ML20028G241

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-313/82-39 on 821227-29.No Noncompliance Noted
ML20028G241
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 01/24/1983
From: Seidle W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Cavanaugh W
ARKANSAS POWER & LIGHT CO.
Shared Package
ML20028G242 List:
References
NUDOCS 8302070551
Download: ML20028G241 (2)


See also: IR 05000313/1982039

Text

,

s,

.

5

Docket:

50-313/82-39

. m e 4 1913

.

Arkansas Power and Light Company

ATTN:

Mr. William Cavanaugh III

Senior Vice President - Energy Supply

Post Of fice Box 551

Little Rock Arkansas 72203

Gentlemen:

This refers to the inspection conducted by Mr. D. P. Tomlinson of our staff

during the period December 27-29, 1982, of activities authorized by NRC

Facility Operating License DPR-51 for the Arkansas Nuclear One, Unit 1, and to

the discussion of our findings with Mr. E. C. Ewing of your staff at the

conclusion of the inspection.

Areas examined during the inspection and our findings are documented in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examination of procedures and representative records, interviews

'

with personnel, and observations by the inspector.

Within the scope of the inspection, no violations or deviations were

identified.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure

will be placed in the NRC Public Document Room unless you notify this office,

by telephone, within 10 days of the date of this letter and submit written

application to withhold information contained therein with'n 30 days of the

date of this letter.

Such application must be consister.c with the

requirements of 2.790(b)(1).

!

/

RP8dIf<~

DRRP&k

ES

ES

DPTomlinson:gb DMH nr cutt

WCSeidle

JFGagli rdo

01/15/83

01/18/83

01/18/83

01/18/83'

'

8302070551 830124

PDR ADOCK 05000

G

. . _ .

_

__

__

.

.

.

_

=

.

- -

-

~

s

.

.

6

i

Arkansas Power and Light Company

2

Should you have any questions concerning this inspection, we will be pleased

to discuss them with you.

Sincerely,

t

i

W. C. Seidle, Chief

Reactor Project Branch 2

Enclosure:

-

Appendix - NRC Inspection Report 50-313/82-39

cc w/ enclosure:

Arkansas Nuclear One

ATTN:

J. M. Levine, General Manager

Post Office Box 608

l

Russellville, Arkansas 72801

bcc to DM8:

(IE01)

bec to RIV

Resident Inspector

Section Chief

J. Collins

Info Systems

D. Tomlinson

RPB1

RPB2

TPB

RIV File

Arkansas State Dept. of Health

G. Vissing, NRR

0. Lynch, NRR

!

_

_

_

__

_ _ _ _

__

. _ _ -

__

_ _ _

_ _

,_,

_ _ _ _ _ _ _ _ _ , . . , _ _ . . , , _ - _ _ _ ,

_