Monthly Operating Repts for Jan 1983
ML20028G629
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 02/04/1983
From: Fay C
WISCONSIN ELECTRIC POWER CO.
To:
Shared Package
ML20028G626 List:
References
NUDOCS 8302170155
Download: ML20028G629 (8)


Text

__ -

21HD -

E8 80

@$! OPERATING DATA REPORT Eg; DOCKET NO. 50-266 O

$]

00 DATE February 4, 1983 720$ COMPLETED BY C. W. FAY co a 2 0-TELEPHONE 414 277 2811 OPERATING STATUS

1. UNIT NAME: POINT BEACH NUCLEAR PLANT UNIT 1 . NOTES .
2. REPORTING PERIOD: JANUARY 1983 . .
3. LICENSED THERMAL POWER 8MUT): 1518. . .
4. NAMEPLATE RATING (GROSS MWE): 523.8 . .
5. DESIGN ELECTRICAL RATING (NET MWE): 497. . .
6. MAXIMUM DEPENDABLE CAPACITY (GROSS hWE): 519. . .
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 495. . .......................
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 ThROUGH 7) SIhCE LAST REPORT, GIVE REASONS:

NOT APPLICABLE

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET dWE): 390.0
10. REASONS FOR RESTRICTIONS, (IF ANY): Power level restricted because of self-imposed hot leg temperature limitation in an attempt to limit steam generator tube corrosion.

THIS MONT4 YR TO DATE CUMULATIVE

11. HOURS IN REPORTINb PERIOD 744 744 107,280
12. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 744.0 88,316.3
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 624.0
14. HOURS GENERATOR ON LINE 744.0 744.0 85,852.3
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 793.5
16. GROS 5 THERMAL ENERGY GENERATED (MWH) 869,385 869,385 116,818,374
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 288,790 288,790 39,164,580
18. NET ELECTRICAL ENERGY GENERATED (MUH) 274,058 274,068 37,255,786
19. UNIT SERVICE FACTOR 100.0 100.0 89.0
20. UNIT AVAILABILITY FACTOR 100.0 100.0 80.8
21. UNIT CAPACITY FACTOR (USING MDC NET) 74.4 74.4 71.1
22. UNIT CAPACITY FACTOR (USING DER NET) 74.1 74.1 69.9
23. UNIT FORCED DU! AGE RATE 0.0 0.0 2.8
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

NONE

25. IF SHUTDOWN Ai END OF REPORT PERIOD, ESTINATED DATE OF STARTUP: NOT EHUTDOWN DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEMBER 22, 1977

k o

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-266 UNIT NAME Point Beach Unit 1 REPORT MONTH January, 1983 COMPLETED BY C. W. Fav TELEPHONE 414/277-2811 1 - _

u d W tn o 4

~

e 32 au "ao BR can om V. in ce No. Date g gg g jjy Licensee Event gg g'g Cause and Corrective Action e :s :c o u .c Report No. u) eo To Prevent Recurrence i

Q~ N ymj g 8

I 3

. F: Forced Reason: Method: Exhibit G-Instruc-S: Scheduled A- Equipment Failure (explain) 1- Manual tions for Prepar-B- Maintenance or Test 2- Manual Scram ation of Data Entry j C- Refueling 3- Automatic Scram Sheets for LER Filei D- Regulatory Restriction 4- Other (explain) (NUREG-0161)

E- Operator Training & License Exam F- Administrative 5 Exhibit I- Same An-28B G- Operational Error (explain) Source (01-78) H- Other (explain)

_ . _ . _ _ . ~ . . _ . _ . _ _. -_ _ _. . _ . .

DOCKET NO. 50-266 UNIT NAME Point Beach Unit 1 -

DATE February 4, 1983 COMPLETED BY C. W. Fay TELEPHONE 414/277-2811 AVERAGE DAILY UNIT POWER LEVEL MONTH January, 1983 i

AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY POWER LEVEL POWER LEVEL POWER LEVEL DAY MWe NET DAY MWe NET DAY MWe NET 1

4 1 373 11 363 21 371 i

) 2 372 12 372 22 373 1

3 372 13 372 23 348 4 371 14 371 24 372 i

! 5 372 15 353 25 372 l 6 371 16 346 26 372 7 371 17 371 27 367 J

r

, 8 364 18 373- 28 360 9 370 _

19 371 29 372 t

i 10 369 20 371 30 372 31 372 l 1

i AD-28A

(1-77)

s NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE Docket No.: 50-266 Unit Name: Point Beach Unit 1 Date: February 4, 1983 Completed By: C. W. Fay Telephone: 414-277-2811 Unit 1 operated at approximately 370 MWe throughout the entire reporting period with no major load reductions.

On January 4, 1983 at 1530 hours0.0177 days <br />0.425 hours <br />0.00253 weeks <br />5.82165e-4 months <br />, the D-400 fire protection panel was found out of service. Upon discovery, hourly surveillance of the affected areas was begun according to Technical Specifications. This event is under evaluation, however, a 30-day Licensee Event Report will be filed with the NRC.

On January 23, 1983 at 0930 hours0.0108 days <br />0.258 hours <br />0.00154 weeks <br />3.53865e-4 months <br />, the control room received a " control rod system non-urgent failure" alarm on Unit 1 while Reactor Engineering was connecting a visicorder to the 1BD power cabinet to verify rod versus bank counter rod positions.

After attempts to reset the alarm on the logic cabinet failed, control bank "D" was put in motion. Immediately, a " control rod system urgent failure" alarm was received, however, there was no motion indicated on control bank "D". Upon investigation, I&C found and replaced a 50 amp blown fuse on the main power supply to the logic cabinets. The urgent and the non-urgent alarms cleared and control bank "D" rod motion was verified. Reactor Engineering then verified control bank "D" rod position versus the bank counter with all four rods within one step. This event was not considered reportable.

