Docket No, 50-508 February 28, 1991 Mr. D. W. Mazur, Managing Director Washington Public Power Supply System l
P. O. Box 968 3000 George Washington Way Richlend Washington 99352 4
Dear Mr. Mazur:
SUBJECT:
NRC REVICW 0F THE S0ll-STRUCTURE INTERACTION (SSI)
ANALYSIS.0ECONVOLUTION ISSUE FOR WNP-3 The Nuclear Regulatory Commission staff har. completed its review of the soil-structure interaction rnethods for the Washington Nuclear Project No. 3
)
(WNP-3) as documented in the enclosed Draft Safety Evaluation.
The issue of deconvolution of ground motion in rock was originally raised in an audit of the Washington Public Power Supply System's seismic design calculations in 1983.
Based on review of information provided by the Supply System, the staff has concluded that the new methodology using the state-of-the-art onalytical i
technique for resolving the deconvolution issue is acceptable.
However, the staff has some concerns on the specific application of the new methodology to WNP-3 that need to be addressed prior to the issuance of an operating license.
I understand that the Supply System had agreed to such an audit in 1989, but it has not yet been conducted.
This issue has been discussed with Richard L;torre of your staff and I understand that the Supply System may continue to pursue these issues with the NRC dependent on your ongoing resource and licensing prioritization evaluellons.
If you have ony questions on this review, please contact me at (301) 492-1128.
Sincerely, Original signed by:
Marvin M. Mendonca, Senior Project Manager Non-Power Reactors, Decommissioning and 9103070075 910228 Environmental Project Directorate PDR ADOCK 05000500 Division of Advanced Reactors A
PDH and Special Projects Office of Nuclear Reactor RegulatiLn
Enclosure:
As stoted pcw/ enclosure:
pee next page DISTRIBUTION N Uocket file MMendonca
'NRC & Local PDRs OGC PDNP r/f EJordan DCrutchfield ACRS(10)
WTravers PDNP Plant file EHylton Region V AAdams RPichumani GBagchi
[MMLTR2DMezur]
@fd (
M
- PREVIOUSLY CONCURRED PDNP:LA*
PDNP:FM*
ESGB:DET*
OGC*
PDNP:D*
DD:DAR*
D : D 'P' EHylton MMendonca:dmj GBagchi CBarth SWeiss WTravers DCr field p~p ;%/8g 2/8/91 2/11/91 2/12/91 2/22 /91 2/ 26/91 2/ g 91
~
/pm%,
f" 4 Ii
'JNITED STATES
~- 1 NUCLEAR REGULATORY COMMISSION 5,k, WASMNOTON, O C. m66 e
,,,,,/
February 28, 1991 Docket No. 50-508 Mr. D. W. Mazur Managing Director Washington Pub 1Ic Power Supply System P. O. Box 968
-3000 George Washington Way Richland, Washington 99352
Dear Mr. Mazur:
SUBJECT:
= NRCREVIEWOFTHES0ll-STRUCTUREINTERACTION(S$1).
ANALYSIS / DECONVOLUTION-lSSUE FOR WNP-3 The Nuclear Regulatory Conmission staff has completed its review of the soil structure interaction methods for the Washington Nuclear Project No.- 3 (WNP-3) as documented in-the enclosed Draf t Safety Evaluation.
The issue of deconyclution of ground motion in rock was origin 611y raised in en audit of the Washington Public Power Supply System's seismic design calculations in 1983.
. Based on review of information provided by the Supply System, the staff has concluded that the rew methodology using the state-of-the-art analytical technique for resolving the deconvolution issue is ccceptable.
However, the staff has some concerns on the specific application of the new methodology to WNP-3 thot need to be addressed prhr to tae issuance of an operating license.
I understand that the Supply Systen had agreed to such an audit in 1989, but it has not yet been ecnducted. This issue has been discussed with Richard Latorre of your staff and I understand that the Supply System may continue to pursue these issu65 with the NRC dependent on your ongoing resource and licensing prioritization evaluetions.
If y0u have any nuestions on this review,_ please contact me at (301) 492-1128.
Sincerely,
~
l vtw W
vt eg Marvin M. tienoonca, Senior Project Manager L
Non-Power Reactors, Deconsnissioning and Er.vironmental Project Directorate Division of Advanced Reactors and Special-Projects Office of Nuclear Reactor Regulation
Enclosure:
As stated cc w/ enclosure:
See next page i
_, _. -. _ - _ _ - _ _..., _,. _ - _ _ _,. _ _ _. _ _ - ~... _ _.. _ _ _ _ _ _. _ _ _.. _ _. _.. -. _,
Mr. D. W. Mazur Vashington Public Power Supply System WPPSS Nuclear Project No. 3
{
(WNP3)DocketNo.50-508 Cc:
Mr. Charles B. Brinkman, Manager Director Washington Nuclear Operations Combustion Engineering, Inc.
12300 Twinbrook Parkway, Suite 330 Rockville, Maryland 20852 Nicholas S. Reynolds Esq.
Winston & Strawn 1400 L Street, N.W.
Washington, D.C.
20005-3502 Mr. G. E. C. Doupe', Chief Counsel Washington Public Power Supply System 3000 George Washington Way Richlend, Washington 99352 Mr. Robert G. Waldo, Chairman Energy facility Site Evaluation Council fiail Stop PY-11 4
Olympia, Washington 98505 Mr. Richard Latorre Regulatory Progrums Washington Public Power Supply Systeni P. O. Box 968 Richland, Washington 99352 Ms. Nina Bell, Executive Director Northwest Environmental Advocate 408 Southwest Second Avenue Portland, Oregon 97204 Mr. G. C. Sorenson, Monager Regulatory Programs Washington Public Power Supply System P. D. Box 968 Richland, Washington 99352 Regionai Administrator, Region V U.S. Nuclear Regulatory Commission 1450 Maria Lane Suite 210 Walnut Creek, Colifornia 94596
-~~~