Text
_
.
.
.lAN13Yad
Docket:
50-382[82-29
Louisiana Power and Light Company
ATTN:
L. V. Maurin, Vice President
Nuclear Operations
142 Delaronde Street
New Orleans, Louisiana 70174
Gentlemen:
This refers to tiie inspection conducted by Messrs. C. E. Johnson, D. Hunnicutt,
R. Mullikin, and J. Bess of our staff during the period December 13-16, 1982,
of activities authorized by NRC Construction Permit CPPR-103 for the Waterford
Steam Electric Station, Unit 3, and to the discussion of our findings with
Mr. L. Bass and other members of ycur staff at the conclusion of the inspection.
Areas examined during the inspection and our findings are (Hscussed in the
enclosed inspection report. Within these areas, the inspect on consisted of
selective examination of procedures and representative records, interviews
with perconnel, and observations by the inspectors.
We have also examined actions you have taken with regard to previously
identified inspection findings.
The status of these items is identified in
paragraph 2 of the enclosed report.
Within the scope of the inspection, no violations or deviations were
identified.
One new unresolved item is identified in paragraph 4c of the enclosed report.
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure
will be placed in the NRC Public Document Room unless you notify this office,
by telephone, within 10 days of the date of this letter, and submit written
application to withhold information contained therein within 30 days of the
date of this letter.
Such application must be consistent with the
requirements of 2.790(b)(1).
/20l
RPBl[DRRP&
RA/S$
f)
RPB2(
RPS-B A
CJohns /dsm
DHu icutt WSeidl
WCrotshen
GMadsen JGagli
d
JCo' lins
l
1/}D/83
1/10/83
1/// /83 1 / 11 / 8 3
1/JI/83
1/ p/ 3 j9/A'/83
k
u
8302070401[hh2
'
'
-
PDR ADOCK
0
- .-.
-.
- -- -.
-
--..
..
,
-
.
-
-
-
.
e
Louisiana Power and Light
2
Company
,
r
l
Should you have any questions concerning this inspection, we will be pleased
,
to discuss them with you.
Sincerely,
1
l
G. L. Madsen, Chief
Reactor Project Branch 1
Enclosure:
Appendix - NRC Inspection Report 50-382/82-29
.
cc w/ enc 1:
Louisiana Power and Light Company
ATTN:
F. J. Drummond, Project Support Manager
142 Delaronde Street
New Orleans, LA 70174
Mr. T. F. Gerrets, QA Manager
l
(same address)
Louisiana Power and Light Company
ATTN:
R. P. Barkhurst, Plant Manager
P.O. Box B
Killona, LA 70066
bec to DMB (IE01)
bcc distrib. by RIV:
RPB1
Resident Inspector
ELD
TPB
Section Chief (ES)
IE FILE
NRR/DHFS/0LB
MIS SYSTEM
C. Johnson
NRR/DSI/RAB
RIV File
R. Mullikin
LPDR
iiRC PDR
J. Bess
C. Wisner
W. Crossman
LA DIV. OF RAD. CONTROL
,
t
a
_ . _.
- . . .
- _ , _
-.
-.