ML20029B367
| ML20029B367 | |
| Person / Time | |
|---|---|
| Site: | 05000128 |
| Issue date: | 03/01/1991 |
| From: | Michaels T Office of Nuclear Reactor Regulation |
| To: | Hall K TEXAS A&M UNIV., COLLEGE STATION, TX |
| References | |
| NUDOCS 9103070117 | |
| Download: ML20029B367 (3) | |
Text
_
- 3..
' March 1, 1991-e Docket No.550-128 Dr.:K.'R;-Hall,-Detuty Director
' Texas Engineering Experiment Station
-Texas A&M University System-
)
College Stution, Texas 77843
Dear Dr.' Hall:
h
SUBJECT:
- TEXAS A&M UNIVERSITY OPERATOR REQUALIFICATION PROGRAM y
H The staff of the U.S. Nuclear Regulatory Connission has completed 11ts review l
and evaluation of the change to the Reactor Operator Requalification Program
~
Lfor the Texas A&M University TRIGA-Reactor facility that we.s subnitted by:
letter dated June 4, 1990. The program was reviewed against the criteria in 10'CFR Part 55.
. Based on its review,!the staff concludes that the change to add physical-o
-security training to'the operator requalification If Eyou:have-any questions. please contact me-at -(301) program is acceptable.:
j 492-1102.
Sincerely, p
L OriO'nal signed by:
l 4
Theodore S.- Michaels, Senior Project Ma'noger i
h Non-Power Reactorsi Deconnissioning and i.,
-EnvironmentalProjectDirectorate Division of Advanced Reactors and Special' Projects Office of Nuclear. Reactor. Regulation-i cc: :See next,page-
}-
DISTRIBUT'10N3 d
y Docket file-LTMichaels.
NRC &!Loca1JPDRs OGC PDNP r/f.
EJordan LDCrutchfield ACRS(10), --
WTravers
- PDNP Plant file -
l;
' EHy lton -
-Region IV-g
[TH LTR2 KHall) 9103070117 910301
(;
PDR ADOCK OScOO128!
A i
P PDR:
I/ b P
~W IPDNP:PM' DNP:C'-
ton TMichael :dmj SWeiss 3/ ;/91; 3//(/91-3/ / /91 l
D Fo 1 T60049 ho.
L
f[7 f(
UNITED STATES
(#
- 0
]-
(
.o NUCLEAR REGULATORY COMMISSION 4)
-1 W ASHINGTON, D. C. 20666 March 1,1991 Docket No. 50-128-l Dr. K. R. Hall, Deputy Director Texas Engineering Experiment Station Texas A&M University System
. College Station, Texas 77843
Dear Dr. Hall:
SUBJECT:
TEXAS A&M UNIVERSITY OPERATOR REQUAl.lTICA110N PROGRAM The staff of the U.S._ Nuclear Regulatory Conaission has completed its review-dnd evaluation of the change to the Reactor Operator Requalification Program-for the Texas A&M University TRIGA Reector fecility thet was submitted by letter dated June 4, 1990. The progrom was reviewed against the criteria in~10 CFR Part 55.
Based on its review, the staff concludes 'e t the change to add physical a
gcurity tr61ning to the operdtor requair.ication program is acceptable.
If you have any questions,-please contact me et (301) 492-1102.
Sincerely, l
5lh't Theodore S. Michaels, Senior. Project Manager Non-Power Reactors, Deccanissioning and Environmental Project Directorate Division of Advanced Reactors end Special Projects-Office of Nucle 4r Reactor Regulation cc: See next page s
e
>r p
Texas A&M University Docket No. 50-128 1
cc:- Mayor, City of College Station Post Office Box Drewer 9960 College Station, Texas 77840-3575 Governor's Budget and Planning Office Post Offfice Box 13561 Austin, Texas 78711 Bureau of Radiation Control State of Texas 1100 West 49th Street Austin, Texas 78756 Dr. Donald Feltz Director, Nuclear Science Center Texos A&M University F. E. Box-89 College Station, Texas 77843-3575 i
__