ML20029A077
| ML20029A077 | |
| Person / Time | |
|---|---|
| Issue date: | 01/29/1991 |
| From: | Baker E Office of Nuclear Reactor Regulation |
| To: | Nightingale T VOYTEN ELECTRIC & ELECTRONICS |
| Shared Package | |
| ML20029A078 | List: |
| References | |
| REF-QA-99901131 NUDOCS 9102040027 | |
| Download: ML20029A077 (2) | |
Text
.
DS CoCE h
'o UNITED STATES
'~
},
NUCLEAR REGULATORY COMMISSION gg w.
.g
' t WASHINGTON, D. C. 70555
(..*/
- N 2 91991 I
Docket No. 99901131/88-01 i
Mr. T. Nightingale, President Voyten Electric and Electronics Post Office Box 361
- Franklin, Pennsylvania 16323
Dear Mr. Nightingale:
i This letter address the inspection of your facility at Franklin, Pennsylvania, conducted by Mr. J. B. Jacobson of this office on October 31, 1988, and the discussions of his findings with you at the conclusion of the inspection.
Release of this report was delayed due to the NRC's ongoing review of nonconforming and substandard vendor products.
This inspection was -conducted to review activities relative to your supply of electrical equipment to the nuclear industry and whether this equipment was properly represented.
This inspection consisted of an examination of procedures and representative records, interviews with personnel, and observations by the inspector.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter and the enclosed inspection report will be placed in the NRC's Public Document Room.
Should-you have any questions concerning this inspection, we will be pleased
.to_ discuss them with you.
l Sincerely, Edward T. Baker, Acting Chief Vendor Inspection-Branch Division of Reactor Inspection and Safeguards Office of Nuclear. Reactor Regulation
Enclosure:
Inspection: Report 99901131/88-01 l
l l
9102040027 910129 PDR GA999 EMV*****
99901131 PDR
_ =
I MN 2 91991 IDocketNo.- 99901131/88 01 Mr. T. Nightingale, President Voyten Electric and Electronics Post Office Box 361 Franklin, Pennsylvania 16323
Dear Mr. Nightingale:
This letter address the inspection of your facility at Franklin, Pennsylvania, conducted by Mr. J. B. Jacobson of this office on October 31, 1988, and the discussions of his findings with you at the conclusion of the inspection.
t Release of this-report was delayed due to the NRC's ongoing review of nonconforming and substondard vendor products.
This inspection was' conducted to review activities relative to your supply of electrical equipment to the nuclear industry and whether this equipment was properly represented. This inspection consisted of an examination of procedures and representative records, interviews with personnel, and observations by the. inspector.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter and the enclosed inspection report will be placed in the NRC's Public Document Room.
Should you have any questions concerning this inspection, we will be pleased to discuss them with you.
Sincerely, Ed T._ Baker, Acting Chief Vendor Inspection Branch Division of. Reactor Inspection and Safeguards Office of Nuclear Reactor Regulation
Enclosure:
Inspect 1ori Report 99901131/88 01 DISTRIBUT10k RIDS CODE-IE:09_
VIB/DRIS R/F BGrimes EBaker WMcNulty, 01:RV
_CVanDenburgh
-JJacobson UPotapovs.
BHayes, 01
/
OFC-
- VIB:DRIS
- VIB:DRIS
- VIB:DRIS
- VIB:DRIS :VIB:DRIS
- VI :J IS:D
.. 7 p....................
-NAME
- JJacobson*
- UPotapovs*
- EWBrach*
- K
- CVan b
- Baker :
.....:..............:......uf...1 s
-DATE ' :12/29/88-
- 12/30/88
- 12/30/88 ;1hA, /91
- 1/1A/91
- 154/91: 1/tf/91 0FFICIAL RECORD COPY-Document Name:
V0TYEN ELECTRIC H
i
,