t PACIFIC GAS AND ELECTR,IC C O M PANY 77 OEALE STREET, SAN FR ANCISCo C ALIFoRNI A 94106 T E LE PHON E (415) 781 4211 bbW3 I
P. o. BOX 7442, SAN FR ANCISCO, C ALIFORNI A 94120 T E LECOPIE R (415) 543 7813 R O B E R T O H L. B AC H vict entsect=Y ano statnat afiossty C H A R L E S T. V A N D E U S E N d'
d * ***
'"8 C *
- " ' 68 e aeYes No e's =I Non.Uoo I [eom
+IeN PHILIP A. C R A N E. J R.
=
=
aee e n
- 2.*:.h' '.";~*::: e i;":.*T."'*e.e,,
- .*:L'.*.'T,1
- .*:uu'::\\".'
d H E N RY J' Le PL A N TE d "" " ' * ' " * *
'".*i's ?t".*!!
- " f.d."J.'e*:"Je",..
1.",0.* 1%..
^ *F/,!i,"ove?.
A R T HU R L. HILL M A N. J R.
., ce s so seg e
e.
ee aeo L ene.n o ee a se ene s e e, a s s,e e s o =
C H A R L E S W. THISSE L L tou.e s. v.ne e n,
.,e e=e o D A NI E L E. GIB S O N J AC M F. PA L LI N J R.
JOSEPHB. MELLY MOW A R D V. G O L U B GL E N N WE ST JR.
awstaer egeteat c.onstt February 4, 1983 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, DC 20555 Attn:
Document Control Desk Re: Docket No. 50-275, OL-DPR-76 Docket No. 50-323 Diablo Canyon Units 1 and 2 Revision 2 to the Security Force Training and Qualification Plan
Dear Mr. Denton:
Enclosed is Revision 2 to the Diablo Canyon Power Plant Security Force Training and Qualification Plan which is being submitted in accordance with the provisions of 10 CFR 50.54(p).
The revision is necessitated by changes in operating procedures and organizational changes as a result of the further refinement of the security program at Diablo Canyon Power Plant by Pacific Gas and Electric Company. The Plan has been reformatted, a Task Identification Summary has been added, and the Task and Duty Summary has been revised and updated.
Therefore, no change bars on the margin were added. Instead, all changes to the Plan are cross-referenced from the old to the new Plan (and vice-versa) in Attachment A to this letter.
E RITY
- S$r SAFEGUARDSINFORMATION s3o2o9oo14 830204 Il PDR ADOCK 05000275 l
j p
PDR When separated from Enclosures, Handle this Document as Decontrolled
i Mr. Harold R. Denton February 4, 1983 Page 2 A summary of other major changes is as follows:
o An Introduction has been added to the Plan, o
A Glossary of Terms has been added as Appendix A.
o PGandE management and other persons who are not members of the Security Force have hean eliminated from the Task and Duty Summary. The Shift Tcreman's responsibilities described in the Contingency Plan cre those same decisions required by technical specifications and he, therefore, requires no security training and/or certification, The unarmed position of Watchperson has been added to the o
Task and Duty Summary, o
T5e " Weapons Training" section has been clarified to read
" Firearms Training".
o Security assignments have been combined into duty positions for purposes of training.
o Conditions and standards have been rewritten to accurately reflect the revised operational methods at Diablo Canyon.
( All are cross-referenced to the old plan in Attachment A.)
o All tasks which were previously written for the CAS or SAS alone have been combined into one task for CAS/SAS.
Screening described in Section 1.4.2 of the Diablo Canyon o
Power Plant Security Plan has been deleted from that Plan and made a part of this document (Section 1).
This revision in no way decreases the safeguards effectiveness at l
the Diablo Canyon Power Plant. Implementation of this revision will commence
(
60 days from the date of submittal.
SAFEGUARDSINFORMATION When separated from Enclosures, Handle this Document as Decontrolled I
e Mr. Harold R. Denton February 4, 1983 Page 3 The enclosures contain safeguards information which is to be protected against unauthorized disclosure in accordance with 10 CFR 73.21.
Kindly acknowledge receipt of this material on the enclosed copy of this letter and return it in the enclosed addressed envelope.
Very truly yours,
/
w,j Enclosures cc w/ enc:
Mr. R. H. Engelken, Regional Administrator U.S. Nuclear Regulatory Commission, Region V 1450 Maria Lane, Suite 210 Walnut Creek, CA 94596-5368 SAFEMARDSINFORMATiON When separated from Enclosures, Handle this Document as Decontrolled