ML20029B067
Jump to navigation
Jump to search
| ML20029B067 | |
| Person / Time | |
|---|---|
| Site: | Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png |
| Issue date: | 02/28/1991 |
| From: | CONNECTICUT YANKEE ATOMIC POWER CO. |
| To: | |
| Shared Package | |
| ML20029B066 | List: |
| References | |
| NUDOCS 9103050331 | |
| Download: ML20029B067 (1) | |
Text
-.
"+1 TABLE 4.3-1 (Continued) h E QCTOR TRIP SYSTEM INSTRUNENTATION SURVEILLANCE REQUIREMENTS Nx,yme TRIP 33 ANALOG ACTUATING MODES FOR
=
n w
CHANNEL DEVICE WIICH 38 CHANNEL CHANNEL OPERATIONAL OPERATIONAL SURVEILLANCE 88 FUNCTIONAL UNIT CHECK CALIBRATION TEST TEST IS REQUIRED ou
" 15. Reactor Trip System 83 Interlocks oo 53) m8%
a.
Low Power Block, P-7
.H.A.
R R
N.A.
1 3 3 ' 73 b.
Low Flow Permissive, Ib}
6-P-8 N.A.
R R
N.A.
I
'16.. Reactor Trip System N.A.
N.A.-
N.A.
S/U(1,4)*
1, 2, 3*,
4*, 5*'
l Breakers R
~
Y C
E a
3
++ This surveillance does not apply to the plant startups that occucred on September 3, 1996 l
September 25, 1990, and November 14, 1990.
e, I
I l
-