_ _ - _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _
Malling Address
. At: trm?, Power Company 600 North 18th Str9et Post Offica Box 2641 Birmingh::m, Allbama 35291
. Telephone 205 783-6081 F. L Clayton, Jr.
V Sglo7'0*sd*"'
i g AlabamaPower the Southern elecinC System February 1,1983 1
l Docket Nos. 50-348 l 50-364 Director of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Attention: Mr. S. A. Varga Joseph M. Farley Nuclear Plant - Units 1 & 2 Licensing Items Requiring NRC Approval in 1983 Gentlemen:
Attached for your information is a status of all licensing items identified in Alabama Power Company's letter dated January 13, 1983. This status will be provided on a monthly basis and will be updated to include any additional submittals requiring NRC approval.
If you have any questions, please advise.
Yours very truly, ,
f' '
j F. L. Clayton, Jr.
FLCJr/ JAR:lsh-DJAR/2 Attachment cc: Mr. R. A. Thomas Mr. G. F. Trowbridge Mr. J. P. O'Reilly Mr. E. A. Reeves Mr. W. H. Bradford 8302090329 830201 PDR ADOCK 05000348 P PDR
_ _ _ _ _ _ _ _ _ __________ _ ____________.__ ________ _________ _________ ____ ________ __ _______ _______ i
ATTACHMENT STATUS OF LICENSING ITEMS REQUIRING NRC APPROVAL IN 1983 Proposed APCo Actual APCo Requested NRC Actual NRC Item Submittal Date Submittal Date Approval Date Approval Date
- 1. Movable Control Rod Assemblies 02-22-83 09-01-83 for FNP 1 and 2 (T.S. 3/4.1.3)
- 2. Charcoal Filters for FNP 1 and 2 03-01-83 09-01-83 (T.S. 4.7.7, 4.7.8 and 4.9.14)
- 3. River Water System for FNP 1 and 2 N/A 12-30-82 07-01-83 (T.S. 3/4.7.5)
- 4. Diesel Generator Overload Test for N/A 08-03-82 07-01-83 FNP 1 and 2 (T.S. 4.8.1.1.2.c.5) 12-30-82
- 5. BIT Reduction for FNP 1 and 2 N/A 12-30-82 03-31-83 (T.S.3/4.5.4)
- 6. Turbine Valve Surveillance for FNP 2 N/A 10-08-82 12-01-82 OVERDUE (T.S.3/4.3.4) 12-10-82 01-18-83
- 7. RCS Pressure Isolation Valves N/A 08-10-82 07-01-83 for FNP 1 and 2 (T.S. 3/4.4.7.2 12-23-82 and 3/4.4.7.3)
- 8. Mechanical Snubber Functional Test N/A 11-05-82 12-01-82 OVERDUE Exemption for FNP 1 (T.S. 4.7.9.e)
- 9. Waste Gas Hydrogen /0xygen Analyzer 06-01-83 12-01-83 for FNP 1 and 2 (T.S. Table 4.3-9) 10 ISI/IST Licensing Program
- a. Unit 1 Inservice Inspection (ISI)
Program for ASME Code Class 1, 2 and 3 Components
- 1. Relief Requests on vessel N/A 04-17-81 09-01-83 cladding examinations. 01-10-83
_w
k ATTACHMENT STATUS OF LICENSING ITEMS REQUIRING NRC APPROVAL IN 1983 Proposed APCo Actual APCo Requested NRC Actual NRC Item Submittal Date Submittal Date Approval Date Approval Date 10 ISI/IST Licensing Program (cont.)
- 2. Relief Requests on hydrostatic 01-18-83 01-28-83 09-01-83 test requirements.
- b. ' nit 2 Inservice Inspection (ISI)
Program for ASME Code Class 1, 2 and 3 Components
- 1. Revision 0 Relief Requests N/A 07-25-80 09-01-83
- 2. Relief Requests on vessel cladding N/A 01-10-83 09-01-83 examinations.
- 3. Relief Request on hydrostatic 01-18-83 01-28-83 09-01-83 test requirements.
