ML20028G090

From kanterella
Jump to navigation Jump to search
Informs That Final Submittal for Deficiency Rept DER 82-39 Re C-E Valve Limit Switches (Class IE) Will Not Be Finalized Until 830325.Delay Due to Extensive Investigation & Evaluation Required
ML20028G090
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 01/26/1983
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Sternberg D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
10CFR-050.55E, ANPP-22824-GHD, DER-82-39, NUDOCS 8302070387
Download: ML20028G090 (2)


Text

.

Docket No. 50-528/529/530

. p

50.55(e) Report Arizona Public Service Comium Po Box ;tWe

  • PHOLNlx. AHilONA 85036
e. [] f s 4 I?: y January 26 l983 ANPP-22824 p,IVSS.K.s..

OH 4

U. S. Nuclear Regulatory Commission Region V Creekside Oaks Office Park 1450 Maria Lane - Suite 210 Walnut Creek, California 94596-5368 Attention:

Mr. D. M. Sternberg, Chief Reactor Projects Branch 1

Subject:

Time Extension for Report - DER 82-39 A 50.55(e) Potentially Reportable Deficiency Relating to CE Valve Limit Switches (Class IE) May Be Below Maximum LOCA Flood Level In Containment 3

File:

83-019-026 D.4.33.2

Reference:

(A) Telephone Conversation between G. liernandez and G. Duckworth on July 30, 1982 (B) ANPP-21722, dated August 30, 1982 (Interim Report)

(C) ANPP-22138, dated October 28,1982 (Time Extension)

Dear Sir:

1 The NRC was notified of a Potentially Reportable Deficiency in Reference (A), an Interim Report was transmitted by Reference (B),

i and a Time Extension was requested by Reference (C). At that time, it was estimated that a Final Report would be availabic by.chruary 3, 1983.

Due to the extensive investigation and evaluation required, it is now expected that this information will be finalized by March 25, 1983, when a complete report will be submitted.

There is no new information or change to the Interim Report at this time.

4 Very truly yo t

I c

C cLLL 0LR P E. E. Van Brunt, Jr.

8302070387 830126 APS lice President PDR ADOCK 05000528 Nuc_ car Projects S

PDR ANPP Project Director EEVBJr/ Gild:skc 1

cc:

See Attached Page 2

j7:?F

),

U. S. Nuclear Regulatory Commiesion Attention:

Mr. D. M. Sternberg, Chief ANPP-22824-GHD/BSK j

January 26, 1983 j

Page 2 cc: Richard DeYoung, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C.

20555 T. G. Woods, Jr.

J. A. Roedel D. B. Fasnacht G. C. Andognini J. R. Bynum B. S. Kaplan W. E. Ide A. C. Rogers J. Vorces J. A. Brand A. C. Gehr W. J. Stubblefield W. G. Bingham R. L. Patterson R. W. Welcher R. M. Grant D. R. Hawkinson L. E. Vorderbrueggen G. A. Fiorelli P. P. Klute Lynne Bernabei, Esq.

Harmon & Weiss 1725 "I" Street, NW Washington, D. C.

20006 R. L. Greenfield Assistant Attorney General Bataan Memorial Builting Santa Fe, New Mexico 87503