ML20028G170

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-382/82-29 on 821213-16.No Noncompliance Noted
ML20028G170
Person / Time
Site: Waterford 
Issue date: 01/13/1983
From: Madsen G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Maurin L
LOUISIANA POWER & LIGHT CO.
Shared Package
ML20028G171 List:
References
NUDOCS 8302070481
Download: ML20028G170 (2)


See also: IR 05000382/1982029

Text

_

.

.

.lAN13Yad

Docket:

50-382[82-29

Louisiana Power and Light Company

ATTN:

L. V. Maurin, Vice President

Nuclear Operations

142 Delaronde Street

New Orleans, Louisiana 70174

Gentlemen:

This refers to tiie inspection conducted by Messrs. C. E. Johnson, D. Hunnicutt,

R. Mullikin, and J. Bess of our staff during the period December 13-16, 1982,

of activities authorized by NRC Construction Permit CPPR-103 for the Waterford

Steam Electric Station, Unit 3, and to the discussion of our findings with

Mr. L. Bass and other members of ycur staff at the conclusion of the inspection.

Areas examined during the inspection and our findings are (Hscussed in the

enclosed inspection report. Within these areas, the inspect on consisted of

selective examination of procedures and representative records, interviews

with perconnel, and observations by the inspectors.

We have also examined actions you have taken with regard to previously

identified inspection findings.

The status of these items is identified in

paragraph 2 of the enclosed report.

Within the scope of the inspection, no violations or deviations were

identified.

One new unresolved item is identified in paragraph 4c of the enclosed report.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure

will be placed in the NRC Public Document Room unless you notify this office,

by telephone, within 10 days of the date of this letter, and submit written

application to withhold information contained therein within 30 days of the

date of this letter.

Such application must be consistent with the

requirements of 2.790(b)(1).

/20l

RPBl[DRRP&

RA/S$

ES

ES

f)

RPB2(

RPS-B A

CJohns /dsm

DHu icutt WSeidl

WCrotshen

GMadsen JGagli

d

JCo' lins

l

1/}D/83

1/10/83

1/// /83 1 / 11 / 8 3

1/JI/83

1/ p/ 3 j9/A'/83

k

u

8302070401[hh2

'

'

-

PDR ADOCK

PDR

0

- .-.

-.

- -- -.

-

--..

..

,

-

.

-

-

-

.

e

Louisiana Power and Light

2

Company

,

r

l

Should you have any questions concerning this inspection, we will be pleased

,

to discuss them with you.

Sincerely,

1

l

G. L. Madsen, Chief

Reactor Project Branch 1

Enclosure:

Appendix - NRC Inspection Report 50-382/82-29

.

cc w/ enc 1:

Louisiana Power and Light Company

ATTN:

F. J. Drummond, Project Support Manager

142 Delaronde Street

New Orleans, LA 70174

Mr. T. F. Gerrets, QA Manager

l

(same address)

Louisiana Power and Light Company

ATTN:

R. P. Barkhurst, Plant Manager

P.O. Box B

Killona, LA 70066

bec to DMB (IE01)

bcc distrib. by RIV:

BC

PM

RPB1

Resident Inspector

AEOD

ELD

TPB

Section Chief (ES)

IE FILE

NRR/DHFS/0LB

MIS SYSTEM

C. Johnson

NRR/DSI/RAB

RES

RIV File

R. Mullikin

LPDR

iiRC PDR

RA

J. Bess

NSIC

NTIS

C. Wisner

W. Crossman

LA DIV. OF RAD. CONTROL

,

t

a

_ . _.

- . . .

- _ , _

-.

-.