NPDES Noncompliance Notification:On 900913,sewage Treatment Plant Sample Exceeded Limit for Settleable Solids.Change to Timing of Digester Decanting Implemented to Prevent Future Plant Overload During High Flow Conditions
ML20028H279
Person / Time
Site: San Onofre 
Issue date: 11/13/1990
From: Nandy F
SOUTHERN CALIFORNIA EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9011190349
Download: ML20028H279 (3)


Text

_

.9 a

_f**D?

Southern California Edison Company P3 PARKEH STRE ET IRvlNE. C ALWOHNIA 927(8 November 13, 1990

,,n n,yn, M A64AOt M. NtK4 8, A,4 LICf NttNG 6 7144 bil F b4 M U. S. Nuclear Regulatory Commission Attention:

Document Control Desk Washington, D.C. 2055S c

Gentlemen:

Subject:

Docket No. S0-206 Report of NPDES Permit Violation, September 1990 San Onofre Nuclear Generating Station, Unit 1

Reference:

Letter from H. W. Newton (SCE) to A. L. Coe (California Regional Water Quality Control Board, San Diego Region),

  • NPDES Monitoring Report" fot Unit 1, dated October 30,1990 Technical Specification 6.16.2.c, Provisional Operating License DPR 13, requires Southern Califomia Edison (SCE) to report violations of the National Pollutant Discharge Elimination System (NPDES) permit. This transmittal reports an NPDES permit parameter that was exceeded at Unit 1.

There are nine Unit 1 sampling locations for different parameters required by the Unit 1 NPDES r

pennit, in two of the nine locations, the samples include analyzing for settleable solids. The referenced letter indicated on September 13 the Unit 1 sewage treatment plant sample, which is one of the two sampling locations for settleable solids, exceeded the NPDES permit DAILY limit for settleable solids.

This sample indicated 9.0 ml/l setticable solids, which was 6.0 ml/l greater than the NPDES permit daily limit of 3.0 ml/1. The other location sampled for settleable solids met the NPDES permit DAILY limit. All the nine Unit 1 locations sampled in September for other parameters required by the NPDES pennit were found to be within limits.

There were no Unit 2 or Unit 3 NPDES violations in September 1990, if you require any additional information, please let me know.

Very truly yours, J.

l Enclosure m

ec:

J. B, Martin (Regional Administrator, NRC Region V)

C. W. Caldwell (NRC Senior Resident inspector, Units 1,2 and 3)

J. E. Tatum (NRR SONGS Project Manager) lNI klp\\ -

9011190349 901113 PDR ADOCh 05000206 fl S

PDC

\\

t

s l

Southern California Edison Company 65 S AN ONOFRE NUC LE AR GENER ATING St &%lON P.O. DOR 188 S AN CLEMENT E C ALIFORNia $3S?2 October 30, 1990

'Mr. Arthur L. Coe California Regional Water Quality Control Board San Diego Region 9771 Clairemont Mesa Boulevard, Suite B San Diego, California 92124-1331 Dear Mr. Coet

Subject:

HPDES Monitoring Report San Onofre Nuclear Generating Station, Unit 1 The NPDES monitoring report for 8an Onofre Unit 1 covering the month of September is submitted in accordance with the requirements of CRWQCB Order 88-001 (NPDES Permit No. CA0001228).

'A summary of the generating unit's status and significant analytical results is provided below.

The unit continued its shutdown for refueling and maintenance.

All sampled water sources were found to be within permit limits, with the following exception.

The Unit i sewage treatment plant, was high on-settleable solids September 13 while decanting the digester.

A change to the timing of digester decanting has been

' implemented to prevent future plant overload during high flow conditions.

Pursuant to Order No.88-001, Reporting Requirement 12, the following representative is authorized to sign and certify all r,'norts required by this ordert Arthur Kneisel, Environmental Er.,ineer.

r

/

e i

Mr. Arthur L. Coe October 30, 1990 I certify under penalty of law that I have personally examined and am familiar with the information submitted in the attached document, and based on my inquiry of those individuals immediately responsible for obtaining the information, I believe the submitted information is true, accurate, and complete.

I am aware that there are significant penalties for submitting false informatioli, including the possibility of fine and imprisonment.

Sincere f

yNewton 1.' W.

Manager, Site Support Services Enclosure cct Environmental Protection Agency, Region IX i

..