Forwards List of All Licensing Items Requiring NRC Approval in 1983.Status Will Be Updated Monthly to Reflect Addl Submittals Requiring NRC Approval
ML20028G423
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 02/01/1983
From: Clayton F
ALABAMA POWER CO.
To: Varga S
Office of Nuclear Reactor Regulation
References
NUDOCS 8302090329
Download: ML20028G423 (6)


Text

_ _ - _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _

Malling Address

. At: trm?, Power Company 600 North 18th Str9et Post Offica Box 2641 Birmingh::m, Allbama 35291

. Telephone 205 783-6081 F. L Clayton, Jr.

V Sglo7'0*sd*"'

i g AlabamaPower the Southern elecinC System February 1,1983 1

l Docket Nos. 50-348 l 50-364 Director of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Attention: Mr. S. A. Varga Joseph M. Farley Nuclear Plant - Units 1 & 2 Licensing Items Requiring NRC Approval in 1983 Gentlemen:

Attached for your information is a status of all licensing items identified in Alabama Power Company's letter dated January 13, 1983. This status will be provided on a monthly basis and will be updated to include any additional submittals requiring NRC approval.

If you have any questions, please advise.

Yours very truly, ,

f' '

j F. L. Clayton, Jr.

FLCJr/ JAR:lsh-DJAR/2 Attachment cc: Mr. R. A. Thomas Mr. G. F. Trowbridge Mr. J. P. O'Reilly Mr. E. A. Reeves Mr. W. H. Bradford 8302090329 830201 PDR ADOCK 05000348 P PDR

_ _ _ _ _ _ _ _ _ __________ _ ____________.__ ________ _________ _________ ____ ________ __ _______ _______ i

ATTACHMENT STATUS OF LICENSING ITEMS REQUIRING NRC APPROVAL IN 1983 Proposed APCo Actual APCo Requested NRC Actual NRC Item Submittal Date Submittal Date Approval Date Approval Date

1. Movable Control Rod Assemblies 02-22-83 09-01-83 for FNP 1 and 2 (T.S. 3/4.1.3)
2. Charcoal Filters for FNP 1 and 2 03-01-83 09-01-83 (T.S. 4.7.7, 4.7.8 and 4.9.14)
3. River Water System for FNP 1 and 2 N/A 12-30-82 07-01-83 (T.S. 3/4.7.5)
4. Diesel Generator Overload Test for N/A 08-03-82 07-01-83 FNP 1 and 2 (T.S. 4.8.1.1.2.c.5) 12-30-82
5. BIT Reduction for FNP 1 and 2 N/A 12-30-82 03-31-83 (T.S.3/4.5.4)
6. Turbine Valve Surveillance for FNP 2 N/A 10-08-82 12-01-82 OVERDUE (T.S.3/4.3.4) 12-10-82 01-18-83
7. RCS Pressure Isolation Valves N/A 08-10-82 07-01-83 for FNP 1 and 2 (T.S. 3/4.4.7.2 12-23-82 and 3/4.4.7.3)
8. Mechanical Snubber Functional Test N/A 11-05-82 12-01-82 OVERDUE Exemption for FNP 1 (T.S. 4.7.9.e)
9. Waste Gas Hydrogen /0xygen Analyzer 06-01-83 12-01-83 for FNP 1 and 2 (T.S. Table 4.3-9) 10 ISI/IST Licensing Program
a. Unit 1 Inservice Inspection (ISI)

Program for ASME Code Class 1, 2 and 3 Components

1. Relief Requests on vessel N/A 04-17-81 09-01-83 cladding examinations. 01-10-83

_w

k ATTACHMENT STATUS OF LICENSING ITEMS REQUIRING NRC APPROVAL IN 1983 Proposed APCo Actual APCo Requested NRC Actual NRC Item Submittal Date Submittal Date Approval Date Approval Date 10 ISI/IST Licensing Program (cont.)

2. Relief Requests on hydrostatic 01-18-83 01-28-83 09-01-83 test requirements.
b. ' nit 2 Inservice Inspection (ISI)

Program for ASME Code Class 1, 2 and 3 Components

1. Revision 0 Relief Requests N/A 07-25-80 09-01-83
2. Relief Requests on vessel cladding N/A 01-10-83 09-01-83 examinations.
3. Relief Request on hydrostatic 01-18-83 01-28-83 09-01-83 test requirements.
c. Unit 1 Inservice Testing (IST)

Program for ASME Code Class 1, 2 and 3 Components

1. Revision 2 Relief Requests N/A 04-21-80 03-15-83
2. Revision 3 Relief Requests N/A 07-16-81 03-15-83
3. Revision 4 Relief Requests N/A 10-25-82 03-15-83
d. Unit 2 Inservice Testing (IST)