- c. Unit 1 Inservice Testing (IST)
Program for ASME Code Class 1, 2 and 3 Components
- 1. Revision 2 Relief Requests N/A 04-21-80 03-15-83
- 2. Revision 3 Relief Requests N/A 07-16-81 03-15-83
- 3. Revision 4 Relief Requests N/A 10-25-82 03-15-83
- d. Unit 2 Inservice Testing (IST)
Program for ASME Code Class 1, 2 and 3 Components
- 1. Revision 0 Relief Requests N/A 03-12-80 02-15-83
- 2. Revision 1. Relief Requests N/A 03-17-82 02-15-83
- 3. Revision 2 Relief Requests N/A 08-06-82 02-15-83
ATTACHMENT STATUS OF LICENSING ITEMS REQUIRING NRC APPROVAL IN 1983 Proposed APCo Actual APCo Requested NRC Actual NRC Item Submittal Date Submittal Date Approval Date Approval Date
- 11. Spent Fuel Pool Storage Additiors N/A 03-19-82 11-01 for FNP 1 03-01-82 (revised need date)
- 12. Change 18 Month Interval to Refueling 04-01-83 10-01-83
- 13. Meteorological Tower Surveillance for 02-01-83 01-24-83 08-01-83 FNP 1 and 2 (T.S. 3.38 and 4.35)
- 14. In-Core Thimbles for FNP 1 and 2 03-01-83 (T.S. 3.3.3.2) (Advise NRC)
- 15. Safety Evaluations for Next Fuel Reloads:
- a. Ilnit 1 Upflow Modification N/A 08-16-82 N/A N/A
- b. Unit 1 Cycle 5 03-14-83 N/A N/A
- c. Unit 2 Cycle 3 18 Month Fuel 09-01-83 N/A N/A Cycle
- 16. FAH and Positive Moderator Temperature 03-01-83 Coefficient (Advise NRC)
- 17. Containment Spray 04-01-83 10-01-83
- 18. Technical Specification Optimization N/A N/A N/A N/A Westinghouse Owners Group
- 19. Safety Related Battery Changes 04-15-83 10-15-83
- 20. Rod Swap Test During Low Power 03-01-83 04-01-83 Physics Testing (Interim approval only) l
- 21. Rod Drop Timing During Low Power 03-01-83 Physics Testing (AdviseNRC) 1
ATTACHMENT STATUS OF LICENSING ITEMS REQUIRING NRC APPROVAL IN 1983 Proposed APCo Actual APCo Requested NRC Actual NRC Item Submittal Date Submittal Date Approval Date Approval Date
- 22. Auto Rod Control Above 90% Power N/A 01-11-83 (U-1) 04-01-83 OVERDUE for Unit 2, Cycle 2 and Unit 1, 09-14-82 (U-2) 12-01-82 (Unit 2 only)
Cycle 5
- 23. Unit 2 Licensing Deletion Amendment 01-12-83 01-07-83 N/A N/A Clarification Letter
- 24. FSAR Update 07-01-83 .N/A N/A
- 25. Administrative Changes
- a. Accumulator and ECCS Subsystem 02-01-83 02-01-83 09-01-83 for FNP 1 and 2 (T.S. 4.5.1.1.
(c) and 4.5.2.(a))
- b. Generic Letter 82-17 on Audit of N/A 10-25-82 09-01-83 Emergency Plan for FNP 1 and 2 (T.S. 6.5.2.8.e)
- c. Mechanical and Hydraulic Snubber Lists 06-01-83 09-01-83 for FNP 1 and Hydraulic Snubber List for FNP 2 (T.S. Table 3.7-4b)
- d. Administrative Changes for FNP 1 and 2:
- 1) Fire Detectors Table 3.3-12 03-01-83 02-01-83 09-01-83
- 2) RHR Isolation 4.5.2.d.1
- 3) River Water Sury 3/4.7.5*
- 4) Yard Fire Hydrant Table 3.7-7
- 5) Service Water Battery 4.8.2.5.2(d)
- 6) Organization Chart Figure 6.2-2
- N/A per item 3 submittal
- e. Unit 2 Pressurizer Sensor Table 03-01-83 02-01-83 09-01-83 (T.S. 3.3.3.7)
- f. Unit 1 Refueling Outage Change: 03-01-83 02-01-83 09-01-83 Containment Vent
ATTACHMENT STATUS OF LICENSING ITEMS REQUIRING NRC APPROVAL IN 1983 i Proposed APCo Actual APCo Requested NRC Actual NRC Item Submittal Date Submittal Date Approval Date Approval Date i
- 25. Administrative Changes (cont.)
9 Turbine Building Hydraulic Snubbers N/A 12-10-82 09-01-83 for FNP 2
- h. Incorporation of Licensing Requirements N/A 11-24-82 09-01-83 for FNP 2
- 1) FNP 2 License rondition 2.C.(17)
- Containment Vent Line l 2) Mechanical Snubber List for FNP 2 (T.S. Iable 3.7-4b)
- 3) FNP 2 License Condition 2.C.(19)(b)
- Containment Overcurrent Protection
- i. Organ;zation Change to Offsite N/A 11-16-82 09-01-83 Management for FNP 1 and 2.
OTHER LICENSING SUBMITTALS i
! 1. Administrative Changes N/A 02-01-83 09-01-83
- a. Engineered Safety Actuation System Instrumentation ACTION Statement 20 Error
- b. Security Plan Audit Frequency i .-
- c. Environmental Qualification (FNP 1)
! d. Augmented Low Power Test Program
. . (FNP 2) ,