMAL POWER less than 20% of RATED THERMAL POWER.
APPLICABILITY: OPERATIONAL CONDITIONS 1 and 2.
ACTION:
With the requirements of the above specification not satisfied, verify that the RPCS is OPERABLE per Specification 3.1.4.2.
SURVEILLANCE REQUIREMENTS f
. 4.10.2 When the sequence constraints imposed on control rod groups by the RPCS are bypassed, verify:
- a. With 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> prior to bypassing any sequence constraint and at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> while any sequence constraint is bypassed, that movement of the control rods from 75% R00 DENSITY to the RPCS low power setpoint is ..
limited to the established control rod sequence for the specified test, and
- b. Conformance with this specification and test procedures by a second licensed operator or other technically qualified member of the unit technical staff.
(
CLINTON - UNIT 1 3/4 10-2