ML20029B014

From kanterella
Jump to navigation Jump to search
Forwards Safety Insp Rept 50-155/91-02 on 910101-0211.No Violations Noted.Unresolved Item Involving 10CFR50.59 Noted
ML20029B014
Person / Time
Site: Big Rock Point File:Consumers Energy icon.png
Issue date: 02/22/1991
From: Beverly Clayton
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Beckman W
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
Shared Package
ML20029B015 List:
References
NUDOCS 9103050243
Download: ML20029B014 (2)


See also: IR 05000155/1991002

Text

_ _ _ . ._

_ _ _ _

.

_ _

._ . _ _

b

v

  • > NIT E D st At ts

i fI'

[ {y

.

m

,

p* Re e

%

4

NUCLE AR HCGULATORY COMMissl0N

f

S

RtGloN ni

l,

'

199 ROOtt.VELT RO AD

[' I

f

'

%

i.

occN ELLYN, n UNOtt 4001

.....

FEB P E31

.

Docket No. 50-155

Consumers Power Company

ATTN: William L. Beckman

Plant Manager

Big Rock Point Nuclear Plant

10269 US 31 North

Charlevoix, MI

49720

r.e r. . . me n :

This refers to the routine safety inspection conducted by Messrs. E. Plettner

of this of fice and R. Stransky of the of fice of Nuclear Reactor Regulation on

January 1,1991, through February 11, 1991, of activities at Big Rock Point

Nuclear Plant authorized by NRC Operating License No. DPR-6 and to the

discussion of our findings with Mr. W. Beckman and others of his staff at

the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

One unresolved item dealing with 10 CFR 50.59 review was identified in

Paragraph 2 of this report.

No violations of NRC requirements were identified during the course of this

inspection. However, poor operation / engineering practices in surveillance

procedures were identified in Paragraph 3 and inconsistent temperature control

in rooms containing safety related equipment was identified in Paragraph 5 of

this report.

in accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC

Public Document Room.

He will gladly discuss any questions you have concerning this inspection.

Sincerely,

Brent Clayton, Chief

Reactor Projects Branch 2

Enclosure:

Inspection Report

No.50-155/91002(0RP)

',

,S,ee At_tached D_is t_ribu_ti_on

_ 3

i

-

,

l

>

(

t.

-

7103050243 91022D

PMi

ADOCK 0000015S

O

PDR

- _ _ .

.

- .

.

--

-

-

.-

.

. _ _

.

FEB 2 01!91

l

Consurners Power Cornpany

P

l

l

_ _ _ _D i s t.r.i.b..u t i_o.n

cc w/ enclosure-

1

David P. Hof finan, Vice President -

Nuclear Operations

DCD/DCB(RIDS)

OC/LfDCB

Resident In;pector, Rlll

Jarnes R. Padgett, Michigan Public

Service Commission

Michigan Department of

ublic Health

Big Rock Point, LPM, NRR

l

,

I