Construction work for IE Bulletin 79-14, Seismic Restraint Fabrication, was essentially completed during the period.

The primary-to-secondary leakage remains stable at less than ten gallons per day.

No other safety-related maintenance was performed in conjunction with the operation of Unit 1.

l l

i l

L

. a OPERATING DATA REPORT DOCKET NO. 50-301 DATE February 4, 1983 COMPLETED BY C. W. F Af TELEPHONE 414 277 2811 OPERATING STATUS

1. UNIT NAME: POINT 'EACH NUCLEAR PLANT UNIT 2 . NOTES .
2. REPORTING PERIOD: JANUARY 1983 . .
3. LICENSED THERMAL i JER (MWT): 1518. . .
4. NAMEPLATE RATIdG 10SS MWE): 523.8 . .
5. DESIGN ELECTRICAL RATING (NET MWE): 497. . .
6. MAXItUM DEPENDABfE CAPACITY (GROSS MWE): 519. . .
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 495. ........................
8. IF CHANGES DCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:

NOT APPLICA5LE

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE): NOT APPLICABLE
10. REASONS FOR RESTRICTIONS, (IF ANY): NOT APPLICABLE THIS MONTH YR TO DATE CUMULATIVE
11. HOURS IN REPORTING PERIOD 744 744 92,065
12. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 744.0 82,802.1
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 196.8
14. HOURS GENERATOR ON LINE 744.0 744.0 81,399.2
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 181.2
16. GROSS THERMAL ENERGY GENERATED (MWH) 1,121,499 1,121.499 112,637,093
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 375,260 375,260 38,176,660
18. NET ELECTRICAL ENERGY GENERATED (MWH) 359,399 359,399 36,348,366
19. UNIT SERVICE FACTOR 100.0 100.0 88.4
20. UNIT AVAILABILITY FACTOR 100.0 100.0 88.6
21. UNIT CAPACITY FACTOR (USING MDC NET) 97.6 97.6 80.3
22. UNIT CAPACITY FACTOR (USING DER NET) 97.2 97.2 79.4
23. UNIT FORCED OUTAGE RATE 0.0 0.0 1.5
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

Fourteen-week refueling and steam generator sleeving outage scheduled to begin March 25, 1983.

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: NOT SHUTDOWN DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEMBER 22, 1977

!: 4ij ijil ii !l1tli!!i l14ji1i 14i iil i:j  ;, ilI 1, l t 4

( A 0D 1- N 2 _

78 8B

o. _

)

1 D

SF a

: t e

SF co hr ec e-de ege ud l

e d ,-

Q:s ao4oc

~c:gu m -

HGFEDCBAR N

%egoc

- e a .

OOAORRMEs .

tp dp e e a q o :evjc 2 OW U h e 2 e g fiu n R N _

e r ir u u n i: U.

3cgo4cP ,- t E I ranaletp -

M P T .

titalem b>C gmovok O -

( isotine R S eotronan T H xnr rgnt c

L U p a a Ty i M T lltr eF c O D _

a iaR a Re N O iEvie oi en T W nrans

) r it rl u

ps oe H N S

o nr Tr re r gi ee t A c s E N

( &t t( Nv J D e i e oe a x

p Lo x p

.n n u

P -

in t O .

l c l a W a e a r y

E i n i u R n s n ,

) e )

)yoeEme* 1 R

E E 9 D x 8 U -

a 3 C m Uoegcec4 T I

og'e n O 3 N S

4321M .

e .

t C OAMMh a _

tuaao Tu .

htnnd os eouu: e rmaaall P

ra C

( t en TO .

eiS vd EM D xcc p

e LP UO _

r nC EL NC _

lSa to PE IK _

acm ir Rr r HT OE TE T

na ee NDDN _

) m cc E AAN _

ut BTMO _

5

  • ri YEE. -

rv ee 4cFP5 SE ( Sate .

ox Nhtix n 1 4

n o 0 b i uh Ueioh cA r n 3 ri Reoni ec /

2 w

. u t 0 cb Etnsb t 7 a _

ai Gs i i 7 F r B 1 .

t - oft o Av e 0ffo n 2 v a I 1o rG R c

- 6rD - 4 h

1 API 1 1

S ) Ltrn U t

a Eaes 1 9 n m R pt .

e Ear 9 i 3t Fnru it c 2 lr -

ey _

y DOCKET NO. 50-301 _

UNIT NAME Point Beach Unit 2 DATE February 4, 1983 COMPLETED BY C. W. Fay _

TELEPHONE 414/277-2811 AVERAGE DAILY UNIT POWER LEVEL MONTH January, 1983 AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY POWER LEVEL POWER. LEVEL POWER LEVEL DAY MWe NET DAY MWe NET DAY MWe NET 1 487 11 486 21 486 2 485 12 484 22 486 3 486 13 486 23 442-4 487 14 485 24 468 5 487 15 485 25 485 6 486 16 487 26 486 7 487 17 469 27 484 8 485 18 484 28 486 9 485 19 483 29 486 10 486 2A 485 30 485 31 487 AD-28A (1-77)

NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE Docket No.: 50-301 Unit Name: Point Beach Unit 2 Date: February 4, 1983 Completed By: C. W. Fay Telephone: 414/277-2811 Unit 2 operated at approximately 487 MWe net throughout the entire reporting period with no major load reductions.

The primary-to-secondary leakage remains stable at less than 10 gallons per day.

No safety-related maintenance was performed in conjunction with the operation of Unit 2.