ML20028G223

From kanterella
Jump to navigation Jump to search
Notice of Deviation from Insp on 821206-10
ML20028G223
Person / Time
Site: Cooper 
Issue date: 01/18/1983
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
Shared Package
ML20028G217 List:
References
50-298-82-36, NUDOCS 8302070536
Download: ML20028G223 (1)


Text

-

+

APPENDIX B NOTICE OF DEVIATION Nebraska Public Power District

Docket:

50-298/82-36 Cooper Nuclear Station License:

DPR-46 Based on the results of an NRC inspection conducted during th'e period of December 6-10, 1982, and in accordance with NRC Enforcement" Policy-(10 CFR Part 2, Appendix C), 47 FR 9989, dated March 9, 1982,.the,following deviation was identified:

Failure to Conduct Training as Committed The Nebraska Public Power District's letter, serial.LQ8200023,' dated June 1, 1982, stated in paragraph 2 of the enclosure:

"The elements of the CNS Training Program for licensed operators which are pertinent to BWR accident mitigation involving a degraded core address all of the areas identified in enclosure 3 of Denton's March 28, 1980 letter.

Many of the areas are addressed in the abnormal and emergency procedures which all licensed operators are required to review annually.

Formal classroom requalification training in accident mitigation involving a degraded core will include all pertinent areas in enclosure 3 of Denton's March 28, 1980 letter.

In deviation from the above, the requalification examination given to reactor operators and approximately one-half of the senior reactor operators did not address mitigation of core damage.

Review of completed and scheduled requalification training for 1982 did not indicate any formal classroom i

training on mitigation of core damage.

(8236-02)

Nebraska Public Power District is herey requested to submit to this office, within 30 days of the date of this Notice of Deviation, a written statement or explanation in reply, including:

(1) the corrective steps which have been taken and the results achieved; (2) corrective steps which will be taken to avoid further deviation from commitments made to the Connission; and (3) the date when full compliance will be achieved.

Consideration may be given to extending your response time for good cause shown.

Dated:

January 1R. 1983 i

8302070536 830118 PDR ADOCK 05000298 G

PDR L