Program for ASME Code Class 1, 2 and 3 Components

1. Revision 0 Relief Requests N/A 03-12-80 02-15-83
2. Revision 1. Relief Requests N/A 03-17-82 02-15-83
3. Revision 2 Relief Requests N/A 08-06-82 02-15-83

ATTACHMENT STATUS OF LICENSING ITEMS REQUIRING NRC APPROVAL IN 1983 Proposed APCo Actual APCo Requested NRC Actual NRC Item Submittal Date Submittal Date Approval Date Approval Date

11. Spent Fuel Pool Storage Additiors N/A 03-19-82 11-01 for FNP 1 03-01-82 (revised need date)
12. Change 18 Month Interval to Refueling 04-01-83 10-01-83
13. Meteorological Tower Surveillance for 02-01-83 01-24-83 08-01-83 FNP 1 and 2 (T.S. 3.38 and 4.35)
14. In-Core Thimbles for FNP 1 and 2 03-01-83 (T.S. 3.3.3.2) (Advise NRC)
15. Safety Evaluations for Next Fuel Reloads:
a. Ilnit 1 Upflow Modification N/A 08-16-82 N/A N/A
b. Unit 1 Cycle 5 03-14-83 N/A N/A
c. Unit 2 Cycle 3 18 Month Fuel 09-01-83 N/A N/A Cycle
16. FAH and Positive Moderator Temperature 03-01-83 Coefficient (Advise NRC)
17. Containment Spray 04-01-83 10-01-83
18. Technical Specification Optimization N/A N/A N/A N/A Westinghouse Owners Group
19. Safety Related Battery Changes 04-15-83 10-15-83
20. Rod Swap Test During Low Power 03-01-83 04-01-83 Physics Testing (Interim approval only) l
21. Rod Drop Timing During Low Power 03-01-83 Physics Testing (AdviseNRC) 1

ATTACHMENT STATUS OF LICENSING ITEMS REQUIRING NRC APPROVAL IN 1983 Proposed APCo Actual APCo Requested NRC Actual NRC Item Submittal Date Submittal Date Approval Date Approval Date

22. Auto Rod Control Above 90% Power N/A 01-11-83 (U-1) 04-01-83 OVERDUE for Unit 2, Cycle 2 and Unit 1, 09-14-82 (U-2) 12-01-82 (Unit 2 only)

Cycle 5

23. Unit 2 Licensing Deletion Amendment 01-12-83 01-07-83 N/A N/A Clarification Letter
24. FSAR Update 07-01-83 .N/A N/A
25. Administrative Changes
a. Accumulator and ECCS Subsystem 02-01-83 02-01-83 09-01-83 for FNP 1 and 2 (T.S. 4.5.1.1.

(c) and 4.5.2.(a))

b. Generic Letter 82-17 on Audit of N/A 10-25-82 09-01-83 Emergency Plan for FNP 1 and 2 (T.S. 6.5.2.8.e)
c. Mechanical and Hydraulic Snubber Lists 06-01-83 09-01-83 for FNP 1 and Hydraulic Snubber List for FNP 2 (T.S. Table 3.7-4b)
d. Administrative Changes for FNP 1 and 2:
1) Fire Detectors Table 3.3-12 03-01-83 02-01-83 09-01-83
2) RHR Isolation 4.5.2.d.1
3) River Water Sury 3/4.7.5*
4) Yard Fire Hydrant Table 3.7-7
5) Service Water Battery 4.8.2.5.2(d)
6) Organization Chart Figure 6.2-2
  • N/A per item 3 submittal
e. Unit 2 Pressurizer Sensor Table 03-01-83 02-01-83 09-01-83 (T.S. 3.3.3.7)
f. Unit 1 Refueling Outage Change: 03-01-83 02-01-83 09-01-83 Containment Vent

ATTACHMENT STATUS OF LICENSING ITEMS REQUIRING NRC APPROVAL IN 1983 i Proposed APCo Actual APCo Requested NRC Actual NRC Item Submittal Date Submittal Date Approval Date Approval Date i

25. Administrative Changes (cont.)

9 Turbine Building Hydraulic Snubbers N/A 12-10-82 09-01-83 for FNP 2

h. Incorporation of Licensing Requirements N/A 11-24-82 09-01-83 for FNP 2
1) FNP 2 License rondition 2.C.(17)

- Containment Vent Line l 2) Mechanical Snubber List for FNP 2 (T.S. Iable 3.7-4b)

3) FNP 2 License Condition 2.C.(19)(b)

- Containment Overcurrent Protection

i. Organ;zation Change to Offsite N/A 11-16-82 09-01-83 Management for FNP 1 and 2.

OTHER LICENSING SUBMITTALS i

! 1. Administrative Changes N/A 02-01-83 09-01-83

a. Engineered Safety Actuation System Instrumentation ACTION Statement 20 Error
b. Security Plan Audit Frequency i .-
c. Environmental Qualification (FNP 1)

! d. Augmented Low Power Test Program

. . (FNP 2) ,